Loading...
RES 2016-1163 - Agmt with DCM Smith Inc for OPW 52472 (CSO), Burt Izard lift station improvements v��° 1/ R° - Public Works Department ET !►ses �, r� �i2,` Omaha/Douglas Civic Center 0116l� t�� h1819 t'arnam Street Suite 601 r: m August 23, 2016 f Omaha,Nebraska 68183-0601 00 4 •Ul (402)444-5220 ep�o FE9RL Pax(402)444-5248 City of Omaha Robert G. Stubbe,P.E. Jean Stothert,Mayor Public Works Director Honorable President and Members of the City Council, Transmitted herewith is a Resolution approving Amendment No. 2 to a Professional Services Agreement with CDM Smith, Inc. to perform professional engineering services for the Burt Izard Lift Station Improvements, known as OPW 52472 (CSO) was approved by City Council Resolution No. 994 on August 12, 2014. The attached Amendment 2 to the Agreement authorizes CDM Smith, Inc. to conduct final design and bidding assistance services. The exact scope of services is included in the attached Amendment. CDM Smith, Inc. has agreed to perform the services detailed in Amendment 2 of the attached agreement for a fee not to exceed $505,190.00 to be paid from Sewer Revenue Improvements Fund 21124, CSO Control Implementation Organization 116918; Sewer Revenue Bonds will be issued to finance this project. CDM Smith, Inc. has filed the required Contract Compliance Report Form (CC-1), as determined by the Human Rights and Relations Department. As is City policy, the Human Rights and Relations Department will review the contractor to ensure compliance with the Contract Compliance Ordinance. The Public Works Department requests your consideration and approval of the attached Resolution and Change Order. Res ectfully submitted, Approved: ert G. Stubbe, P.E. Date Spe cer K. Danner, Jr. Date Public Works Director Human Rights and Rela sons Director Approved as to Funding: Referred to City Council for Consideration: tep en B. Curtiss Date Mayor's Office Date Finance Director 5a 1122tns AMENDMENT NO. 2 TO THE AGREEMENT FOR ENGINEERING SERVICES FOR OPW 52472—BURT IZARD LIFT STATION IMPROVEMENTS (CSO) The Professional Services Agreement between the City of Omaha, Nebraska (OWNER) and CDM Smith Inc. (ENGINEER) dated August 12, 2014 for professional services to provide study and preliminary engineering phase services, is hereby amended as follows: ENGINEER is obligated to comply with the Utilization of Small and Emerging Small Businesses as provided in Exhibit A. A detailed description of the scope of work and services to be performed is listed in Exhibit B. In summary, this Amendment No. 2 only incorporates changes to the scope of work outlined in Amendment No. 1 for OPW 52472 — Burt Izard Lift Station Improvements (CSO); all of the original scope of work outlined in Amendment No. 1 remains in effect. The estimated man-hours for this additional work are shown in Exhibit C. The maximum amount for the services covered by this amendment shall not exceed five hundred five thousand one hundred ninety dollars ($505,190) without prior written authorization by the City of Omaha. This amendment does not change any of the provisions of the original contract. In accordance with the provisions of the August 12, 2014 Agreement; This Amendment is executed by ENGINEER this it—C6' day of�UU1 , 2016. CDM SAI I TN .ma c ENGINEER Adj _ By7----irt-A---- ATTEST CLr F,vn S ,i/e-E L€AMc2 (Title) This Amendment is executed by OWNER this.25-7ay of ay_ _ 2016. ATTEST CITY OF OMAHA, A Municipal Corporation oitL/t3° kriAL City Clerk Mayor APPROVED AS TO FORM: /./er../ey! Deputy City Attorney EXHIBIT "B" SCOPE OF SERVICES AMENDMENT NO. 2 OPW 52472 (CSO) This AMENDMENT provides for engineering services for final design and bidding services of improvements to the Burt Izard Lift Station Improvements Project.The engineering Final Design will expand upon the preliminary design completed in 2015. This Amendment No. 2 incorporates changes to the scope of work outlined in Amendment No. 1 for OPW 52472— Burt Izard Lift Station Improvements (CSO) and all of the original scope of work outlined in Amendment No. 1 remains in effect.The major improvements include: • Upgrades to the electrical components in the Grit Basin Room including lighting, receptacles, motors, and panels to meet Class 1 Division 1 per NFPA 820. Physical separation of the Grit Basin Room and Storage Room to allow the Storage Room to be meet Class 1 Division 2 per NFPA 820 • New hydraulic lids for Grit Basin No. 1. • Replacement of the crane and clamshell in the Grit Building to meet Class 1 Division 1 and provide for improved operations. • Addition of a second mechanically cleaned bar screen in the Bar Screen Room. • Replacement of the screenings handling in the Bar Screen Room to include new screening conveyance to drop screenings from two bar screens to one lugger. • Replacement of the pumps, motors, drives, piping, and valves in the lift station. Final design shall mean the development of the project for bidding including plans, specifications, permits, contract documents and a Final Design Report. Bid Phase Services shall mean assistance during the bidding phase including attendance at the pre-bid meeting, plan and specification clarifications, preparation of addenda, and bid evaluation assistance. ARTICLE 1.SCOPE OF SERVICES This AGREEMENT provides for engineering services for final design and bidding services to update the Burt Izard Lift Station including replacing equipment, updating the facility per current code requirements, and providing improvements for grit removal. The PROJECT work will be performed as part of the overall Omaha CSO/RNC Control Program. ENGINEER will be required to comply with the written Plans, Protocols, Procedures, Standards, and Guidance documents developed for the CSO Program. This scope of services is organized in categories of project assumptions, project management, and major project design tasks. Major elements of work will include: • Task 1 -Project Management • Task 2 -60% Design • Task 3—90% Design • Task 4—95% Design • Task 5—Final (100%) Design Demolition and Asbestos Remediation Permitting 10/10/2011 Process Notes: 1. Any documents listed above may be updated during the duration of the project. In the event that a change is made to a document that affects the scope of work included herein, a contract change may be required. 2. City of Omaha Standard Specifications and Plates shall be used, where applicable, unless special conditions require modification. Modifications are to be approved by the CITY. TASK 1—PROJECT MANAGEMENT Objective: Provide for the overall project management and administration, project coordination,throughout the duration of the PROJECT. Deliverables: Updated Quality Control Plan; Updated Project Health and Safety Plan; Updated Project Execution Plan; monthly invoices; monthly progress reports; monthly schedule updates; progress meeting and other meeting minutes. Scope: 1.1. Project Management and Administration. ENGINEER to provide project management and administrative activities in addition to the scope of work in Amendment No. 1 including: 1.1.1. Project Management and Administration.ENGINEER will provide project management and administrative services for an additional 2 months. 1.1.2. Updated Quality Control Plan (QCP). No changes to scope from Amendment No. 1. 1.1.3. Updated Project HSP. No changes to scope from Amendment No. 1. 1.1.4. Updated Project Execution Plan (PEP). ENGINEER will update the PEP that was created for Amendment No. 1 to include the additional scope. 1.1.5. Initial Project Kickoff Meeting. No changes to scope from Amendment No. 1. 1.1.6. Monthly PMT Meeting. ENGINEER will conduct two additional monthly progress meetings with the PMT. 1.2. Agency and Project Coordination. ENGINEER will provide agency and project coordination activities including: 1.2.1. Utility Coordination. No changes to scope from Amendment No. 1. 1.2.2. Agency Coordination and Permitting. No changes to scope from Amendment No. 1. 1.2.3. CITY Agency Coordination. ENGINEER will meet with CITY agencies to discuss code requirements for the Grit Building. TASK 2—60% Design Objective: Develop 60%deliverables for review and utility coordination.The purpose of the 60%design submittal is to provide the CITY and PMT the opportunity to review the plans, specifications, and appurtenant material so that the ENGINEER can proceed in completing the plans, adding all necessary details, notes, etc. Deliverables: 60% plans, 60%specifications, updated Basis of Design Report, Updated Cost Estimate, Construction Schedule, Updated Environmental and Construction Permit List and Draft Permit Applications, Updated Risk Register, and Updated Sustainability Goals TM. Scope: 2.1. Prepare 60% Plans. Expand on the decisions and concepts developed in the Preliminary Design and finalize sizing calculations. 60% plan documents shall include major modifications, equipment locations, and plans and sections to allow final detailing after the 60%submittal. Specific activities in addition to the activities listed in Amendment No. 1 are shown below: a) General and Civil Plans (no additional sheets, revise 3 sheets) • Update the lift station process flow schematic to identify all improvements to be included in this project (there will no longer be a Phase 1 and 2 implementation strategy). • Finalize pump hydraulic calculations. b) Demolition Sheets (no additional sheets, revise 12 sheets) • Modify the demolition sheets to include replacement of the Grit Basin No. 1 covers and grit room clamshell, modifications to allow for installation of a second bar screen and screening handling in the Bar Screen Room, and replacement of the pumps, motors, piping, valves, and existing bridge crane in the lift station. c) Structural Plans (1 additional sheet, revise 8 sheets) • Update the grit basin plan for new covers for Grit Basin No. 1 and separation of the Grit Room and Storage Room for electrical classification. • Update the bar screen room channel modifications plans to accommodate two bar screens and new gates. Update the bar screen room for new screening handling. • Update plans for replacement of the existing bridge crane. • Develop additional details. d) Architectural Plans ( 2 additional sheets, revise 12 sheets) • Add the Grit Building life safety plan. • Develop details for replacement of the overhead rolling door in the Grit Building. • Develop additional architectural details as needed for separation of the rooms in the Grit Building. e) Process Mechanical (3 additional sheets, revise 10 sheets) • Add plan sheet for the grit building modifications. • Update the Bar Screen room plans and sections for addition of a second screen, new gates, and installation of new screenings handling. • Modify the plans for the lift station to include replacement of the pumps, motors, piping, valves, and existing bridge crane in the lift station. • Develop additional process mechanical detail sheets. • Finalize calculations for the pump hydraulics. • Coordinate with pump manufacturers to develop bar screen specification. • Finalize details for the pump cooling. f) HVAC and Plumbing Plans (no additional sheets, revise 6 sheets) • Add additional details and coordination of HVAC for the bar screen room. g) Electrical Plans(6 additional sheets, revise 8 sheets) • Update the Grit Building area classification for replacement of electrical components to rate the Grit Room as Class 1/Division 1. • Add plans and details for modifications in the Grit Building. • Update the one-line diagram for the Grit Building, Screen Room, and Lift Station. • Update the detailed plans for the Screen Room and Lift Station to reflect the additional equipment included in the project. • Develop detailed plans for the Grit Building including the layout, power plan and lighting plans. • Develop additional electrical details. • Develop electrical specifications for the Grit Room modifications. h) Instrumentation and Control Sheets (No additional sheets, revise 3 sheets) • Update the P&ID's for the bar screen room and Lift Station to show all as new (not future) work. • Add instrumentation details for the screening handling and pumps • Update controls of new pumps with new VFDs and PLC and level of control desired with the WWTP. Update control system architecture and panel drawings. 2.2. Prepare 60%Specifications. ENGINEER will provide additional specifications to those included in Amendment No. 1. The technical specifications for the new work to include the following: • Hydraulic Lids for Grit Basin No. 1 • New Grit Building Clamshell • New Screenings Handling System ■ New Pumps and Motors ■ Piping ■ Valves ■ Electrical Component Replacement in the Grit Building ■ Overhead Rolling Door ■ Additional Bridge Crane 2.3. Lead-Based Paint Sampling. ENGINEER will add additional paint survey and asbestos survey to the original sampling included in Amendment No. 1 to expand to additional areas of demolition. 2.4. Design Workshops. ENGINEER will conduct two additional design workshops to those listed in Amendment No. 1 to discuss the scope of replacement for electrical in the Grit Building and the pump selection. 2.5. Construction Sequencing/Phasing. ENGINEER will consider construction sequencing and phasing of the electrical work in the grit building, screening handling equipment replacement, and installation of new pumps with the phasing already considered in Amendment No. 1. 2.6. Constructability Review. ENGINEER will consider constructability of the electrical work in the grit building, screening handling equipment replacement, and installation of new pumps with the phasing already considered in Amendment No. 1. 2.7. Permits. No changes to scope from Amendment No. 1. 2.8. Risk Management. ENGINEER will update the mitigation strategy listed in Amendment No. 1 for risk factors to include the added work. 2.9. 60%Opinion of Probable Cost. ENGINEER will provide 60% opinion of cost based on the 60%deliverables document for the electrical work in the grit building, screening handling equipment replacement, and installation of new pumps with the phasing already considered in Amendment No. 1. 2.10. Prepare Addendum to the Basis of Design Report.An Addendum to the Basis of Design Report will be prepared in accordance with the Deliverable Guidance Document as described in Amendment No. 1 and will include the additional work included herein. 2.11. Prepare Preliminary Erosion Control Plan. No changes to scope from Amendment No. 1. 2.12. Submit 60% Deliverables for Review.The 60%deliverable described in Amendment No. 1 will include the 60%documents developed for the additional work described herein. 2.13. 60% Design Review Workshop.The electrical design lead will participate in the 60%design workshop described in Amendment No.1. 2.14. Plan-in-Hand Review.The electrical design lead will participate in the 60% plan-in-hand review described in Amendment No.1 to review the modifications to the Grit Building. 2.15. Address Plan and Specification Review Comments. CITY and PMT review comments will be compiled in one Quality Review Form (ORE) document per deliverable and will be submitted to the ENGINEER. ENGINEER will incorporate comments from the QRF into the 90%design including the additional design described herein. 2.16. Small and Emerging Small Businesses Technical Memorandum. No changes to scope from Amendment No. 1. 2.17. Contractor Outreach. ENGINEER will meet with up to four construction contractors to discuss constructability of the project and any potential issues. Comments will be documented and documents updated as needed. TASK 3—90% Design Objective: Develop 90%deliverables for review.This submittal is to provide the CITY and PMT the opportunity to review the plans, specifications, and appurtenant material prior to submitting for regulatory review and bidding the project for construction. Deliverables: 90% Design Drawings, Specifications and Final Design Report; 90%deliverables include: Draft Construction Permit Application, Final Design Report, SEB Inclusion Report, Updated List of Permits, and updated OPC. Scope: 3.1 Prepare 90% Design Drawings.The 90% Design Drawings are meant to be final, bid-ready plans except for addressing comments from the CITY, PMT, and regulatory review and including the additional scope items listed in this amendment. 3.2 Finalize Contract Documents.ENGINEER will finalize the additional technical specifications for inclusion in the project contract documents. 3.3 Prepare Final Design Report(FDR). The FDR is a final compilation of the Basis of Design Report(BODR),the addendum submitted at the 60 percent design stage, and any additional modifications and/or calculations that support the final design of the project and will include the additional scope items listed in this amendment. 3.4 Risk Management. No changes to scope from Amendment No. 1. 3.5 Prepare a Final Erosion Control Plan. No changes to scope from Amendment No. 1. 3.6 Small and Emerging Small Businesses Utilization Form. No changes to scope from Amendment No. 1. 3.7 Prepare Final OPC. No changes to scope from Amendment No. 1. 3.8 Construction Schedule. No changes to scope from Amendment No. 1. 3.9 Permit Applications. No changes to scope from Amendment No. 1. 3.10 Submit 90% Documents for Review. No changes to scope from Amendment No. 1. 3.11 Review Comments. No changes to scope from Amendment No. 1. 3.12 UDRB Submittal. No changes to scope from Amendment No. 1. 3.13 Contractor Outreach. ENGINEER will meet with up to four construction contractors to discuss constructability of the project and any potential issues. Comments will be documented and documents updated as needed. TASK 4—95% Regulatory Review Submittal Objective: Prepare 95% Regulatory Review Submittal.The 95% regulatory review submittal is meant to be a complete, bid-ready set of construction documents incorporating CITY/PMT comments to be submitted to NDEQ for review and approval.This set will be considered ready for construction and will not include "Not for Construction". Deliverables: Updated Final Design Report; 95% Design Drawings and Specifications; Final Construction Permit Application. Scope: 4.1. Prepare 95%Submittal Package. ENGINEER will include drawings and specifications for the additional scope items in the 95% submittal package. TASK 5—Final (100%) Design Objective: Prepare final design development documents including plans and specifications suitable for bidding. Deliverables: Updated Final Design Report, 100% Design Drawings and Specifications, Final Cost Estimate, and permit applications with supplemental data as applicable. Scope: 5.1 Prepare 100%Submittal Package. ENGINEER will include drawings and specifications for the additional scope items in the 100% submittal package as described in Amendment No. 1. 5.2 Sealed Contract Documents.The additional plans and specifications included in this amendment shall be signed and sealed by the project manager and the appropriate disciplines and included with the deliverable described in Amendment No. 1. TASK 6—BIDDING ASSISTANCE AND AWARD OF CONTRACT Objective: Provide assistance to the CITY, on an as requested basis, for assistance during the bidding process and selection of a CONTRACTOR for construction of the Project. Deliverables: Pre-bid conference agenda and minutes, addenda and other items identified by the CITY during the bidding phase, and letter on bid evaluation and recommendation. Scope: 6.1 Transition Meeting No. 1: No changes to scope from Amendment No. 1. 6.2 Administration of Advertisement. No changes to scope from Amendment No. 1. 6.3 Pre-Bid Meeting: No changes to scope from Amendment No. 1. 6.4 Bid Period Questions. ENGINEER will answer questions pertaining to the additional scope items and provide technical interpretation of the contract bid documents and will prepare proposed responses for addenda. 6.5 Prepare Addenda: The ENGINEER will assist the CITY and PMT in preparing and issuing addenda as required to address questions raised at the pre-bid meeting,written questions from bidders, or other Contract Document plan and specification clarifications for the additional scope items. ENGINEER will distribute the addenda to bidders as described in Amendment No. 1. 6.6 Bid Evaluation: No changes to scope from Amendment No. 1. 6.7 Construction Contract Award. No changes to scope from Amendment No. 1. a - I'w83 8 - :it,,: dA 1 =i p3 q s x ..� s s ems r;:c�m Sg - ..e.... a e s s s .teen° e;=ewa ..!e8.000.oeogoo . .....e... "see 6: s a6; '6 F+' i t 3G . s R6Rp a � S x R "a 66$'66RR 6' t"ai e e 1. iS656R5BS.S.ge i .set isae6'RElac $ itt;ti6Sd. % [ • Y. • E .S9 S E C .6. ... 3i5 E ..'etC :6's`. G . I 1 0l i 1 .I ! ; I I II I I I 1 I I 'Alp, to I s.l 6. !' r I s ai 1. ��' MIN I §. N1111_I II 111111IIINIIINUI tiulIE! NIillE11111� x 8 gaz .,..,,, ' I, iv s. a I8� I x aIINIINNI .NI IIIINNIII NNl 1. I I UI III IINIMIllill II slle3l 1 �A:iIiIiiiIiVhiIiiIIIIINI 111111W ::. so II IIIN 1 =11111 III 1 NNI . 1I I I 1 IIININII NI1 g1, .i. III I 1 II ININNI I :NI�NINAI oIOIN�IIII __ I s� l ��III III g 1 IVYI :II ICI :IIII 1 _ ,gi 1 I 1 1 I11 1 1 ! ; I 11 11 1 j l' 1 i I I I e18I I Iy . .. I ffi. ! 6. 1 .. I I i --- a � 6 I �S i . r i 6 i i . I i 4 S SSS 6 6 S S66 - 6 6 S.- SSS6SR66RSRSSS 6SSRSS6SS86` 6 = . SS6 RRRS"SS"S .o Ii 1 II 1 zP 1. I 0o s 1 .. se- j i 6� i 1 sc• --1.. s s . s I I 1 i I I 1 I I I I 1 lE f L ii g' af ➢ ' iF " cf -al;_ $i 'E • . n9F d D r i  1 _ 1 11 , e$ ID:lij 8 -- F & om i nm rz I i 1 1 , _ -I g o l 1 1 1 �3ofo z3 H A 5 000 8 e 550o a oo°o y 1 E 555 P, 5555 I 1 o 1 sl8 0se I I I no1 1 =3 7! I i 1 poi I 1 se I eg ao 8.1lm _ffiv so 8,. r I I 1 117,1, . 1 ss , s. i Ioo 1 I . f 14 5 i sl I I i 111 I Y e e S`eco 5 8888 I _ 1 Ise 1 �1;z$ e sib so 1 1.��s _ ' oo 1 1 50 5ill 1 1 Si S . s ,� 1 1 1 92 a 5. 5s5 - a sssk . II so o, III ag s I e. I I o - u4, ----I z 1 81 s ; seI ' IE": si i s —___5 ` 8, .0 1 1 I 711 I i 1 1 I I I • Task 6—Bidding Assistance and Award of Construction Contract The ENGINEER shall perform all work in accordance with the CSO Program Plans, Protocols, Procedures,Standards, and Guidance Documents listed below and subsequent revisions: These documents can be found on the CSO Web Portal in the following location: http://www.omahacsopt.com/projects/Shared%20Documents/Forms/Document%20Group.aspx The following documents are hereby included in this Scope of Services by reference: Document Name Document Date PLANS Combined Sewer Overflow Control Program Quality IUpdated 12/11/2014 Management Plan Risk Management Plan 04/12/2010Rev0 Environmental Plan Updated May 2013 Construction Management Plan 06/25/2012 Program-Wide Materials Management Plan for Soil 04/06/2012 and Groundwater PROTOCOLS ..... ....... .. Construction Management Protocol Updated 04/18/2013 '. Sewer Separation Protocol Rev. 0.01 Updated 07/30/2010 PROCEDURES City of Omaha Manhole and Lamping Inspection Updated 05/09/2014 Procedure Revision 5 City of Omaha Pipeline Inspection Procedure Using Updated 04/11/2014 Closed Circuit Television Revision 4 Public Information Procedure for CSO and RNC Updated 12/12/2011 Proj ects Document Name Document Date ROW Management and Property Acquisition Procedure Updated 09/16/2010 for(Non-Federal)Projects City of Omaha Smoke and Dye Testing Procedure Updated 03/12/2012 (Revision 3) . .............................................. Community Enhancement Procedure 04/30/2013 Utility Coordination Procedure Updated 02/28/2013 Updated Procedure for Electronic Advertisement 4/15/2014 for Projects in the CSO/RNC Program Document Control Procedure 12/15/2014 Electronic Filing Standard Design 06/13/2014 NDEQ Submittals 03/16/2011 Soil Restoration Project Transition—Design to Construction 04/21/2014 Work Change Acknowledgement 05/10/2012 STANDARDS Omaha CSO Program CAD Standards with Update 03/15/2010 ;. 04/26/2010 With 04/26/2010 Update ......... ...InfoWorks Modeling Standard Updated 06/24/2010 Interim Flow Monitoring Standard,Rev. 0 12/30/2011 Public Works Department Design Division Surveying 03/04/2011 Proposals Guidelines for Preparation and Presentation GUIDANCE DOCUMENTS Sewer Separation Deliverable Expectations Guidance 04/30/2012 Documents ........... Geotechnical Guidance Document Updated 04/10/2014 Sewer Separation Cost Estimate Template Guidance I Updated 06/04/2010 Omaha Green Solutions Site Suitability Assessment 12/21/2009 and BMP Selection Process Guidance Document Private Property Investigation Guidance Updated 07/12/2010 Sanitary Sewer Design Basis and Methodology Updated 06/27/2010 Guidance Storm Sewer Design Basis and Methodology Guidance Updated 06/27/2010 ... ......... . Sustainability Guidance Updated 01/04/2011 Document Name Document Date Urban Design Review Board Guidance Document for /17/2013 Sewer Improvement Projects Liquidated Damages Guidance 01/26/2013 Small & Emerging Small Business (SEB) Program Guidance for Major Facility and Sewer Separation 11/26/2013 Project Teams During Design Memorandum Revised CSO Project Communication: PMT and Project Teams Updated 01/04/2013 Technical Memorandum Omaha Park Department Policies 04/01/2014 c 2sA CITY OF OMAHA LEGISLATIVE CHAMBER Omaha,Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, a professional services agreement with CDM Smith, Inc. to perform study and preliminary engineering phase services for the Burt Izard Lift Station Improvemments Project, known as OPW 52472 (CSO) was approved by City Council Resolution No. 99401 August 12, 2014; and, • WHEREAS, additional final design and bidding assistance services not included in the scope of the original Professional Services Agreement and are required to accomplish construction goals of this project; and, WHEREAS, CDM Smith, Inc. has agreed to perform the additional services needed as detailed in the attached Amendment No. 2 to the Agreement, which by this reference is made a part hereof, for a total additional cost of $505,190.00, which will be paid from the Sewer Revenue Improvements Fund 21124, CSO Control Implementation Organization 116918. Sewer Revenue Bonds will be issued to finance this project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, Amendment No. 2 to the Professional Services Agreement with CDM Smith, Inc. to provide additional final design and bidding assistance services for OPW 52472 (CSO), being the Burt Izard Lift Station Improvements Project, is hereby approved. BE IT FURTHER RESOLVED: THAT, the Finance Department is authorized to pay an additional $505,190.00 for these items, to be paid from the Sewer Revenue Improvements Fund 21124, CSO Control Implementation Organization 116918. Sewer Revenue Bonds will be issued to finance this project. 1121tns APPROVED AS TO FORM: TY ATTORNEY DATE By ,1...o • uncilmember Adopted �...2..3...201 7-0 City Clerk f�/0/��14• Approve rM. �� U Mayor NO. \\W) Resolution by Res. that, as recommended by the Mayor, Amendment No. 2 to the Professional Services Agreement with CDM Smith, Inc. to provide additional final design and bidding assistance services for OPW 52472 (CSO), being the Burt Izard Lift Station Improvements Project, is hereby approved; and that the Finance Department is authorized to pay an additional $505,190.00 for these items, to be paid from the Sewer Revenue Improvements Fund 21124, CSO Control Implementation Organization 116918. Sewer Revenue Bonds will be issued to finance this project. 1121Atns Presented to City Council AUG 23201.6 Adopted -67 guiier grow City Clerk