RES 2015-1616 - Contract with Vierregger Electric Co Inc for OPW 52854, 72nd and Pacific St signal structure o�oiaAHA'ilk NFB� ---\ : ts--" 't Public Works Department
4 ry Omaha/Douglas Civic Center
\d` \..1 1819 ma Parnama/Dou Street,Suite to
December 22 2015 �� ' 1 ' l''!`
01
z qtrigola
.1 �� ^„ � Omaha,Nebraska 68183-0601
c, � .���' (402)444-5220
•PA 4y�' Y ;K I Fax(402)444-5248
o�9rFll t'EgR � ' '' - Robert G. Stubbe,P.E.
City of Omaha , � Public Works Director
Jean Stothert,Mayor
Honorable President
and Members of the City Council,
The attached Resolution approves the contract with Vierregger Electric Co., Inc. for OPW 52854
being the 72nd and Pacific Street Signal Structure project.
The following bid was received on November 18, 2015. A detailed bid tabulation is attached.
Contractor
Total Bid
Vierregger Electric Co., Inc. $167,432.74 (Low Bid)
Commonwealth Electric Company $185,201.76
Sadler Electric, Inc. $227,212.50
Vierregger Electric Co., Inc. has a current Contract Compliance Report Form (CC-1) on file. As
is City policy, the Human Rights and Relations Department will review the contractor to ensure
compliance with the Contract Compliance Ordinance.
The Finance Department is authorized to pay the cost of OPW 52854 from the Street and
Highway Allocation Fund 12131, and Traffic Capital Organization 116189.
d
er
ric
The Public Works Department recommendso the lowest ance of the and best bidlre received, and em quests yourt
Co., Inc. in the amount of$167,432.74, g
consideration and approval of this Resolution.
spectfully submi , Referred to City Council for Consideration:
/!-36y FS 1..,_3- --(Mayor's Office Date 1 z/k� f<
obert G. Stubbe, P.E. Date Y
Public Works Director
Approved as to Fundin : Approved: / 1�)
3 i3r : _ ;� - yet,,,-'Z.
�/ Date
Stephe `;. Curtiss Date Spencer K. Danner, Jr.
Finance Director Human Rights and Relations Director
927bd
Bid Tabulation
Public Works Department
Omaha, Nebraska
Wednesday, November 18, 2015
Project Summary
OPW 52854 English Yes
Metric: No
Description: 72nd Street&Pacific Street Traffic Signal Structure
Start Date: Completion Date:
Labor Release Date:
Field Book Number: Test Core Lengths:
Council Resolution: Adoption Date:
Percent Reserve Due: 10.0%
Percent Complete: 0.0% Percent Time Used: 0.0%
Engineer's Total: $152,200.20
Contract Total $0.00
Total Penalties: $0.00
Total Payments: $0.00
Contractor:
Phone#:
Fax#:
Email address:
Page 1 of 6, 11/18/2015 1:54:23 PM, Bid Tabulation, Generated by: admin for project OPW 52854
Accow,,t/Funding Summery
Fund Org. Description Engineer Contract Penalties Payments
12131 116189 Traffic Engineering-Capital $152,200.20 $0.00 $0.00 $0.00
$152,200.20 $0.00 $0.00 $0.00
Page 2 of 6, 11/18/2015 1:54:23 PM, Bid Tabulation, Generated by: admin for project OPW 52854
Bi.•,' Summary(I iw to high bidder)
Contractor
Engineer's Estimate: $152,200.20
Diff From Low: ($15,232.54)
Bid: $167,432.74
Vierregger Electric Co.,Inc. Diff From Low: $0.00 74
4349 South 139th Street
Omaha NE 68137-
Bid: $185,201.76
Commonwealth Electric Company Diff From Low: 185,20 .76
4225 South 89th Street
Omaha NE 68127-
Bid: $227,212.50
r
Sadler Slectic,Inc. Diff From Low: $59,779.76
5855 So.77th St.
Omaha, NE NE 68127-
Number of Bids: 3
Low Bid: $167,432.74
High Bid: $227,212.50
Average Bid:: $193,282.33
Page 3 of 6, 1 1/1 8/201 5 1:54:23 PM, Bid Tabulation, Generated by: admin for project OPW 52854
tion Quantity Price Total®escri
Type Line# Item# p
1 9000.001 REMOVE SINGLE SPAN SIGNAL STRUCTURE $5 000.00 EACH $5,000.00
Engineer's Estimate 1 @ $16,600.00
Vierregger Electric Co., Inc. $16,600.00 EACH$11,300.00 EACH $11,300.00
Commonwealth Electric Company $1 g,245.00 EACH $18,245.00
Sadler Electric, Inc.
2 9000.002 SINGLE SPAN SIGNAL STRUCTURE,TYPE 226.00 Engineeer's Estimate 1 @ $135,000.00 EACH $135,000.00$130,654.00 EACH $130,654.00
Vierregger Electric Co.,Inc. $163,562.00 EACH $163,562.00
Commonwealth Electric Company $188,000.00 EACH $188,000.00
Sadler Electric, Inc.
3 0805.000 PEDESTAL POLE,TYPE PP-10 Engineeer's Estimate 1 $1,000.00 EACH $1,$1,517.00 EACH $1,517.00000000.00
Vierregger Electric Co.,Inc. EACH $853.00
Commonwealth Electric Company $853.00$1, 53.00 EACH $1, 53.00
Sadler Electric, Inc.
-
4 9000.003 PEDESTAL POLE,TYPE PP-4 $750.00 EACH $ 50.00
$1,350.00 EACH Engineeer's Estimate 1 @ $1,750.00
Vierregger Electric Co., Inc. $682.00 EACH $682.00
Commonwealth Electric Company $982.00 EACH $682.00
Sadler Electric,Inc.
5 0902.001 INSTALL TRAFFIC SIGNAL,TYPE TS-1 w1T31 FACE, BKPLT&MA-5 MTG $2,000.00
10 @ $200.00 EACH
Engineer's Estimate $350.00 EACH $3,500.00
Vierregger Electric Co., Inc. $204.00 EACH $2,040.00
Commonwealth Electric Company $355.00 EACH $3,550.00
Sadler Electric,Inc.
6 0902.006 INSTALL TRAFFIC SIGNAL,TYPE TS-1 L w1T32 FACE, BKPLT&MA-5 MTG $1,600.00
8 @ $200.00 EACH
Engineer's Estimate $430.00 EACH $3,440.00
Vierregger Electric Co., Inc. $204.00 EACH $1,632.00
Commonwealth Electric Company $385.00 EACH $3,080.00
Sadler Electric, Inc:
7 9000.004 INSTALL TR.SIGNAL,TYPE TS-1 RR $250.00 EACH $500.00
Engineeer's Estimate 2 @ $860.00
Vierregger Electric Co., Inc. $430.00 EACH$272.00 EACH $544.00
Commonwealth Electric Company $615.00 EACH $1,230.00
Sadler Electric, Inc.
8 0902.020 INSTALL PEDESTRIAN SIGNAL,TYPE PS-1 WIT-24 FACE&$20 LT MTG
T0 EACH $800.00
Engineeer's Estimate 4 @ $1,080.00
Vierregger Electric Co.,Inc. $270.00 EACH EACH $740.00
Commonwealth Electric Company $185.00$ 5.00 EACH $860.00
Sadler Electric, Inc.
9 0902.030 INSTALL PEDESTRIAN PUSH BUTTON $100.00 EACH $ 00.00
$130.00 EACH
Engineer's Estimate 4 @ $400.00
Vierregger Electric Co.,Inc. EACH $864.00
Commonwealth Electric Company $216.00$2 .00 EACH $864.00
Sadler Electric, Inc.
Page 4 of 6, 11/18/2015 1:54:23 PM, Bid Tabulation, Generated by: admin for project OPW 52854
Type Line# Item# Description Quantity
Price Total
10 9000.005 2"CONDUIT,TRENCHED $7.00 per LF $602.00
Engineeer's Estimate 86 $810.12
Vierregger Electric Co.,Inc. $9.42 per LF$6.53 per LF $561.58
Commonwealth Electric Company $17.00 per LF $1,462.00
Sadler Electric, Inc.
11 9000.006 3"CONDUIT,TRENCHED
$12.63 per LF
Engineeer's Estimate 20 $8.00 per LF $160.00$252. 0
Vierregger Electric Co., Inc. 0
Commonwealth Electric Company $29.00 per LF$7.71 per LF $154.$580.20
Sadler Electric, Inc.
12 0831.007 7/C#14 AWG TRAF.SIGNAL CABLE $3.00 per LF $126.00
Engineeer's Estimate 42 $147.42
Vierregger Electric Co.,Inc. $3.51 per LF$1,99 per LF $83.58
Commonwealth Electric Company $3.00 per LF $126.00
Sadler Electric, Inc.
13 0831.016 16/C#14 AWG TRAF.SIGNAL CABLE $4.00 per LF $160.00
Engineer's Estimate 40 @ $184.00
Vierregger Electric Co., Inc. $4.60 per LF 0
Commonwealth Electric Company $12.00 per LF$4.36 per LF $174.$480.40
Sadler Electric, Inc.
14 0833.003 2/C#16 PPB LEAD-IN CABLE $1.00 per LF $656.00
Engineeer's Estimate 656 @ $787 20
Vierregger Electric Co., Inc. $1.20 per LF$0.98 per LF $642.88
Commonwealth Electric Company $1.25 per LF $820.00
Sadler Electric,Inc.
15 0833.004 GROUNDING CONDUCTOR $46.20
42 a@ $1.10 per LF
Engineer's Estimate $1.20 per LF $50.40
Vierregger Electric Co., Inc. $1.36 per LF $57.12
Commonwealth Electric Company $2.25 per LF $94.50
Sadler Electric, Inc.
16 9000.007 INSTALL LED BLANK OUT"NO RIGHT TURN"SIGN $200.00 EACH $ 00.00
$350.00 EACH
Engineeer's Estimate 2 @ $400.00
Vierregger Electric Co.,Inc. $342.00 EACH $684.00
Commonwealth Electric Company $415.00 EACH $830.00
Sadler Electric,Inc.
17 9000.008 REINSTALL VEHICLE PRIORITY CONTROL SYSTEM(OPTICON)-W!TWO 722 DETECTORS
Engineer's Estimate 1 @ $1,500.00 per LS $1,500.00
$1,380.00 per LS $1,380.00
Vierregger Electric Co.,Inc. $228.00 per LS $228.00
Commonwealth Electric Company $1,760.00 per LS $1,760.00
Sadler Electric,Inc.
18 9000.009 REINSTALL VEHICLE DETECTION SYSTEM $1,500.00
1 @ $1,500.00 per LS Engineer's Estimate $3,600.00 per LS $3,600.00
Vierregger Electric Co., Inc. $399.00 per LS $399.00
Commonwealth Electric Company $3,040.00 per LS $3,040.00
Sadler Electric,Inc.
Page 5 of 6, 11/18/2015 1:54:23 PM, Bid Tabulation, Generated by: admin for project OPW 52854
Type Line#� item#
Description Quantity price Totai
(LINES 1 Through 18 INCLUSIVE)
Bid Tabulation, generated by admin on 11/18/2015 1:54:23 PM for project OPW 52854
CERTIFIED BY: DATE:
Page 6 of 6, 11/18/2015 1:54:23 PM, Bid Tabulation, Generated by: admin for project OPW 52854
C-25A CITY OF OMAHA
LEGISLATIVE CHAMBER
Omaha,Nebraska
RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA:
WHEREAS, bids were submitted on November 18, 2015 for OPW 52854, being the
72nd and Pacific Street Signal Structure project; and,
WHEREAS, Vierregger Electric Co., Inc. submitted a bid of$167,432.74, being the low
bid received for OPW 52854; and,
WHEREAS, the Finance Department is authorized
topay
the
e cost Organization OPW
52854 from
the Street and Highway Allocation Fund 12131, andCapital
189.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF OMAHA:
THAT, as recommended by the Mayor,the contract with Vierregger Electric Co., Inc. for
OPW 52854, being the 72nd and Pacific Street Signal Structure project, in the amount of
$167,432.74 is hereby approved; and, that the Finance ra fic Capitalment is tOrganz ation 1161 g9 to pay this cost
from the Street and Highway Allocation Fund 1213 and, T
926bd APPROVED AS TO FORM:
(7/1
fiL
CITY ATTORNEY DATE
erltl fByCouncilmember
Adopted
0 2..2 2015 f-O
"" •
City Clerky.2. AV A—
Approve�L "' Mayor
/6 sNO
Resolution by
Res. that, as recommended by the Mayor, the
contract with Vierregger Electric Co., Inc. for
OPW 52854, being the 72nd and Pacific Street
Signal Structure project, in the amount of
$167,432.74 is hereby approved; and, that the
Finance Department is authorized to pay this
cost from the Street and Highway Allocation
Fund 12131, and Traffic Capital Organization
116189.
926Abd
Presented to City Council
OEC222015
Adopted _o
u �e� growr2
City Clerk