Loading...
RES 2016-1013 - Agmt with NDOR for improvements on Veterans Memorial bridge ,0 pHA.NFB Public Works Department I`V� fir=?�� Omaha/llou*las Civic Center p F , July 19, 2016 i 1819 I�arnam street,suite 601 Dp �► '-"°ti b t� 1 {' 2Omaha,Nebraska 68183-0601 o a 402)444-5220 +4T4'D PE911°' Fax (402)444-5248 City of Omaha T ( K Robert G. Stubbe,P.E. Jean Stothert,Mayor + )I' �',a K Pu blic ublie Works Director Honorable President and Members of the City Council, Transmitted herewith is a Resolution approving a Program Agreement between the City of Omaha and the Nebraska Department of Roads (NDOR) for the South Omaha Veterans Memorial Bridge project, which includes sidewalk repair. This project is identified as STR 275-7(1045), State Control No. 22631, and is programmed to include repairing, painting, and applying epoxy polymer overlay to Structure S275 19041 over the Burlington Northern Santa Fe Railroad, Gibson Road, South 10th Street, and the Missouri River. This project is being undertaken with the NDOR acting as the lead agency, with cost-shares based on the portion of the project lying within the City's jurisdiction. The City's cost share is currently estimated at $122,613.13, which will be paid from the Nebraska Department of Roads Grant Fund 17116, Capital Grants Transportation Organization 132044. The Public Works Department requests your consideration and approval of the attached Resolution and Program Agreement. Respectfully submitted, Referred to City Council for Consideration: D� . dt�..✓� L g-f ,(a. ) b(1tk -77 7,, bert G. Stubbe, P.E. Date Mayor's Office Date Public Works Director Approved as to Funding: �--- 7 ` r� Stephen . Curtiss Date Finance Director IV 1986tns DOR'° DepartNmeebraskant of Roads AGREEMENT NO. XL 1613 MUNICIPALITY PROGRAM AGREEMENT STATE PROJECTS PROJECT NO. STR-275-7(1045) CONTROL NO. 22631 CITY OF OMAHA STATE OF NEBRASKA, DEPARTMENT OF ROADS IMPROVING THE SOUTH OMAHA VETERANS MEMORIAL BRIDGE THIS AGREEMENT is between City of Omaha, a municipal corporation of the State of Nebraska ("Municipality"), and State of Nebraska, Department of Roads ("State"), collectively referred to as the "Parties". WITNESSETH: WHEREAS, State intends to improve a portion of South Omaha Veterans Memorial Bridge on US-275 at the location as shown on Exhibit"A"; and WHEREAS, State intends that the improvement be developed and constructed under the designation of Project No. STR-275-7(1045); and WHEREAS, the improvement is located within the designated urban area of Omaha, Nebraska, and funds administered by State have been made available for the construction of improvements such as this; and WHEREAS, this improvement is located on a portion of State Highway US-275 within Municipality's corporate limits; and WHEREAS, Parties intend that this Agreement describe certain roles and responsibilities applicable to this project; and WHEREAS, Federal Regulations provide that Municipality shall not profit or otherwise gain from local property assessments that exceed Municipality's share of project costs; and WHEREAS, City Council has authorized the Mayor to sign this Agreement, as evidenced by the Resolution of City Council, as shown on Exhibit "B"; and WHEREAS, the project work within the corporate limits is described below in Section 2. Project No. STR-275-7(1045) Page 1 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Template T-AGR-20 Revised 10-27-2015 NOW THEREFORE, in consideration of these facts and the mutual promises of the Parties hereto, the Parties agree as follows: SECTION 1. DURATION OF THE AGREEMENT 1.1 Effective Date-This Agreement is effective immediately on the date it is fully executed by the Parties. The Mayor is authorized by the City Council to execute this Agreement, as evidenced by the Resolution of City Council, attached as Exhibit "B" and incorporated herein by this reference 1.2 Renewal, Extension or Amendment-This Agreement may be renewed, extended or amended by mutual agreement or as otherwise provided herein. 1.3 Identifying Date- For convenience, this Agreement's identifying date will be the date the State signed the Agreement. 1.4 Duration- This Agreement will remain in full force and effect for future responsibilities of Municipality described herein, such as for parking, encroachments and maintenance, unless such responsibilities have been rescinded by State. State will treat the remainder of this Agreement as inactive upon the happening of either(1) the waiver of an audit review, or (2) the final completion of an audit review by the State or its authorized representative and the resolution of all issues identified in the audit report. 1.5 Termination - Further, State reserves the right to terminate the Agreement as provided herein. SECTION 2. DESCRIPTION OF THE WORK WITHIN THE CORPORATE LIMITS The Parties agree State will develop plans and specifications and cause the project to be constructed at the location shown on Exhibit "A", attached and incorporated herein by this reference, and in accordance with plans and specifications and the provisions of this Agreement. Generally the improvements to be constructed with this project include the following: This project within the corporate limits will consist of repairing, painting, and applying epoxy polymer overlay on Structure S275 19041 over the Burlington Northern/Sante Fee Railroad, Gibson Road, South 10th Street and the Missouri River. The Municipality will be responsible for 100% of the sidewalk repair and epoxy polymer overlay for the width of the sidewalk on the Nebraska side of the structure, this work is hereinafter referred to as sidewalk repair. Project No. STR-275-7(1045) Page 2 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Agreement No. XL1613 SECTION 3. STATE RESPONSIBILITIES State shall: 3.1 Prepare at its sole discretion, plans and specifications for State's proposed subject project. State will deliver these plans and specifications to Municipality prior to construction. State has sole authority to modify the plans or specifications as necessary to complete the proposed improvements. 3.2 Acquire all property rights for Right of Way (ROW)for the project that will not be acquired by Municipality. 3.3 Advertise and conduct a letting and receive bids on the proposed improvement. State has the sole authority to determine, and award the contract to, the lowest responsible bidder. State shall sign the construction contract. 3.4 Supervise and cause completion of the construction of the improvement as shown in the construction contract documents and modifications thereto. State has sole authority to execute any contractor change orders-supplemental agreements required for construction of the project within Municipality's corporate limit. State will notify the Municipality of any contractor change orders-supplemental agreements that increase Municipality's cost. 3.5 Reimburse, when applicable, Municipality for the nonbetterment relocation of municipally owned utility facilities as provided in SECTION 10. UTILITIES. SECTION 4. MUNICIPALITY RESPONSIBILITIES. Municipality shall, with respect to the portion of the project within its corporate limits, and at no cost to State: 4.1 Regulate, to the extent Municipality has authority to do so, all future development and use of property adjoining the public ROW as described in SECTION 6. MUNICIPALITY'S DUTIES AND RIGHTS REGARDING RIGHT OF WAY. 4.2 Require that all future entrances from private property to the highway ROW within the limits of this project receive approval of the Director-State Engineer, Department of Roads or authorized representative, pursuant to Neb. Rev. Stat. § 39-1332 prior to Municipality approval or Municipality issuing a building permit for the site. Project No. STR-275-7(1045) Page 3 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Agreement No. XL1613 4.3 Cause the removal of all advertising signs from the existing highway ROW. Municipality also agrees to cause the removal from the existing highway ROW of other privately owned encroachments, facilities, objects, structures, or things, and to keep the existing and new highway ROW free of future encroachments, facilities, objects, structures, or things, except those authorized by permit from Municipality and approved by State and Federal Highway Administration. 4.4 Cause the removal, alteration, or relocation of pipe lines, poles or other underground or overhead services not owned by Municipality and located within the corporate limits as necessary for the construction of the project. 4.5 Comply with, for project work performed by Municipality, the provisions of the Nebraska Fair Employment Practices Act, Neb. Rev. Stat. §§ 48-1101 - 48-1126, and all regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation, Title 49 CFR, Parts 21 and 27, as set forth in the SECTION 17. TITLE VI NONDISCRIMINATION CLAUSES. 4.6 Perform the present and future duties assigned to Municipality under this Agreement at its sole cost except when costs are specifically reimbursable under this Agreement. 4.7 Obtain approval of State, with Federal Highway Administration concurrence, prior to making or causing changes in the roadway geometrics, either during project construction or after the project is completed. Changes that require prior approval include but are not limited to: access control, driveways, median breaks, parking restrictions or any other traffic control items. 4.8 Amend ordinances, as necessary, to establish pavement or ground elevations shown in the plans when proposed construction involves a change in elevations established by a pre-existing ordinance. 4.9 If the Municipality procures consultant services for preliminary engineering and construction engineering for nonbetterment rehabilitation of municipally owned and operated utilities by the Municipality, the Municipality agrees to comply with Chapter 4 of the "Nebraska Department of Roads' LPA Guidelines Manual for Federal-Aid Projects " SECTION 5. CONSTRUCTION SCHEDULE State will determine the construction schedule for this project. Project No. STR-275-7(1045) Page 4 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Agreement No. XL1613 SECTION 6. MUNICIPALITY'S DUTIES AND RIGHTS REGARDING RIGHT OF WAY 6.1 Encroachments: Municipality and State will cooperate to cause the removal from public ROW, or correction or alteration in the public ROW, as necessary for the construction of the aforesaid project, all pipe lines, poles or other underground or overhead services not owned by Municipality and located within the corporate limits. 6.2 Adjacent Development: Municipality understands that State highway ROW shall be held inviolate for State highway purposes pursuant to Neb. Rev. Stat. § 39-1359, and no physical or functional encroachments, structures, or uses shall be permitted within such right-of-way limits, except by written consent of State. Municipality will regulate, to the fullest extent allowed by law, the private or non-transportation related public development of property adjoining the public ROW, to prevent future encroachment or uses of the public ROW, except by written consent of State. Municipality shall not issue a building permit for an adjacent property which requires or indicates in the building plans, work on the state highway right of way prior to obtaining State's written approval of the plan. 6.3 Special Assessments: Municipality shall not use special assessments to defray Municipality's costs under this Agreement unless Municipality has received, in advance, written consent from State's Right of Way Division Manager. SECTION 7. ROADWAY LIGHTING SYSTEM THIS SECTION HAS INTENTIONALLY BEEN LEFT BLANK SECTION 8. TRAFFIC SIGNAL EQUIPMENT THIS SECTION HAS INTENTIONALLY BEEN LEFT BLANK SECTION 9. PERMISSION TO USE STATE RIGHT OF WAY THIS SECTION HAS INTENTIONALLY BEEN LEFT BLANK Project No. STR-275-7(1045) Page 5 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Agreement No. XL1613 SECTION 10. UTILITY RELOCATION WORK 10.1 Overview The Parties understand that existing Municipality and non-Municipality owned utility facilities may conflict with State's project. State will enter into a separate agreement(s) to establish the roles, duties, and financial responsibilities for the necessary relocation of utility facilities. 10.2 State Highway Right-of-Way Municipality shall obtain a permit from the State for utility relocation work that occupies State Highway ROW. SECTION 11. MUNICIPALITY'S FINANCIAL RESPONSIBILITIES Municipality's cost of this project will be the sum of the following: • 100% of the sidewalk repair cost on the Nebraska side of the structure State's preliminary estimate of Municipality's cost is $122,613.13, but Municipality's actual cost is likely to be greater than the preliminary estimate as the details of design are further developed. Municipality shall bear its own costs performing its duties under this Agreement. 11.1 THIS SECTION HAS INTENTIONALLY BEEN LEFT BLANK 11.2 Cost of the project within the corporate limits: Municipality will pay 100% of the costs of sidewalk repair located on the Nebraska side within Municipality's corporate limits which includes: preliminary engineering, construction, construction engineering and the non-betterment utilities relocation. The total cost of sidewalk repair located on the Nebraska side is currently estimated to be $122,613.13. 11.3 Calculation of municipality costs: State shall calculate Municipality's project cost as follows: 11.3.1 Preliminary Engineering. Divide the Municipality's construction cost, as calculated in 11.2, by the project's total construction cost and multiply the result by project's total preliminary engineering cost. The total estimate preliminary engineering cost is $3,963.13. Project No. STR-275-7(1045) Page 6 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Agreement No. XL1613 11.3.2 Municipality's Construction Cost. Multiply the Municipality's share of 100% by the actual cost of construction of the sidewalk repair. The actual cost of the sidewalk repair work within the corporate limits is calculated by multiplying unit prices by final quantities for work within the corporate limits. Unit prices and final quantities may be different than bid prices and estimated quantities as a result of field measurement and the contractor change order-supplemental agreement process. The total estimated construction cost is $113,000.00. 11.3.3 Construction Engineering. Divide the Municipality's construction cost, as calculated in 11.2, by the project's total construction cost and multiply the result by project's total construction engineering cost. The total estimated cost for construction engineering is $5,650.00. 11.3.4 Acquisition of Property Rights. THIS SECTION HAS INTENTIONALLY BEEN LEFT BLANK 11.3.5 Utilities. THIS SECTION HAS INTENTIONALLY BEEN LEFT BLANK 11.4 Payment by Municipality: At times determined by the State, and after execution of this Agreement, the State will invoice the Municipality for some or all of Municipality's cost share of the State-incurred preliminary engineering project costs. Upon award of the construction contract, the State will invoice the Municipality for Municipality's cost share of construction, construction engineering and any unbilled preliminary engineering expenses. The Municipality shall pay the State within 30 calendar days of receipt of invoice from the State. The final settlement between the State and the Municipality will be made following final audits and when the final costs have been determined by the State. SECTION 12. TRAFFIC CONTROL 12.1 All traffic control devices will conform to the latest approved edition of the Manual on Uniform Traffic Control Devices and Nebraska Supplements thereto. 12.2 If Municipality is to perform or contract for any work on the state highway within the project limits, Municipality will develop a traffic control plan related to that work. The plan will be provided to State's Project Manager for approval and acceptance. Municipality will provide, operate and maintain Municipality's traffic control devices in accordance with its approved traffic control plan. Project No. STR-275-7(1045) Page 7 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Agreement No. XL1613 12.3 Municipality's work must comply with all traffic safety regulations, including those prescribed in the latest approved edition of the Manual of Uniform Traffic Control Devices and the Nebraska Supplement thereto. Municipality shall use caution when working in State ROW. 12.4 Traffic control plans will require the sidewalk on the north side of the bridge to be closed during a portion of construction. SECTION 13. PLANS AND SPECIFICATIONS The plans and specifications for this project will be on file in the Lincoln central headquarters office of the Nebraska Department of Roads. SECTION 14. TERMINATION State has the sole discretion to suspend the work in part or in whole or to terminate this Agreement; such action on its part will in no event be deemed a breach of this Agreement by State. State will provide written notification to Municipality of such suspension or termination. Upon receipt of such notice, Municipality will document in writing and submit to State the costs Municipality has incurred completing work under this Agreement prior to receipt of the notification from State. State in its sole discretion shall determine which of the costs submitted by Municipality are reimbursable by State. State shall notify Municipality in writing of such determination. Upon receipt of determination, Municipality will submit an invoice to State for the amount determined to be reimbursable. SECTION 15. FAIR EMPLOYMENT PRACTICES ACT Municipality agrees to abide by the Nebraska Fair Employment Practices Act, as provided by Neb.Rev.Stat. 48-1101 through 48-1126. SECTION 16. DISADVANTAGED BUSINESS ENTERPRISES 16.1 Policy: Municipality and State further agree to ensure that disadvantaged business enterprises as defined in 49 CFR Part 26 shall have the maximum opportunity to participate in the performance of contracts financed in whole or in part with Federal funds under this Agreement. Project No. STR-275-7(1045) Page 8 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Agreement No. XL1613 16.2 Disadvantaged Business Enterprises Obligation: Municipality and State further agree to ensure that disadvantaged business enterprises as defined in 49 CFR Part 26 have the maximum opportunity to participate in the performance of contracts and subcontracts financed in whole or in part with Federal funds provided under this Agreement. In this regard, Municipality shall take all necessary and reasonable steps in accordance with 49 CFR Part 26 to ensure that disadvantaged business enterprises have the maximum opportunity to compete for and perform contracts. Municipality shall not discriminate on the basis of race, color, sex, age, disability, or national origin in the award and performance of FHWA assisted contracts. Municipality acting as a sub-recipient of Federal-aid funds on this project agrees to adopt the Nebraska Disadvantaged Business Enterprise Unified Certification Program for the Federal-aid contracts Municipality executes on this project. Failure of Municipality to carry out the requirements set forth above on any work performed by Municipality shall constitute breach of contract and, after the notification of the FHWA, may result in termination of the Agreement or contract by State or such remedy as State deems appropriate. SECTION 17. TITLE VI NONDISCRIMINATION CLAUSES During the performance of this Agreement, the Municipality, for itself, its assignees and successors in interest agrees as follows: 17.1 Compliance with Regulations: The Municipality shall comply with the Regulations of the Department of Transportation relative to nondiscrimination in federally assisted programs of the Department of Transportation (Title 49, Code of Federal Regulations, Parts 21 and 27, hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this Agreement. 17.2 Nondiscrimination: The Municipality, with regard to the work performed by it after award and prior to completion of the contract work, shall not discriminate on the basis of race, color, sex, age, religion, disability or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The Project No. STR-275-7(1045) Page 9 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Agreement No. XL1613 Municipality shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix "A," "B," and "C" of Part 21 of the Regulations. 17.3 Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by the Municipality for work to be performed under a subcontract, including procurements of materials or equipment, each potential subcontractor or supplier shall be notified by the Municipality of the Municipality's obligations under this Agreement and the Regulations relative to nondiscrimination on the basis of race, color, sex, age, religion, disability or national origin. 17.4 Information and Reports: The Municipality shall provide all information and reports required by the Regulations, or orders and instructions issued pursuant thereto, and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by State or the FHWA to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information, the Municipality shall so certify to State, or the FHWA as appropriate, and shall set forth what efforts it has made to obtain the information. 17.5 Sanctions for Noncompliance: In the event of the Municipality's noncompliance with the nondiscrimination provisions of this Agreement, State will impose such contract sanctions as it or the FHWA may determine to be appropriate, including but not limited to: (a) Withholding of payments to the Municipality under this Agreement until the Municipality complies, and/or (b) Cancellation, termination or suspension of this Agreement, in whole or in part. 17.6 Incorporation of Provisions: The Municipality shall include the provisions of paragraphs (1) through (6) in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations, order, or instructions issued pursuant thereto. The Municipality shall take such action with respect to any subcontract or procurement as State or the FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance: Provided, however, that, in the Project No. STR-275-7(1045) Page 10 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Agreement No. XL1613 SOUTH OMAHA VETERANS MEMORIAL BRIDGE 275- 7(1045 ) C.N. 22631 DOUGLAS COUNTY AND POTTAWATTAMIE COUNTY, IOWA R 13 E 9, � y�c� �a :y':r � � GSt � GAP • .,.� Z H St ) v ;" III y !St !St :,=., y t k I F JSt JSt 4 ti .� y ' �l Y/eaourl Ave .II ' 6t ai to Z. � '. ,,. atig y y y M St y 92 N Ave 3101 : � t'l NSt 4 _--C") hAve +, osr g e y aSt Co 3 1 2'� 1 Iowa z k 10 I 1 1: y `, in .- S St 1- \ , y u st y *` R.P. 190+41 HWY. US-275 w w st i i-, PROJECT SITE � X )) • • h EXHIBIT "A" ,. event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the Municipality may request State to enter into such litigation to protect the interests of State, and in addition, the Municipality may request the United States to enter into such litigation to protect the interests of the United States. SECTION 18. ENTIRE AGREEMENT This instrument, and any supplements hereto, embodies the entire agreement of the Parties; however, provisions of prior agreement(s) between the Parties concerning the applicable segment of State Highway US-275 shall remain in effect except to the extent the provisions of the prior agreement(s) conflict with this Agreement. IN WITNESS WHEREOF, the Parties hereby execute this Agreement pursuant to lawful authority as of the date signed by each party. EXECUTED by Municipality this,,2,sa y of , 2016. WITNESS: CITY OF MAHA ity Clerk Mayor EXECUTED by State this day of , 2016. STATE OF NEBRASKA DEPARTMENT OF ROADS Michael H. Owen, P.E. Roadway Design Engineer RECOMMENDED: pp - 3 , tt+ 1a teti9 Timothy W. Weander, P.E. Di trict 2 E ineer Project No. STR-275-7(1045) Page 11 of 11 Control No. 22631 Improving South Omaha Veterans Memorial Bridge Agreement No. XL1613 C-25A CITY OF OMAHA LEGISLATIVE CHAMBER Omaha,Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, the City desires to partner with the Nebraska Department of Roads (IDOR) for the South Omaha Veterans Memorial Bridge project, being the improvements'to a portion of the South Omaha Veterans Memorial Bridge located on State Highway US-275, known as STR- 275-7(1045), State Control No. 22631; and, WHEREAS the attached Agreement, which by this reference becomes a part hereof, delineates the responsibilities of each party in regards to these improvements, which consists of repairing, painting, and applying epoxy polymer overlay to Structure S275 19041 over the Burlington Northern Santa Fe Railroad, Gibson Road, South 10th Street, and the Missouri River; and, WHEREAS, the City's local funding cost share for this project, based on the portion of this project located within the City's jurisdiction, is currently estimated to be $122,613.13, which will be paid from the Nebraska Department of Roads Grant Fund 17116, Capital Grants Transportation Organization 132044. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, the Program Agreement between the City of Omaha and the Nebraska Department of Roads for Project STR-275-7(1045), State Control No. 22631, being the improvements to a portion of the South Omaha Veterans Memorial Bridge located on State Highway US-275, which consists of repairing, painting, and applying epoxy polymer overlay to Structure S275 19041 over the Burlington Northern Santa Fe Railroad, Gibson Road, South 10th Street, and the Missouri River, with the City's share of the project cost, estimated to be $122,613.13, to be paid from the Nebraska Department of Roads Grant Fund 17116, Capital Grants Transportation Organization 132044, is hereby approved. BE IT FURTHER RESOLVED: THAT, the City Council hereby authorizes the Mayor and City Clerk to sign the attached Agreement on behalf of the City of Omaha. 1985tns APPROVED AS FORM: 7/17/44 CITY TTORN DATE By DQ t, .47- Councilmember Adopted.. L 1 9.2016 City Clerk 77�//�a/� Approve \.14t . 47tAL Mayor NO. Resolution by Res. that, as recommended by the Mayor, the Program Agreement between the City of Omaha and the Nebraska Department of Roads for Project STR 275-7(1045), State Control No. 22631, being the improvements to a portion of the South Omaha Veterans ti Memorial Bridge located on State Highway US-275, which consists of repairing, painting, and applying epoxy polymer overlay to Structure S275 19041 over the Burlington Northern Santa Fe Railroad, Gibson Road, South 10th Street. and the Missouri River, with the City's share of the project cost, estimated to be $122,613.1 3, to be paid from the Nebraska Department of Roads Grant Fund 17116, Capital Grants Transportation Organization 132044, is hereby approved; and that the City Council hereby authorizes the Mayor and City Clerk to sign the attached Agreement on behalf of the City of Omaha. l985Ain, Presented to City Council JUL...1..9.2016 Adopted - - U�u6ter^ grown City Clerk