Loading...
RES 2020-0163 - PSA with JEO Consulting for OPW 53790 - Fire Station 33 Sleeping Qtr ImprovementsAPPARATUSROOMGEN.RM.BDR-1BDR-2BDR-3BDR-4KITCHENLOUNGEMENSWOMENSBDR-6BDR-5STAIRSBDR-7(E)STOR.CHIEF'SOFFICEOFFICESTOR.HALLLINENJAN.BDR-8(E)BDR-9(E)HALLSTOR.TOILETTOILET*****Omaha Fire Station #33Date: 06-08-2012800.723.8567‹-(2&RQVXOWLQJ*URXS,QFExisting Floor PlanScale: 3/32" - 1'-0"Project No. 120149.00NOTES:- ALL LOCKERS ARE 24"X24" UNLESS OTHERWISE INDICATED WITH (*),WHICH WOULD INDICATE A 18"X24" LOCKER- DOORS TO NEW SLEEPING UNITS ARE 36" UNLESS OTHERWISEINDICATED WITH (*), WHICH WOULD INDICATE A 32" DOOR-(E) INDICATES EXISTING SLEEPING UNIT, INCLUDED IN THE TOTALDESIGNED COUNTTemporarySleeping AreaDuringConstructionrenovate kitchen to include Type IIhood, stainless-steel countertops,shelves, and cabinets,renovate to create6 sleeping roomsupdate finishes in this area,primarily new paint, wall furringwith electrical outlets, newceiling with diffusers, lightingrenovate toilet roomfor shower accessfrom hallmodify lighting switching thisarea so room areas can beswitched separately