Loading...
RES 2016-0701 - Contract with Swain Construction Inc for OPW 52650, 180th/192nd and Pacific Sts right turn lanes project 7 Public Works Department A.4141.� � Omaha/Douglas Civic Center �t( May24, 201620916 MM 13 ^F �_,_. ,�� � eFi p .,r �,;, U 4',;7 1819 Farnam Street,Suite 601 .�`t^ Omaha,Nebraska 68183-0601 Aop 4� (402)444-5220 444)FeaR `,; j („ Fax(402)444-5248 City of Omaha " s :t i ,,� � ' Robert G. Stubbe, P.E. Jean Stothert,Mayor Public Works Director Honorable President and Members of the City Council, The attached Resolution approves the contract with Swain Construction, Incorporated for OPW 52650, being the 180th/ 192nd & Pacific Street, Right Turn Lanes project. The following bids were received on March 30, 2016. A detailed bid tabulation is attached. Contractor Total Bid Swain Construction, Incorporated $1,214,917.45 (Sole Bid) Swain Construction, Incorporated has filed the required Contract Compliance Report Form (CC- 1), as determined by the Human Rights and Relations Department. The Finance Department is authorized to pay the cost of OPW 52650 from the 2010 Transportation Bond Fund 13183, Transportation Bonds Organization 117117, year 2016 expenditures. The Public Works Department recommends the acceptance of the bid from Swain Construction, Incorporated in the amount of $1,214,917.45, being the sole bid received, and requests your consideration and approval of this Resolution. Res ectfully submitted Approved: /'—/k Sn i/G Ro ert G. Stubbe, P.E. Date ncer K. Danner r. Date Public Works Director Human Rights and Rel ions Director Approv as t Fundin: Referred to City Council for Consideration: '47 ,2- /, ,try,.., �� "a 5//'z- Stephen . Curtiss Date Mayor's Office Date / Finance Director '1.;" 1348hra Bid Tabulation Public Works Department Omaha, Nebraska Wednesday, March 30, 2016 Project Summary OPW 52650 English Yes Metric: No Description: 180TH/192ND&PACIFIC STREET,RIGHT TURN LANES Start Date: Completion Date: Labor Release Date: Field Book Number: Test Core Lengths: Council Resolution: Adoption Date: Percent Reserve Due: 10.0% Percent Complete: 0.0% Percent Time Used: 0.0% Engineer's Total: $998,235.70 Contract Total $0.00 Total Penalties: $0.00 Total Payments: $0.00 Contractor: Phone#: Fax#: Email address: Page 1 of 10, 3/30/2016 2:31:21 PM, Bid Tabulation, Generated by:admin for project OPW 52650 Account/Funding Summary Fund Org. Description Engineer Contract Penalties Payments 13183 117117 2012 Issue Transportation Bonds $998,235.70 $0.00 $0.00 $0.00 $998,235.70 $0.00 $0.00 $0.00 Page 2 of 10, 3/30/2016 2:31:22 PM, Bid Tabulation, Generated by:admin for project OPW 52650 Bid Summary(low to high bidder) Contractor Engineer's Estimate: $998,235.70 Diff From Low: ($216,681.75) Swain Construction,Inc. Bid: $1,214,917.45 6002 North 89th Circle Diff From Low: $0.00 Omaha NE 68134- Number of Bids: 1 Low Bid: $1,214,917.45 High Bid: $1,214,917.45 Average Bid:: $1,214,917.45 Page 3 of 10, 3/30/2016 2:31:22 PM, Bid Tabulation, Generated by:admin for project OPW 52650 Type Line# Item# Description Quantity Price Total 1 8000.001 MOBILIZATION,PERMITS,BONDS AND INSURANCE Engineeer's Estimate 1 © $60,000.00 per LS $60,000.00 Swain Construction, Inc. $100,000.00 per LS $100,000.00 2 0102.000 CLEARING AND GRUBBING-GENERAL Engineeer's Estimate 1 @ $10,000.00 per LS $10,000.00 Swain Construction, Inc. $154,387.00 per LS $154,387.00 3 0906.200 PROVIDE TEMPORARY TRAFFIC CONTROL Engineeers Estimate 71 @ $350.00 per DAY $24,850.00 Swain Construction, Inc. $246.00 per DAY $17,466.00 4 8000.036 SWPPP NOTIFICATION SIGN Engineeer's Estimate 2 @ $500.00 EACH $1,000.00 Swain Construction, Inc. $242.00 EACH $484.00 5 8000.027 INSTALL TEMPORARY SECURITY FENCE Engineeers Estimate 1 @ $5,000.00 per LS $5,000.00 Swain Construction, Inc. $3,152.00 per LS $3,152.00 6 0101.040 INSTALL CONSTRUCTION ENTRANCE Engineeer's Estimate 8 la $1,000.00 EACH $8,000.00 Swain Construction, Inc. $480.00 EACH $3,840.00 7 0905.050 INSTALL PERMANENT PREFORMED TAPE MARKING-TYPE 3, 5"WHITE Engineeers Estimate 1635 @ $3.00 per LF $4,905.00 Swain Construction, Inc. $2.95 per LF $4,823.25 8 0905.250 INSTALL PERMANENT PREFORMED TAPE MARKING-TYPE 3,5"YELLOW Engineeers Estimate 3094 @ $3.00 per LF $9,282.00 Swain Construction, Inc. $2.95 per LF $9,127.30 9 0105.000 PERFORM COLD PLANING-ASPHALT Engineeers Estimate 2378 @ $6.00 per SY $14,268.00 Swain Construction, Inc. $3.17 per SY $7,538.26 10 0105.010 PERFORM COLD PLANING-CONCRETE Engineeers Estimate 1605 @ $6.00 per SY $9,630.00 Swain Construction, Inc. $4.17 per SY $6,692.85 11 0105.100 REMOVE PAVEMENT Engineeers Estimate 690 @ $22.50 per SY $15,525.00 Swain Construction, Inc. $20.90 per SY $14,421.00 12 0105.110 REMOVE DRIVEWAY Engineeers Estimate 67 @ $20.00 per SY $1,340.00 Swain Construction, Inc. $22.40 per SY $1,500.80 13 0105.140 REMOVE SIDEWALK Engineeers Estimate 6331 @ $2.50 per SF $15,827.50 Swain Construction, Inc. $1.82 per SF $11,522.42 Page 4 of 10, 3/30/2016 2:31:22 PM, Bid Tabulation, Generated by: admin for project OPW 52650 Type Line# Item# Description Quantity Price Total 14 9000.014 REMOVE RIP RAP Engineeer's Estimate 45 @ $10.00 per SF $450.00 Swain Construction,Inc. $5.91 per SF $265.95 15 0201.000 EXCAVATION ON-SITE Engineeer's Estimate 5118 @ $25.00 per CY $127,950.00 Swain Construction, Inc. $21.25 per CY $108,757.50 16 0401.010 CONSTRUCT ASPHALT SURFACE COURSE SPR PG64-34 W/RAP Engineeer's Estimate 441 @ $75.00 per TON $33,075.00 Swain Construction, Inc. $85.65 per TON $37,771.65 17 1002.212 PAVEMENT REPAIR CONCRETE-TYPE L85 8-INCH Engineeer's Estimate 39 @ $75.00 per SY $2,925.00 Swain Construction,Inc. $86.05 per SY $3,355.95 18 0501.002 CONSTRUCT 8-INCH CONCRETE PVEMENT(TYPE L65) Engineeer's Estimate 1605 @ $50.00 per SY $80,250.00 Swain Construction, Inc. $59.05 per SY $94,775.25 19 0501.004 CONSTRUCT 10-INCH CONCRETE PAVEMENT(TYPE L65) Engineeer's Estimate 3581 @ $65.00 per SY $232,765.00 Swain Construction, Inc. $67.35 per SY $241,180.35 20 0501.202 CONSTRUCT 8-INCH CONCRETE DRIVEWAY(TYPE L65) Engineeer's Estimate 89 @ $50.00 per SY $4,450.00 Swain Construction, Inc. $59.20 per SY $5,268.80 21 0501.400 ADJUST UTILITY VALVE TO GRADE Engineeer's Estimate 6 @ $300.00 EACH $1,800.00 Swain Construction, Inc. $206.00 EACH $1,236.00 22 0503.001 CONSTRUCT 6-INCH PCC SIDEWALK Engineeers Estimate 7826 @ $7.00 per SF $54,782.00 Swain Construction,Inc. $5.16 per SF $40,382.16 23 0504.000 CONSTRUCT CURB RAMP Engineeer's Estimate 290 12 $15.00 per SF $4,350.00 Swain Construction, Inc. $15.15 per SF $4,393.50 24 0504.100 CONSTRUCT DETECTABLE WARNING PANEL Engineeer's Estimate 72 @ $33.00 per SF $2,376.00 Swain Construction, Inc. $17.45 per SF $1,256.40 25 0702.760 ADJUST MANHOLE TO GRADE Engineeer's Estimate 7 @ $600.00 EACH $4,200.00 Swain Construction,Inc. $274.00 EACH $1,918.00 26 1103.000 REMOVE AND REINSTALL MAILBOX POST Engineeer's Estimate 1 @ $200.00 EACH $200.00 Swain Construction, Inc. $182.00 EACH $182.00 Page 5 of 10, 3/30/2016 2:31:22 PM, Bid Tabulation, Generated by:admin for project OPW 52650 Type Line# Item# Description Quantity Price Total 27 8000.040 RENTAL OF LOADER,FULLY OPERATED Engineeer's Estimate 24 @ $200.00 per HR $4,800.00 Swain Construction, Inc. $104.00 per HR $2,496.00 28 8000.042 RENTAL OF DUMP TRUCK,FULLY OPERATED Engineeer's Estimate 24 @ $200.00 per HR $4,800.00 Swain Construction, Inc. $87.75 per HR $2,106.00 29 0103.420 REMOVE AND REINSTALL FENCE Engineeer's Estimate 14 @ $75.00 per LF $1,050.00 Swain Construction, Inc. $79.45 per LF $1,112.30 30 0101.000 INSTALL SILT FENCE Engineeer's Estimate 2075 @ $3.00 per LF . $6,225.00 Swain Construction, Inc. $2.86 per LF $5,934.50 31 0101.010 INSTALL AREA INLET PROTECTION Engineeer's Estimate 3 @ $175.00 EACH $525.00 Swain Construction, Inc. $206.00 EACH $618.00 32 8000.024 INSTALL SEEDING-TYPE A Engineeer's Estimate 15411 @ $0.30 per SY $4,623.30 Swain Construction, Inc. $0.33 per SY $5,085.63 33 0803.001 INSTALL ROLLED EROSION CONTROL,TYPE II Engineeer's Estimate 15411 @ $2.00 per SY $30,822.00 Swain Construction, Inc. $1.11 per SY $17,106.21 34 0803.100 INSTALL TURF REINFORCEMENT MAT,TYPE A Engineeer's Estimate 118 la $8.00 per SY $944.00 Swain Construction,Inc. $5.06 per SY $597.08 35 0103.003 REMOVE 21"TO 24"SEWER PIPE Engineeer's Estimate 73 @ $25.00 per LF $1,825.00 Swain Construction, Inc. $28.75 per LF $2,098.75 36 0103.021 REMOVE CULVERT PIPE OVER 18"TO 24" Engineeer's Estimate 30 I@ $30.00 per LF $900.00 Swain Construction, Inc. $28.75 per LF $862.50 37 0103.103 REMOVE AREA INLET Engineeer's Estimate 2 @ $900.00 EACH $1,800.00 Swain Construction, Inc. $622.00 EACH $1,244.00 38 0103.111 REMOVE FLARED END SECTION(24"TO 36") Engineeer's Estimate 5 @ $200.00 EACH $1,000.00 Swain Construction, Inc. $470.00 EACH $2,350.00 39 0701.002 CONSTRUCT AGGREGATE BEDDING FOR 18"STORM SEWER PIPE Engineeer's Estimate 207 @ $10.00 per LF $2,070.00 Swain Construction,Inc. $9.00 per LF $1,863.00 Page 6 of 10, 3/30/20 1 6 2:31:22 PM, Bid Tabulation, Generated by: admin for project OPW 52650 Type Line# Item# Description Quantity Price Total 40 0701.004 CONSTRUCT AGGREGATE BEDDING FOR 24"STORM SEWER PIPE Engineeer's Estimate 91 @ $10.00 per LF $910.00 Swain Construction,Inc. $9.74 per LF $886.34 41 0702.052 CONSTRUCT 18"RCP,CLASS III Engineeer's Estimate 140 @ $65.00 per LF $9,100.00 Swain Construction,Inc. $106.00 per LF $14,840.00 42 0702.054 CONSTRUCT 24"RCP,CLASS III Engineeer's Estimate 91 @ $75.00 per LF $6,825.00 Swain Construction, Inc. $116.00 per LF $10,556.00 43 0702.222 CONSTRUCT 18"CMP Engineeer's Estimate 67 @ $55.00 per LF $3,685.00 Swain Construction,Inc. $79.25 per LF $5,309.75 44 0702.272 CONSTRUCT 24"PIPE CULVERT Engineeer's Estimate 34 @ $75.00 per LF $2,550.00 Swain Construction,Inc. $84.20 per LF $2,862.80 45 0702.288 CONSTRUCT 24"CONCRETE COLLAR Engineeer's Estimate 3 @ $500.00 EACH $1,500.00 Swain Construction, Inc. $312.00 EACH $936.00 46 0702.406 CONSTRUCT 21"RCP BEND Engineeer's Estimate 2 @ $450.00 EACH $900.00 Swain Construction, Inc. $312.00 EACH $624.00 47 0702.407 CONSTRUCT 24"RCP BEND Engineeer's Estimate 2 @ $450.00 EACH $900.00 Swain Construction, Inc. $312.00 EACH $624.00 48 0702.455 CONSTRUCT 18"CMP BEND Engineeer's Estimate 1 @ $750.00 EACH $750.00 Swain Construction, Inc. $625.00 EACH $625.00 49 0702.507 CONSTRUCT 24"STORM SEWER TAP Engineer's Estimate 1 @ $840.00 EACH $840.00 Swain Construction, Inc. $735.00 EACH $735.00 50 0702.572 CONSTRUCT 18"RC FLARED END SECTION w/BAR GRATE Engineeer's Estimate 7 @ $1,000.00 EACH $7,000.00 Swain Construction, Inc. $1,173.00 EACH $8,211.00 51 0702.574 CONSTRUCT 24"RC FLARED END SECTION w/BAR GRATE Engineeer's Estimate 5 @ $1,000.00 EACH $5,000.00 Swain Construction, Inc. $1,470.00 EACH $7,350.00 52 0702.602 CONSTRUCT 18"CMP FLARED END SECTION Engineeer's Estimate 1 @ $750.00 EACH $750.00 Swain Construction, Inc. $301.00 EACH $301.00 Page 7 of 10, 3/30/2016 2:31:22 PM, Bid Tabulation, Generated by: admin for project OPW 52650 Type Line# Item# Description Quantity Price Total 53 0702.707 CONSTRUCT 24"PIPE PLUG Engineeer's Estimate 1 @ $1,000.00 EACH $1,000.00 Swain Construction, Inc. $312.00 EACH $312.00 54 0702.740 CONSTRUCT 54"I.D.STORM MANHOLE Engineeer's Estimate 10 @ $1,250.00 per VF $12,500.00 Swain Construction, Inc. $552.00 per VF $5,520.00 55 0702.780 CONSTRUCT CURB INLET-TYPE I Engineer's Estimate 1 @ $4,000.00 EACH $4,000.00 Swain Construction, Inc. $3,907.00 EACH $3,907.00 56 0702.781 CONSTRUCT CURB INLET-TYPE II Engineer's Estimate 2 @ $4,000.00 EACH $8,000.00 Swain Construction, Inc. $3,907.00 EACH $7,814.00 57 0702.810 CONSTRUCT AREA INLET-TYPE I Engineeer's Estimate 3 @ $4,000.00 EACH $12,000.00 Swain Construction, Inc. $2,651.00 EACH $7,953.00 58 0702.820 INSTALL EXTERNAL FRAME SEAL Engineer's Estimate 6 r $500.00 EACH $3,000.00 Swain Construction, Inc. $406.00 EACH $2,436.00 59 9000.059 TRAFFIC SIGNAL REMOVAL-180TH&PACIFIC Engineeer's Estimate 1 @ $3,000.00 per LS $3,000.00 Swain Construction, Inc. $22,391.00 per LS $22,391.00 60 9000.060 TRAFFIC SIGNAL REMOVAL-192ND&PACIFIC Engineeer's Estimate 1 @ $3,000.00 per LS $3,000.00 Swain Construction,Inc. $22,391.00 per LS $22,391.00 61 0901.070 INSTALL 40'WOOD POLE Engineer's Estimate 6 @ $2,000.00 EACH $12,000.00 Swain Construction, Inc. $3,472.00 EACH $20,832.00 62 9000.062 40'WOOD POLE WITH 12'LUMINAIRE ARM Engineeer's Estimate 2 @ $2,200.00 EACH $4,400.00 Swain Construction, Inc. $3,960.00 EACH $7,920.00 63 9000.063 TRAFFIC SIGNAL,TYPE TS-1 (USE FOR SPAN WIRE SIGNAL) Engineeer's Estimate 13 @ $800.00 EACH $10,400.00 Swain Construction,Inc. $698.00 EACH $9,074.00 64 9000.064 TRAFFIC SIGNAL,TYPE TS-1A(USE FOR SPAN WIRE SIGNAL) Engineeer's Estimate 5 @ $800.00 EACH $4,000.00 Swain Construction, Inc. $673.00 EACH $3,365.00 65 9000.065 TRAFFIC SIGNAL TYPE TS-1LL(USE FOR SPAN WIRE SIGNAL) Engineer's Estimate 3 @ $1,200.00 EACH $3,600.00 Swain Construction, Inc. $1,207.00 EACH $3,621.00 Page 8 of 10, 3/30/2016 2:31:22 PM, Bid Tabulation, Generated by:admin for project OPW 52650 Type Line# Item# Description Quantity Price Total 66 9000.066 TRAFFIC SIGNAL,TYPE TS-1RR(USE FOR SPAN WIRE SIGNAL) Engineeer's Estimate 3 @ $1,200.00 EACH $3,600.00 Swain Construction,Inc. $1,041.00 EACH $3,123.00 67 9000.067 PEDESTRIAN SIGNAL,TYPE PS-1 Engineer's Estimate 8 la $600.00 EACH $4,800.00 Swain Construction, Inc. $587.00 EACH $4,696.00 68 9000.068 PEDESTRIAN PUSH BUTTON Engineeer's Estimate 8 I§ $200.00 EACH $1,600.00 Swain Construction,Inc. $143.00 EACH $1,144.00 69 9000.069 TRAFFIC SIGNAL CONTROLLER,TYPE TC-2070(2 PHASE) Engineer's Estimate 1 @ $10,700.00 EACH $10,700.00 Swain Construction, Inc. $15,570.00 EACH $15,570.00 70 9000.070 TRAFFIC SIGNAL CONTROLLER,TYPE TC-2070(6 PHASE) Engineeer's Estimate 1 @ $11,100.00 EACH $11,100.00 Swain Construction,Inc. $15,570.00 EACH $15,570.00 71 0904.002 INSTALL PULL BOX,TYPE PB-6 Engineer's Estimate 2 @ $650.00 EACH $1,300.00 Swain Construction,Inc. $779.00 EACH $1,558.00 72 9000.072 2"CONDUIT,TRENCHED Engineeer's Estimate 134 @ $7.00 per LF $938.00 Swain Construction, Inc. $7.21 per LF $966.14 73 9000.073 3"CONDUIT,TRENCHED Engineeer's Estimate 180 @ $8.00 per LF $1,440.00 Swain Construction, Inc. $8.50 per LF $1,530.00 74 0904.043 INSTALL 16/C NO. 14 AWG TRAFFIC SIGNAL CABLE Engineeer's Estimate 1206 la $4.00 per LF $4,824.00 Swain Construction, Inc. $4.62 per LF $5,571.72 75 9000.075 SERVICE ENTRANCE CABLE(SEC) Engineeer's Estimate 140 @ $1.50 per LF $210.00 Swain Construction, Inc. $0.89 per LF $124.60 76 0904.080 INSTALL 2/C#16 PEDESTRIAN PUSH BUTTON LEAD-IN CABLE Engineeer's Estimate 908 @ $1.00 per LF $908.00 Swain Construction, Inc. $1.10 per LF $998.80 77 0904.100 INSTALL 3/C#6 STREET LIGHTING CABLE Engineeer's Estimate 321 @ $4.00 per LF $1,284.00 Swain Construction,Inc. $2.52 per LF $808.92 78 0901.080 INSTALL 200W STREET LIGHT LUMINAIRE Engineeer's Estimate 2 @ $800.00 EACH $1,600.00 Swain Construction,Inc. $495.00 EACH $990.00 Page 9 of 10, 3/30/2016 2:31:22 PM, Bid Tabulation, Generated by:admin for project OPW 52650 Type Line# Item# Description Quantity Price Total 79 0833.004 GROUNDING CONDUCTOR Engineeer's Estimate 779 @ $1.10 per LF $856.90 Swain Construction,Inc. $1.38 per LF $1,075.02 80 0901.100 INSTALL TETHER CABLE Engineeer's Estimate 820 @ $3.00 per LF $2,460.00 Swain Construction,Inc. $2.65 per LF $2,173.00 81 0901.090 INSTALL SUPPORT CABLE Engineeer's Estimate 820 fa $6.00 per LF $4,920.00 Swain Construction, Inc. $3.85 per LF $3,157.00 82 0901.060 INSTALL PEDESTAL POLE,TYPE PP-10 Engineeers Estimate 1 @ $500.00 EACH $500.00 Swain Construction,Inc. $879.00 EACH $879.00 83 9000.083 REINSTALL WIRELESS INTERCONNECT RADIO SYSTEM Engineeer's Estimate 1 @ $3,000.00 per LS $3,000.00 Swain Construction,Inc. $569.00 per LS $569.00 84 9000.084 PROVIDE AND INSTALL RADAR VEHICLE DETECTION SYSTEM-180TH&PACIFIC Engineeer's Estimate 1 @ $14,000.00 per LS $14,000.00 Swain Construction,Inc. $30,550.00 per LS $30,550.00 85 9000.085 PROVIDE AND INSTALL RADAR VEHICLE DETECTION SYSTEM-192ND&PACIFIC Engineeer's Estimate 1 @ $14,000.00 per LS $14,000.00 Swain Construction, Inc. $30,550.00 per LS $30,550.00 86 9000.086 INSTALL TEMPORARY TRAFFIC SIGNAL CONTROLLER,TYPE TC-170/336 Engineeer's Estimate 2 @ $1,000.00 EACH $2,000.00 Swain Construction, Inc. $1,372.00 EACH $2,744.00 (LINES 1 Through 86 INCLUSIVE) Bid Tabulation, generate 0/2016 2:31:23 PM for project OPW 52650 CERTIFIED BY: DATE: 3/30/z 0/6 Page 10 of 10, 3/30/2016 2:31:23 PM, Bid Tabulation, Generated by: admin for project OPW 52650 C-25A CITY OF OMAHA LEGISLATIVE CHAMBER Omaha,Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, bids were submitted on March 30, 2016 for OPW 52650, being the 180th/192°d& Pacific Street, Right Turn Lanes project; and, WHEREAS, Swain Construction, Incorporated submitted a bid of $1,244,917.45, being the sole bid received for OPW 52650; and, WHEREAS, the Finance Department is authorized to pay the cost of OPW 52650 from the 2010 Transportation Bond Fund 13183, Transportation Bonds Organization 117117, year 2016 expenditures. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, the contract with Swain Construction, Incorporated for OPW 52650, being the 180th/192nd & Pacific Street, Right Turn Lanes project, is hereby approved. BE IT FURTHER RESOLVED: THAT, the Finance Department is authorized to pay the cost of$1,214,917.45 for OPW 52650 from the 2010 Transportation Bond Fund 13183, Transportation Bonds Organization 117117, year 2016 expenditures. 1347hra APPROVED AS TO FORM: 72( CITY ATTORNEY DATE By &...J.. J .. ouncilmember Adopted MAY 2 4 MI6 7- o City Clem _�JL GS..?!/ /0 Approve Ld, -� N.... / Mayor 17/4.'i NO. ; /%' Resolution by Res. that, as recommended by the Mayor, the contract with Swain Construction, Incorporated for OPW 52650, being the 180th1192"`� & Pacific Street, Right Turn Lanes project, is hereby approved; and that, the Finance Department is authorized to pay the cost of $1,214,917.45 for OPW 52650 from the 2010 Transportation Bond Fund 13183, Transportation Bonds Organization 117117, year 2016 expenditures. 1347Bhra Presented to City Council MAY 2 4 2g16 Adopted '_ -, Ali lergm u/n City Clerk