Loading...
RES 2020-0455 - Interlocal Agmt with S&ID 404 for construction of interceptor sewer1 INTERLOCAL COOPERATION AGREEMENT This Interlocal Cooperation Agreement (this “Agreement”) is made and entered into by and between the City of Omaha, Nebraska (hereinafter referred to as the “City”), and Sanitary and Improvement District No. 404 of Douglas County, Nebraska (hereinafter referred to as “SID 404”). RECITALS WHEREAS, the City’s Interceptor Sewer Master Plan approved by the Omaha City Council on August 18, 2015 contemplates the construction of certain sanitary sewer improvements in the Elkhorn Area, denoted on such plan as “Footnote #1” and WP-244.1; and WHEREAS, the City has decided that the location of the interceptor sewer denoted as “Footnote #1” should be constructed as a lift station and forcemain along Fort Street to tie-into the future interceptor sanitary sewer system noted WP-244.1 and what has been recently constructed as WP-243.1c and WP-243.1d (OPW-53193), which new interceptor sewer improvements are depicted on Exhibit “B” attached hereto (the “Interceptor Sewer Improvements”); and WHEREAS, the City has requested that SID 404 construct the Interceptor Sewer Improvements and the City and SID 404 desire to enter into this Agreement to provide for the design, construction, operation, maintenance, repair, replacement, regulation, payment and ownership of the Interceptor Sewer Improvements; and WHEREAS, it is in the best interest and is mutually advantageous to the City and SID 404 to enter into this Agreement to provide for the construction of the Interceptor Sewer Improvements. NOW, THEREFORE, in consideration of the covenants herein set forth, the City and SID 404 do hereby agree and contract with each other as follows: 1. No Administrative Entity. There shall be no separate legal or administrative entity created to administer this Agreement and, therefore, no separate budget established for such an entity. 2. Easement Acquisition. SID 404 shall acquire the appropriate permanent and temporary construction easements for the locations in which the Interceptor Sewer Improvements will be constructed. The easements shall run to the benefit of the City and SID 404 and shall be in the form approved by the City; provided, however, that the permanent easements shall run only to the benefit of the City. The costs associated with the acquisition of the necessary easements shall be paid by the City pursuant to Section 5 hereof. 3. Construction Contract Documents and Construction Management and Supervision. SID 404 will contract with Olsson (“Project Engineer”), registered engineers in the State of Nebraska, for the preparation of plans and specifications for the construction of the Interceptor Sewer Improvements (“Construction Contract Documents”). The final Construction Contract Documents shall be subject to approval by each of the parties hereto, which approval shall not be unreasonably withheld, conditioned, or delayed. Construction management and construction supervision of the construction and installation of the Interceptor Sewer Improvements shall be performed by the Project Engineer. 4. Construction. SID 404 agrees to cause the Interceptor Sewer Improvements to be constructed in accordance with the Construction Contract Documents approved by the parties hereto in accordance with Paragraph 3. Construction supervision, administration, and management shall be performed by the Project Engineer on behalf of the City and SID 404. During the course of the construction of the Interceptor Sewer Improvements, the Project Engineer will inspect the work to ensure compliance with the Construction Contract Documents in all material respects. 5. Total Cost of the Interceptor Sewer Improvements. Project Engineer shall review the contractors’ invoices related to the Interceptor Sewer Improvements construction for accuracy and compliance with the Construction Contract Documents. Once approved by the Project Engineer, SID 404 shall submit directly to the City, along with a recommendation for payment, which the City shall then pay within thirty (30) days of receipt of the same. SID 404 shall submit invoices for professional services related to the Interceptor Sewer Improvements directly to the City, which the City shall pay within thirty (30) days of receipt of the same. Payment for the Interceptor Sewer Project shall be made from the Interceptor Sewer Fund. In addition, all costs associated with the acquisition of any required easements, permanent and temporary, shall be paid for by the City. 6. Engineer’s Estimate of Total Cost of the Interceptor Sewer Improvements. The Project Engineer’s estimate of the cost of the Interceptor Sewer Improvements is set forth in Exhibit “A” attached hereto. 7. Bid Letting. The Project Engineer shall take competitive bids, perform project management, and certify the completion of the Interceptor Sewer Improvements in accordance with the Construction Contract Documents to the City. Following the receipt of the bids, the awarding of the contract shall take place only following the concurrence, in writing, by the City of Omaha Public Works Department. All change orders shall be subject to review by the City of Omaha Public Works Department prior to approval. 8. Ownership of the Interceptor Sewer Improvements. Upon completion of the Interceptor Sewer Improvements, the City shall own, operate and maintain the Interceptor Sewer Improvements. SID 404 shall convey by proper legal instrument all its rights, easements, title, and interest in the Interceptor Sewer Improvements to the City. The form of acquisition shall be upon approved City forms. 9. Purpose of Agreement; Timing of Work. It is the mutual desire and intention of the parties that construction of the Interceptor Sewer Improvements shall be completed by October 31, 2020. Accordingly, the parties agree to cooperate with each other and make reasonable, good faith efforts to perform their obligations hereunder in a timely manner so as to achieve completion of all of the Interceptor Sewer Improvements contemplated by the Agreement by October 31, 2020. 10. Records. SID 404 shall maintain records of all construction and other costs incurred in connection with the Interceptor Sewer Improvements and the City shall have the right to audit and review such records at any time to assure that such records are accurate. City reserves the right to withhold final payment until as-built record drawings are submitted. 11. Duration. This Agreement shall continue until such time as the Interceptor Sewer Improvements to be performed by SID 404 pursuant to this Agreement have been completed, unless this Agreement is terminated sooner by the written agreement of all parties hereto. 12. Appointment of Administrators. The Project Engineer shall administer this contract on behalf of SID 404 and the City. 13. Entire Agreement. This instrument contains the entire agreement of the parties and shall be binding upon the successors and assigns of the respective parties. No amendments, deletions, or additions shall be made to the Agreement except in writing signed by all parties. 14. Drug Free Workplace Policy. All parties to this Agreement represent that it has established and maintains a drug free workplace policy. 15. Nondiscrimination. In accordance with the Nebraska Fair Employment Act, Neb. Rev. Stat. §48-1122, all parties to this Agreement represent that neither it nor any of its subcontractors or agents shall discriminate against any employee, or applicant for employment to be employed in the performance of this Agreement, with respect to hire, tenure, terms, conditions, or privileges or employment because of the race, color, religion, sex, disability, or national origin of the employee or applicant. 16. New employee work eligibility status. All parties are required and hereby agree to use a federal immigration verification system to determine the work eligibility status of new employees physically performing services within Nebraska. A federal immigration verification system means the electronic verification of the work authorization program authorized by the Illegal Immigration Reform and Immigrant Responsibility Act of 1996, 8 U.S.C. 1324a, known as the E-Verify Program, or equivalent federal program designated by the United States Department of Homeland Security or other federal agency authorized to verify the work eligibility status of newly hired employees. [Remainder of Page Left Intentionally Blank; Execution Page Follows.] Bid Item Description Approximate Quantity Unit Unit Price Total General: 001 Mobilization / Demobilization 1.00 LS $200,000.00 $200,000.00 002 Clearing and Grubbing - General 1.00 LS $15,000.00 $15,000.00 003 Install Construction Entrance 5.00 EA $2,500.00 $12,500.00 004 Remove Construction Entrance 5.00 EA $2,500.00 $12,500.00 005 Remove and Relay 12" Aggregate Surface Course 637.00 SY $10.00 $6,370.00 006 Install Silt Fence 9,000.00 LF $3.00 $27,000.00 007 Install Seeding - Type B 5.75 AC $2,000.00 $11,500.00 008 Install Seeding - Type Channel Seed 0.50 AC $5,000.00 $2,500.00 009 Install Cover Crop Seeding 16.00 AC $500.00 $8,000.00 010 Install Rolled Erosion Control - Type II 3,000.00 SY $3.00 $9,000.00 011 Install Rolled Erosion Control - Type III 372.00 SY $5.00 $1,860.00 012 Install Flexamat 470.00 SY $75.00 $35,250.00 013 Dewatering 60.00 DAY $1,000.00 $60,000.00 014 Install and Remove Concrete Washout 3.00 EA $2,500.00 $7,500.00 Gravity Sewer: 101 Remove and Reinstall Wood Fence 71.00 LF $15.00 $1,065.00 102 Construct Aggregate Bedding for 12" PVC Sewer Pipe (Type F2)34.00 LF $20.00 $680.00 103 Construct Aggregate Bedding for 15" PVC Sewer Pipe (Type F3)146.00 LF $20.00 $2,920.00 104 Construct Aggregate Bedding for 15" VCP Sewer Pipe (Type R1)1,433.00 LF $15.00 $21,495.00 105 Construct Aggregate Bedding for 15" VCP Sewer Pipe (Type R2)396.00 LF $20.00 $7,920.00 106 Construct Aggregate Bedding for 15" VCP Sewer Pipe (Type R3)2,014.00 LF $15.00 $30,210.00 107 Construct Aggregate Bedding for 18" VCP Sewer Pipe (Type R2)1,063.00 LF $15.00 $15,945.00 108 Construct Aggregate Bedding for 18" VCP Sewer Pipe (Type R3)1,007.00 LF $15.00 $15,105.00 109 Construct Aggregate Bedding for 24" Sewer Pipe (Type R3)156.00 LF $20.00 $3,120.00 110 Construct Aggregate Bedding for Trench Stabilization 1,250.00 CY $40.00 $50,000.00 111 Construction Foundation Rock for Trench Stabilization 1,250.00 CY $50.00 $62,500.00 112 Construction Trench Excavation (Unsuitable Material)1,250.00 CY $30.00 $37,500.00 113 Construct Type C Riprap for Trench Stabilization 1,250.00 CY $115.00 $143,750.00 114 Construct 12" PVC Sanitary Sewer Pipe, SDR 35 34.00 LF $45.00 $1,530.00 115 Construct 15" PVC Sanitary Sewer Pipe, SDR 26 146.00 LF $55.00 $8,030.00 116 Construct 15" VCP Sanitary Serwer Pipe 3,843.00 LF $110.00 $422,730.00 117 Construct 18" VCP Sanitary Sewer Pipe 2,069.00 LF $135.00 $279,315.00 118 Directional Bore 12" R.J. PVC Sanitary Sewer Pipe, DR18 396.00 LF $135.00 $53,460.00 119 Tunnel 24" Steel Casing w/ 15" Sanitary Sewer 113.00 LF $400.00 $45,200.00 120 24" Steel Casing w/ 15" Sanitary Sewer 156.00 LF $215.00 $33,540.00 121 Tunnel 26" Steel Casing w/ 18" Sanitary Sewer 97.00 LF $500.00 $48,500.00 122 Construct 18" Sanitary Sewer Manhole Tap 1.00 EA $1,500.00 $1,500.00 123 Construct 12" Sanitary Sewer Pipe Plug 1.00 EA $500.00 $500.00 124 Construct 54" I.D. Sanitary Manhole 224.80 VF $400.00 $89,920.00 125 Construct 54" I.D. Sanitary Manhole (>15' Deep)76.70 VF $750.00 $57,525.00 126 Construct 54" I.D. Sanitary Manhole (Interior Corrosive Lining)6.70 VF $750.00 $5,025.00 127 Excavation On-Site 208.00 CY $5.00 $1,040.00 128 Remove Topsoil 914.00 SY $1.50 $1,371.00 129 Place Topsoil 914.00 SY $2.00 $1,828.00 130 Install External Frame Seal 27.00 EA $500.00 $13,500.00 131 Perform CCTV Pipeline Inspection 6,853.00 LF $1.50 $10,279.50 132 Clean Sanitary Sewer Pipe 6,853.00 LF $1.50 $10,279.50 133 Construct Concrete Manhole Ring Collar 25.00 EA $400.00 $10,000.00 Lift Station / Force Main: 201 Construct Air Release Structure 1.00 EA $6,000.00 $6,000.00 202 Construct 10" PVC Sanitary Sewer Force Main 1,862.00 LF $115.00 $214,130.00 203 16" Steel Casing w/ 10" Sanitary Pipe 326.00 LF $350.00 $114,100.00 204 Directional Bore 10" R.J. PVC Sanitary Sewer Force Main, DR14 913.00 LF $125.00 $114,125.00 205 Directional Bore 10" R.J. PVC Sanitary Sewer Force Main, DR18 485.00 LF $117.00 $56,745.00 206 Construct Lift Station and Building 1.00 LS $965,000.00 $965,000.00 207 Subgrade Preparation (Established Quantity)588.00 SY $2.50 $1,470.00 208 Construct 9-inch Concrete Pavement (Type L65)588.00 SY $65.00 $38,220.00 209 Apply Penetrating Concrete Sealer 588.00 SY $8.00 $4,704.00 210 Construct 12" Recycled PCC Surface Course 60.00 SY $10.00 $600.00 211 Excavation On-Site 1,170.00 CY $5.00 $5,850.00 212 Remove Topsoil 1,941.00 SY $1.50 $2,911.50 213 Place Topsoil 1,941.00 SY $2.00 $3,882.00 214 Reconstruct and Connect Barbed Wire Fence 201.00 LF $10.00 $2,010.00 215 Construct 8' Chainlink Fence 310.00 LF $32.00 $9,920.00 216 Construct 22' Chainlink Fence Gate (Slide Gate)1.00 EA $7,500.00 $7,500.00 CONTINGENCY 5%$172,171.53 Estimated Construction Costs:$3,615,602.03 Estimated Soft Costs: 16.6%Engineering Design & CA $600,000.00 3.0%Legal $108,468.06 Total Estimated Soft Costs:19.6%$708,468.06 Total Estimated Construction Costs:$4,324,070.09 INTERCEPTOR SANITARY SEWER EXHIBIT "A" ENGINEER'S ESTIMATE OF TOTAL COST OF THE INTERCEPTOR SEWER IMPROVEMENTS Bid Item Description Approximate Quantity Unit Unit Price Total 1 Permanent Sanitary Sewer Easement - Vananne 0.41 AC $35,000.00 $14,350.00 2 Temporary Sanitary Sewer Easement - Vananne 1.30 AC $10,000.00 $13,000.00 3 Permanent Sanitary Sewer Easement - EELL LLC 0.84 AC $35,000.00 $29,400.00 4 Temporary Sanitary Sewer Easement - EELL LLC 1.93 AC $10,000.00 $19,300.00 5 Permanent Sanitary Sewer Easement - 18818 Fort LLC 0.15 AC $35,000.00 $5,250.00 6 Temporary Sanitary Sewer Easement - 18818 Fort LLC 0.26 AC $10,000.00 $2,600.00 7 Permanent Sanitary Sewer Easement - Gottsch Family Farms 3.48 AC $35,000.00 $121,800.00 8 Temporary Sanitary Sewer Easement - Gottsch Family Farms 14.84 AC $10,000.00 $148,400.00 Estimated Construction Costs:$354,100.00 Estimated Soft Costs: 4.9%Engineering Design & CA $17,500.00 3.0%Legal $10,623.00 Total Estimated Soft Costs:7.9%$28,123.00 Total Estimated Easement Costs:$382,223.00 Estimated Construction & Easement Costs:$3,969,702.03 Estimated Construction & Easement Soft Costs:$736,591.06 Total Estimated Construction and Easemetn Costs:$4,706,293.09 INTERCEPTOR SANITARY SEWER - EASEMENTS EXHIBIT "A" ENGINEER'S ESTIMATE OF TOTAL COST OF THE INTERCEPTOR SEWER IMPROVEMENTS NOT APPROVED FOR CONSTRUCTION I Know what’s belOW. Call before you dig. CALL 811 SEVENTY-TWO HOURS PRIOR TO DIGGING, GRADING OR EXCAVATING FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES drawn by: checked by: approved by: QA/QC by: project no.: OPWno.: _ date: AKK/AGF AKK AKK KMS E16-2322 53642 - SOS, OS 02.12.2020 SHEET A1.1 N 0’ 150’ 300’ SCALE IN FEET 600 (GMH.14 / 1333805)- ( GMH.13 / 1333804^ (GMH.12 / 1333803 )—| O'X'xVc’V1'1 #//-5 GMH.15 / 1333351) GMH.16 / 1333352) /-(GMH.17 / 1333806^)SHEET C3.5 —*y. \Vv,w K5SJ B (GMH.09 / 1332802 (GMH.08 / 1332801 ~ (GMH.07 / 1376810 .0^&v \ -( GMH.11 / 1333802) L-( GMH.10 / 1333801) \/ (GMH.18 / 1332803' ( GMH.19 / 1332804 (GMH.20 / 1332805 □toto 1 n-ILlI 1 T\LU X \CO \ (GMH.06 / 1376808 \cH \% ,\Y*' q. l *. (_A ( GMH.21 / 1288801 ^ (GMH.22 / 1288802 (GMH.23 / 1288803 (GMH.24 / 1288804 I (GMH.05 / 1376807X;!;X \5>§■ \FUTURE FORT STREET REALIGNMENT CM(GMH.03 / 1376805 )—|\tooWM (GMH.02 / 1376804 )—[t I UJ I _ [EXMH.01 / 1288805GMH.203 / 1420365)v y-/—( GMH.04 / 1376806)1376801)IFQRI ST irx ti*&■ _—I p-°h — ■ FMi ----------1---- f=ui /_£=^etLr+prrnFFHP CM_■J--UFF EXISTING 18 INTERCEPTOR SEWERSHEET C0.1-C1.4. C5.1-C5.2 -I t OH M SHEET C3.1\/\ SHEET C2.5T * SHEET C2.4= SHEET C2.2 gpg SHEET C2.37 /////III /ii—///“1I I,X.II'l fGMH.01 / 1376802 START GRAVITY MAIN imI/// MC. & I I END FORCE MAINSHEET C2.1, C4.1 / AW1 #6°// v / i &i/r — —V /hI85 —(GMH.202 / 1420364) (GMH.201 / 1420363~) / lpVl i A:l I■V \ \i0N>\/ —1—\Cr%r i\rli/8?I-ingij||CONCEPTUAL FUTURE LOT LAYOUTCD I \\ \) Xo i 0?/CM // g9^ & # H Z CM CD 1 \ \ X X _REVISIONSOMAHA, NE2020192ND AND FORT INTERCEPTOR SEWERSID 404- INDIAN CREEKSHEET LAYOUT INDEX MAPONREVISIONS DESCRIPTIONDATEREV.2111 South 67th Street, Suite 200Omaha, NE 68106www.olsson.comTEL 402.341.1116FAX 402.341.5895olssonDWG: F: \2016\2001 -2500\016-2322-E\40-Design\AutoCAD\Final Plans\GNCV\Sheets\C_M AP_E162322.dwg DATE: Feb 13, 2020 10:07pm C_FBNDY_E162322P_SSWR_E162322P_SSWR—LIFT-STA_E162322C_AERIAL_E162322C_PSSWR_E162322USER: akrejci C_XBNDY_E162322C_XBASE_E162322C_XWTLD_E162322XREFS: C_PTBLK_E162322WP-243.1d EXHIBIT "B"INTERCEPTOR SEWER IMPROVEMENTSEXHIBIT "B"