RES 2015-1221 - Contract with Swain Construction for OPW 52588, 204th St and Cumberland Dr intersection improvements 01-1 H(AH A,lyF C: r - r`i
,:, =i sR ;.{ r- r-- i Y
9• i s 1... Via E_.
s7 Public Works Department
i� Omaha/Douglas Civic Center
z t t - „ September 22, 2015 yy !, � I►
n [ f 2D 15 SEP { I 1819 Famam Street,Suite 601
�� �` Omaha,Nebraska 68183-0601
��rFo FEaR4 (402)444-5220
CITY CLERK Fax (402)444-5248
City of Omaha rl f.' 3 jy ES1 ,&S K t--
Robert G. Stubbe,P.E.
Jean Stothert,Mayor Public Works Director
Honorable President
and Members of the City Council,
The attached Resolution approves the contract with Swain Construction, Inc. for OPW 52588
being the 204th Street and Cumberland Drive, Intersection Improvements project.
The following bids were received on August 19, 2015. A detailed bid tabulation is attached.
Contractor Total Bid
Swain Construction, Inc. $362,628.77 (Low Bid)
Spencer Management LLC Non-Compliant
Mackie Construction, Inc. Non-Compliant
Swain Construction, Inc. has a current Contract Compliance Report Form (CC-1) on file. As is
City policy, the Human Rights and Relations Department will review the contractor to ensure
compliance with the Contract Compliance Ordinance.
The Finance Department is authorized to pay the cost of OPW 52588 from the 2010
Transportation Fund 13183, and Transportation Bonds Organization 117117.
The Public Works Department recommends the acceptance of the bid from Swain Construction,
Inc. in the amount of $362,628.77, being the lowest and best bid received, and requests your
consideration and approval of this Resolution.
Res ectfully submitte Referred to City Council for Consideration:
"4' 9-2 -15-- 1114..,3k--UeJ. ct ci -
Ro ert G. Stubbe, P.E. Date Mayor's Office ' /( Date
Public Works Director
Approved as to Fun Approved:
_ 6
< 9 � 1�
Steph . Curtiss Date Sp cer K. Danner Jr. Date
-gp Finance Director Human Rights and Relati s Director
1052hra
- Bid Tabulation
Public Works Department
Omaha, Nebraska
Wednesday, August 19, 2015
Project Summary
OPW 52588 English Yes
Metric: No
Description: 204TH AND CUMBERLAND INTERSECTION IMPROVEMENTS
Start Date: Completion Date:
Labor Release Date:
Field Book Number: Test Core Lengths:
Council Resolution: Adoption Date:
Percent Reserve Due: 10.0%
Percent Complete: 0.0% Percent Time Used: 0.0%
Engineer's Total: $657,325.95
Contract Total $0.00
Total Penalties: $0.00
Total Payments: $0.00
Contractor:
Phone#:
Fax#:
Email address:
Page 1 of 9, 8/19/2015 2:25:41 PM, Bid Tabulation, Generated by: admin for project OPW 52588
' Account/Funding Summary
Fund Org. Description Engineer Contract Penalties Payments
13183 117117 2012 Issue Transportation Bonds $657,325.95 $0.00 $0.00 $0.00
$657,325.95 $0.00 $0.00 $0.00
Page 2 of 9, 9/1/2015 4:15:38 PM, Bid Tabulation, Generated by: admin for project OPW 52588
Bid Summary(low to high bidder)
Contractor
Engineer's Estimate: $657,325.95
Diff From Low: $341,887.54
Spencer Management,LLC Bid: $315,438.41
PO Box 11623 Diff From Low: $0.00
Omaha NE 68131-
Swain Construction,Inc. Bid: $362,628.77
6002 North 89th Circle Diff From Low: $47,190.36
Omaha NE 68134-
Mackie Construction,LLC Bid: $372,063.67
6232 North 155th Avenue Diff From Low: $56,625.26
Omaha NE 68116-
Number of Bids: 3
Low Bid: $315,438.41*IF
High Bid: $372,063.67
Average Bid:: $350,043.62
-419 (5,41/01#V)
an 'ca.-des eta;-� ��.l�f�`�`,�. '` '-�� s wed v e___
Page 3 of 9, 8/19/2015 2:25:41 PM, Bid Tabulation, Generated by: admin for project OPW 52588
Type Line# Item # Description Quantity Price Total
1 0101.020 INSTALL CURB INLET PROTECTION
Engineeer's Estimate 3
@ $270.00 EACH $810.00
Spencer Management, LLC $100.00 EACH $300.00
Swain Construction, Inc. $228.00 EACH $684.00
Mackie Construction, LLC $332.00 EACH $996.00
2 0101.040 INSTALL CONSTRUCTION ENTRANCE
Engineeer's Estimate 3
@ $3,000.00 EACH $9,000.00
Spencer Management, LLC $500.00 EACH $1,500.00
Swain Construction, Inc. $552.00 EACH $1,656.00
Mackie Construction, LLC $4,641.00 EACH $13,923.00
3 0102.000 CLEARING AND GRUBBING-GENERAL
Engineeer's Estimate 1 @ $1,200.00 per LS $1,200.00
Spencer Management,LLC $1,500.00 per LS $1,500.00
Swain Construction, Inc. $3,593.00 per LS $3,593.00
Mackie Construction,LLC $4,641.00 per LS $4,641.00
4 0103.450 REMOVE SIGN
Engineeer's Estimate 1
@ $245.00 EACH $245.00
Spencer Management, LLC $250.00 EACH
$250.00
Swain Construction, Inc. $860.00 EACH $860.00
Mackie Construction,LLC $47.00 EACH $47.00
5 0105.100 REMOVE PAVEMENT
Engineeer's Estimate 1596 @ $14.00 per SY $22,344.00
Spencer Management, LLC $10.00 per SY $15,960.00
Swain Construction, Inc. $12.90 per SY $20,588.40
Mackie Construction,LLC $14.83 per SY $23,668.68
6 0105.140 REMOVE SIDEWALK
Engineeer's Estimate 992 @ $7.00 per SF $6,944.00
Spencer Management, LLC $1.00 per SF
$992.00
Swain Construction, Inc. $1.63 per SF $1,616.96
Mackie Construction,LLC $1.34 per SF $1,329.28
7 0105.150 REMOVE MEDIAN SURFACING
Engineeer's Estimate 10606 @ $12.00 per SF $127,272.00
Spencer Management, LLC $1.00 per SF $10,606.00
Swain Construction, Inc. $1.75 per SF $18,560.50
Mackie Construction, LLC $1.06 per SF $11,242.36
8 0504.000 CONSTRUCT CURB RAMP
Engineeer's Estimate 115 @ $15.00 per SF $1,725.00
Spencer Management, LLC $14.00 per SF $1,610.00
Swain Construction, Inc. $15.35 per SF $1,765.25
Mackie Construction,LLC $8.86 per SF $1,018.90
9 0504.100 CONSTRUCT DETECTABLE WARNING PANEL
Engineeer's Estimate 16 @ $16.00 per SF $256.00
Spencer Management,LLC $28.00 per SF $448.00
Swain Construction, Inc. $19.75 per SF $316.00
Mackie Construction,LLC $16.59 per SF $265.44
Page 4 of 9, 8/19/2015 2:25:41 PM, Bid Tabulation, Generated by: admin for project OPW 52588
Type Line# Item# Description Quantity Price Total
10 0702.760 ADJUST MANHOLE TO GRADE
Engineeer's Estimate 5
@ $350.00 EACH $1,750.00
Spencer Management, LLC $200.00 EACH $1,000.00
Swain Construction, Inc. $275.00 EACH $1,375.00
Mackie Construction,LLC $465.00 EACH $2,325.00
11 0803.000 INSTALL ROLLED EROSION CONTROL,TYPE I
Engineeer's Estimate 393 @ $4.00 per SY $1,572.00
Spencer Management, LLC $1.10 per SY $432.30
Swain Construction, Inc. $2.34 per SY $919.62
Mackie Construction,LLC $3.66 per SY $1,438.38
12 0804.000 INSTALL SODDING
Engineeer's Estimate 103 @ $7.00 per SY $721.00
Spencer Management, LLC $9.00 per SY $927.00
Swain Construction, Inc. $11.40 per SY $1,174.20
Mackie Construction, LLC $13.26 per SY $1,365.78
13 0833.003 INSTALL 2/C#16 AWG PEDESTRIAN PUSH BUTTON LEAD-IN CABLE
Engineeer's Estimate 300 @ $1.25 per LF $375.00
Spencer Management,LLC $1.23 per LF $369.00
Swain Construction, Inc. $2.45 per LF $735.00
Mackie Construction,LLC $1.64 per LF $492.00
14 0833.004 INSTALL 1/C#6 BARE COPPER GROUNDING CONDUCTOR
Engineeer's Estimate 7 @ $1.35 per LF $9.45
Spencer Management, LLC $1.16 per LF $8.12
Swain Construction, Inc. $4.01 per LF $28.07
Mackie Construction, LLC $1.55 per LF $10.85
15 0901.032 INSTALL COMBINATION MAST ARM SIGNAL&LIGHTING POLE,TYPE CMP-70-12
Engineeer's Estimate 1 @ $17,800.00 EACH $17,800.00
Spencer Management, LLC $14,313.00 EACH $14,313.00
Swain Construction, Inc. $8,287.00 EACH $8,287.00
Mackie Construction, LLC $16,341.00 EACH $16,341.00
16 0901.080 INSTALL 200W STREET LIGHT LUMINAIRE
Engineeer's Estimate 1
@ $980.00 EACH $980.00
Spencer Management, LLC $250.00 EACH $250.00
Swain Construction, Inc. $835.00 EACH $835.00
Mackie Construction,LLC $332.00 EACH $332.00
17 0902.001 INSTALL TRAFFIC SIGNAL,TYPE TS-1 w/T31 FACE, BKPLT&MA-5 MTG
Engineeer's Estimate 3 @ $980.00 EACH $2,940.00
Spencer Management, LLC $786.00 EACH $2,358.00
Swain Construction, Inc. $991.00 EACH $2,973.00
Mackie Construction, LLC $1,043.00 EACH $3,129.00
18 0902.002 INSTALL TRAFFIC SIGNAL,TYPE TS-1A w/T31 FACE&B-4 ALT.MTG
Engineeer's Estimate 2 @ $980.00 EACH $1,960.00
Spencer Management, LLC $671.00 EACH $1,342.00
Swain Construction, Inc. $763.00 EACH $1,526.00
Mackie Construction, LLC $890.00 EACH $1,780.00
19 0902.005 INSTALL TRAFFIC SIGNAL,TYPE TS-1LL w/T51A FACE,BKPLT&MA-5-1 MTG
Engineeer's Estimate 2 @ $1,600.00 EACH $3,200.00
Spencer Management,LLC $1,223.00 EACH $2,446.00
Swain Construction, Inc. $1,621.00 EACH $3,242.00
Mackie Construction,LLC $1,622.00 EACH $3,244.00
Page 5 of 9, 8/19/2015 2:25:41 PM, Bid Tabulation, Generated by: admin for project OPW 52588
Type Line# Item# Description Quantity Price Total
20 0902.020 INSTALL PEDESTRIAN SIGNAL,TYPE PS-1 w/T-23 FACE&B-4 ALT.MTG
Engineeer's Estimate 2 @ $740.00 EACH $1,480.00
Spencer Management, LLC $604.00 EACH $1,208.00
Swain Construction, Inc. $685.00 EACH $1,370.00
Mackie Construction, LLC $801.00 EACH $1,602.00
21 0902.030 INSTALL PEDESTRIAN PUSH BUTTON
Engineeer's Estimate 2 @ $240.00 EACH
$396.00
Spencer Management, LLC
$198.00 EACH $396.00
Swain Construction, Inc. $306.00 EACH $612.00
Mackie Construction,LLC $263.00 EACH $526.00
22 0904.013 INSTALL PULL BOX,TYPE PB-6, FIBER BOX
Engineeer's Estimate 4 @ $800.00 EACH
$3,200.00
Spencer Management, LLC $640.00 EACH $2,560.00
Swain Construction, Inc. $819.00 EACH $3,276.00
Mackie Construction,LLC $849.00 EACH $3,396.00
23 0904.021 INSTALL 3"PVC CONDUIT-TRENCHED
Engineeer's Estimate 7
@ $10.00 per LF $70.00
Spencer Management,LLC $7.12 per LF $49.84
Swain Construction, Inc. $22.30 per LF $156.10
Mackie Construction,LLC $9.45 per LF $66.15
24 0904.043 INSTALL 16/C NO. 14 AWG TRAFFIC SIGNAL CABLE
Engineer's Estimate 150 @ $5.00 per LF $750.00
Spencer Management,LLC $4.78 per LF $717.00
Swain Construction, Inc. $4.01 per LF $601.50
Mackie Construction,LLC $6.34 per LF $951.00
25 0905.000 REMOVE MARKING LINES
Engineeer's Estimate 401 @ $1.00 per LF $401.00
Spencer Management, LLC $2.50 per LF $1,002.50
Swain Construction, Inc. $2.78 per LF $1,114.78
Mackie Construction, LLC $3.32 per LF $1,331.32
26 0905.053 INSTALL PERMANENT PREFORMED TAPE MARKING-TYPE 4, 5"WHITE,GROOVED
Engineeer's Estimate 1076 @ $1.00 per LF $1,076.00
Spencer Management,LLC $5.90 per LF $6,348.40*
Swain Construction, Inc. $3.90 per LF $4,196.40
Mackie Construction,LLC $4.65 per LF $5,003.40
27 0905.073 INSTALL PERMANENT PREFORMED TAPE MARKING-TYPE 4, 10"WHITE, GROOVED
Engineeer's Estimate 818 @ $2.50 per LF $2,045.00
Spencer Management, LLC $10.00 per LF $8,180.00
Swain Construction, Inc. $7.80 per LF $6,380.40
Mackie Construction,LLC $9.29 per LF $7,599.22
28 0905.401 INSTALL PERMANENT MARKING TAPE SYMBOL-TYPE DIRECTIONAL ARROW,WHITE
Engineeer's Estimate 4
@ $180.00 EACH $720.00
Spencer Management, LLC $340.00 EACH $1,360.00
Swain Construction, Inc. $379.00 EACH $1,516.00
Mackie Construction, LLC $451.00 EACH $1,804.00
29 0906.000 INSTALL OVERHEAD SIGNS,SIGNS PROVIDED BY CITY
Engineeer's Estimate 1
@ $750.00 per LS $750.00
Spencer Management,LLC $571.00 per LS $571.00
Swain Construction, Inc. $752.00 per LS $752.00
Mackie Construction, LLC $758.00 per LS $758.00
Page 6 of 9, 8/19/2015 2:25:41 PM, Bid Tabulation, Generated by:admin for project OPW 52588
Type Line# Item# Description Quantity Price Total
30 0906.010 INSTALL TRAFFIC POSTS AND SIGNS,SIGNS PROVIDED BY CITY
Engineeer's Estimate 1
@ $300.00 per LS $300.00
Spencer Management, LLC $382.00 per LS $382.00
Swain Construction, Inc. $446.00 per LS $446.00
Mackie Construction,LLC $507.00 per LS $507.00
31 0906.110 FURNISH FLASHING ARROW PANEL
Engineeer's Estimate 56 @ $500.00 per DAY $28,000.00
Spencer Management, LLC $40.00 per DAY $2,240.00
Swain Construction, Inc. $44.55 per DAY $2,494.80
Mackie Construction, LLC $54.11 per DAY $3,030.16
32 0906.210 PROVIDE TEMPORARY TRAFFIC CONTROL
Engineeer's Estimate 56 @ $900.00 per DAY $50,400.00
Spencer Management, LLC $84.00 per DAY
$4,704.00
Swain Construction, Inc. $93.55 per DAY $5,238.80
Mackie Construction, LLC $113.61 per DAY $6,362.16
33 1102.000 REMOVE AND INSTALL NEW SPRINKLER SYSTEM HEAD
Engineeer's Estimate 5 @ $120.00 EACH
$600.00
Spencer Management, LLC $85.00 EACH $425.00
Swain Construction, Inc. $83.55 EACH $417.75
Mackie Construction,LLC $66.30 EACH $331.50
34 1102.010 REMOVE AND INSTALL NEW SPRINKLER SYSTEM TRUNK LINE
Engineeer's Estimate 50 @ $18.00 per LF $900.00
Spencer Management, LLC $9.75 per LF $487.50
Swain Construction, Inc. $11.15 per LF $557.50
Mackie Construction, LLC $26.52 per LF $1,326.00
35 1102.020 REMOVE AND INSTALL NEW SPRINKLER VALVE BOX
Engineeer's Estimate 1 @ $240.00 EACH $240.00
Spencer Management, LLC $650.00 EACH $650.00
Swain Construction, Inc. $2,785.00 EACH $2,785.00
Mackie Construction,LLC $1,989.00 EACH $1,989.00
36 1200.010 EXCAVATION(ESTABLISHED QUANTITY)
Engineeer's Estimate 200 @ $12.00 per CY $2,400.00
Spencer Management, LLC $26.00 per CY
$5,200.00
Swain Construction, Inc. $21.65 per CY $4,330.00
Mackie Construction,LLC $66.68 per CY $13,336.00
37 1200.020 CONSTRUCT 10-INCH COMBINATION CURB AND GUTTER(TYPE 47B-3500)
Engineeer's Estimate 92 @ $30.00 per LF $2,760.00
Spencer Management,LLC $35.00 per LF
$3,220.00
Swain Construction, Inc. $30.95 per LF $2,847.40
Mackie Construction, LLC $20.74 per LF $1,908.08
38 1200.030 CONSTRUCT PCC MEDIAN SURFACING(TYPE 47B-HE)
Engineeer's Estimate 6714 @ $11.00 per SF $73,854.00
Spencer Management, LLC $4.75 per SF $31,891.50
Swain Construction, Inc. $6.93 per SF $46,528.02
Mackie Construction,LLC $10.28 per SF $69,019.92
39 1200.040 CONSTRUCT PCC MEDIAN SURFACING(TYPE 47B-3500)
Engineeer's Estimate 711 @ $8.50 per SF $6,043.50
Spencer Management, LLC $7.25 per SF $5,154.75
Swain Construction, Inc. $8.53 per SF $6,064.83
Mackie Construction,LLC $8.92 per SF $6,342.12
Page 7 of 9, 8/19/2015 2:25:41 PM, Bid Tabulation, Generated by:admin for project OPW 52588
Type Line# Item# Description Quantity Price Total
40 1200.050 CONSTRUCT 10-INCH CONCRETE PAVEMENT(TYPE 47B-3500)
Engineeer's Estimate 1063 @ $71.00 per SY $75,473.00
Spencer Management, LLC $55.00 per SY $58,465.00
Swain Construction, Inc. $67.05 per SY $71,274.15
Mackie Construction,LLC
$50.80 per SY $54,000.40
41 1200.060 CONSTRUCT 10-INCH CONCRETE PAVEMENT(TYPE 47B-HE)
Engineeer's Estimate 680 @ $80.00 per SY $54,400.00
Spencer Management, LLC $62.00 per SY $42,160.00
Swain Construction, Inc. $65.40 per SY $44,472.00
Mackie Construction,LLC $85.78 per SY $58,330.40
42 1200.070 CONSTRUCT 9-INCH CONCRETE DRIVEWAY(TYPE 47B-3500)
Engineeer's Estimate 155 @ $80.00 per SY $12,400.00
Spencer Management, LLC $52.00 per SY $8,060.00
Swain Construction, Inc. $67.35 per SY $10,439.25
Mackie Construction,LLC $58.13 per SY $9,010.15
43 1200.080 CONSTRUCT 6-INCH PCC SIDEWALK(TYPE 47B-3500)
Engineeer's Estimate 806 @ $85.00 per SF $68,510.00
Spencer Management, LLC $5.25 per SF
$4,231.50
Swain Construction, Inc. $6.19 per SF $4,989.14
Mackie Construction,LLC $5.67 per SF $4,570.02
44 1200.090 CONSTRUCT 4"AGGREGATE BASE COURSE
Engineeer's Estimate 545 @ $6.00 per SF $3,270.00
Spencer Management, LLC $12.00 per SF $6,540.00
Swain Construction, Inc. $1.51 per SF $822.95
Mackie Construction, LLC $4.00 per SF $2,180.00
45 1200.100 MOBILIZATION
Engineer's Estimate 1 @ $50,000.00 per LS $50,000.00
Spencer Management, LLC $38,000.00 per LS
$38,000.00
Swain Construction, Inc. $47,252.00 per LS $47,252.00
Mackie Construction, LLC $5,399.00 per LS $5,399.00
46 1200.110 RENTAL OF DUMP TRUCK FULLY OPERATED
Engineer's Estimate 20 @ $86.00 per HR $1,720.00
Spencer Management,LLC $85.00 per HR $1,700.00
Swain Construction, Inc. $87.90 per HR $1,758.00
Mackie Construction, LLC $100.00 per HR $2,000.00
47 1200.120 RENTAL OF LOADER FULLY OPERATED
Engineeer's Estimate 20 @ $92.00 per HR $1,840.00
Spencer Management,LLC $75.00 per HR $1,500.00
Swain Construction, Inc. $104.00 per HR $2,080.00
Mackie Construction,LLC $100.00 per HR $2,000.00
48 1200.130 REMOVE TRAFFIC SIGNAL HEAD
Engineeer's Estimate 3 @ $60.00 EACH $180.00
Spencer Management, LLC $80.00 EACH
$240.00
Swain Construction, Inc. $223.00 EACH $669.00
Mackie Construction,LLC $107.00 EACH $321.00
49 1200.140 REMOVE EXISTING PULL BOX
Engineeer's Estimate 3 @ $120.00 EACH $360.00
Spencer Management,LLC $240.00 EACH $720.00
Swain Construction, Inc. $568.00 EACH $1,704.00
Mackie Construction,LLC $319.00 EACH $957.00
Page 8 of 9, 8/19/2015 2:25:41 PM, Bid Tabulation, Generated by:admin for project OPW 52588
Type Line# Item# Description Quantity Price Total
50 1200.150 18"STREET NAME SIGN
Engineeer's Estimate 1 @ $600.00 EACH
$600.00
Spencer Management,LLC $550.00 EACH $550.00
Swain Construction, Inc. $1,131.00 EACH $1,131.00
Mackie Construction,LLC $730.00 EACH $730.00
51 1200.160 PROVIDE AND INSTALL RADAR VEHICLE DETECTION SYSTEM-1 UNITS
Engineeer's Estimate 1 @ $8,500.00 per LS $8,500.00
Spencer Management, LLC $15,253.00 per LS $15,253.00
Swain Construction, Inc. $11,300.00 per LS $11,300.00
Mackie Construction,LLC $14,259.00 per LS $14,259.00
52 1200.170 REMOVE SIGNAL POLE,TYPE CMP 65-12-40
Engineeer's Estimate 1 @ $2,500.00 EACH
$2,500.00
Spencer Management, LLC $4,660.00 EACH
$4,660.00
Swain Construction, Inc. $2,317.00 EACH $2,317.00
Mackie Construction,LLC $3,528.00 EACH $3,528.00
(LINES 1 Through 52 INCLUSIVE)
Bid Tabulation, generated by admin on 8/19/2015 2:25:41 PM for project OPW 52588
CERTIFIED BY: gj.411u"-,� 40.--"-- P® q
DATE: // ®OS
Page 9 of 9, 8/19/2015 2:25:41 PM, Bid Tabulation, Generated by: admin for project OPW 52588
�MAHA,NE.
o�
At9. Public Works '�>epagtaa�neng
e tzw Omaha/Douglas Civic Center
{`� 1819 Farnam Street,Suite 601
Omaha,Nebraska 68183-0601
Aop 4�ry (402)444-5220
4reo FEBR°A Fax (402)444-5248
City of Omaha Robert G. Stubbe, P.E.
Jean Stothert,Mayor Public Works Director
August 26, 2015
Spencer Management
P.O. Box 111623
Omaha,NE 68111
RE: Bids for Project OPW 52588
Dear Bidder:
Section 10-110 of the Omaha Municipal Code allows a Departmental Director to reject bids
because items on the bid received were non-compliant with the specifications. This letter is to
serve as written notice that your bid for Project OPW 52588, being the 204rh Street and
Cumberland Drive, Intersection Improvements project was not compliant with the project
specifications has therefore been rejected.
During the engineering review, it was determined that your firm was not pre-qualified by NDOR
as delineated in SP-7 of the Project Manual.
Section 10-110 of the Omaha Municipal Code provides that: "Within ten (10) days after a bid is
rejected, any rejected bidder may appeal to the city council by filing with the city clerk a written
objection stating all the reasons for the objection."
The Public Works Department appreciates your interest and participation in the bidding process.
Sin ely,
Rob G. Stubbe, P.E.
Public Works Director
cc: Buster Brown,City Clerk
Ryan Wiesen,Law Department
Heather Tippey Pierce,Public Works
Jeffery Babcock,Public Works
File
RGS:htp
C-25A
CITY OF OMAHA
LEGISLATIVE CHAMBER
Omaha,Nebraska
RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA:
WHEREAS, bids were submitted on August 19, 2015 for OPW 52588, being the 204th
Street and Cumberland Drive, Intersection Improvements project; and,
WHEREAS, Swain Construction, Inc. submitted a bid of$362,628.77, being the lowest
and best bid received for OPW 52588.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF OMAHA:
THAT, as recommended by the Mayor, the contract with Swain Construction, Inc. for
OPW 52588, being the 204th Street and Cumberland Drive, Intersection Improvements project, in
the amount of$362,628.77 is hereby approved; and, that the Finance Department is authorized to
pay this cost from the 2010 Transportation Fund 13183, and Transportation Bonds Organization
117117.
1051hra APPROVED AS TO FORM:
19ay70.I/c-
CITY ATTORN DATE
By. ...aV
Councilmember
Adopted SEP 2 ?
Ci Jerk y/ fr
Approve tt,)
Mayor
NO. ! z.
L .�............
Resolution by
Res. that, as recommended by the Mayor, the
contract with Swain Construction, Inc. for
OPW 52588, being the 204th Street and
Cumberland Drive, Intersection
Improvements project, in the amount of
$362,628.77 is hereby approved; and, that the
Finance Department is authorized to pay this
cost from the 2010 Transportation Fund
13183, and Transportation Bonds
Organization 117117.
1051 Ahra
Presented to City Council
SEP 2 2 2015
Adopted 7-0
&tiler grocviz
City Clerk