Loading...
RES 2017-0631 - Contract with NL&L Concrete Inc for OPW 53132, 2017 residential ADA ramp construction s Public Works Department 4ibr Omaha/Douglas Civic Center it [ « n x �� 1819 Farnam Street,Suite 601 *-4:41 *�"^' MAY 1 6 2017 Omaha,Nebraska 68183-0601 �OoR 4�ro (402)444-5220 kil'ED FEBR Fax(402)444-5248 City of Omaha Robert G. Stubbe,P.E. Jean Stothert,Mayor Public Works Director Honorable President and Members of the City Council, The attached Resolution approves the contract with N L & L Concrete Inc for OPW 53132, being the 2017 Residential ADA Ramp Construction Project. The following bids were received on March 29, 2017. A detailed bid tabulation is attached. Contractor Total Bid N L & L Concrete Inc $1,097,334.75 (Low Bid) Swain Construction, Inc. $1,211,722.81 N L & L Concrete Inc has filed the required Contract Compliance Report Form (CC-1), and has submitted a responsive Economic Inclusion Plan, as determined by the Human Rights and Relations Department. As is city policy, the Human Rights and Relations Department will review the contractor to ensure compliance with the Contract Compliance Ordinance. The Finance Department is authorized to pay the cost of OPW 53132 from the 2014 Transportation Bond Fund 13184, Transportation Bonds Organization 117117. The Public Works Department recommends the acceptance of the bid from N L & L Concrete Inc in the amount of $1,097,334.75, being the lowest bid received, and requests your consideration and approval of this Resolution. Re ectfully submitted Approved: .1217 Robert G. Stubbe, P.E. Date Spender K. Danner Jr. Date Public Works Director Human Rights and Rel ions Director Approved as to Funding: Referred to City Coun it for Consideration: 14_C- Ste n B. Curtiss Date Mayor's Office Date Finance Director 1053Cgrp Bid Tabulation Public Works Department Omaha, Nebraska Wednesday, March 29, 2017 Project Summary OPW 53132 English Yes Metric: No Description: 2017 RESIDENTIAL ADA RAMP CONSTRUCTION AT VARIOUS LOCATIONS Start Date: Completion Date: Labor Release Date: Field Book Number: Test Core Lengths: Council Resolution: Adoption Date: Percent Reserve Due: 10.0% Percent Complete: 0.0% Percent Time Used: 0.0% Engineer's Total: $1,886,723.00 Contract Total $0.00 Total Penalties: $0.00 Total Payments: $0.00 Contractor: Phone#: Fax#: Email address: Page 1 of 7, 3/29/2017 2:47:01 PM, Bid Tabulation, Generated by: admin for project OPW 53132 Account/Funding Summary Fund Org. Description Engineer Contract Penalties Payments 13184 117117 2014 Transportation Bond $1,886,723.00 $0.00 $0.00 $0.00 $1,886,723.00 $0.00 $0.00 $0.00 Page 2 of 7, 3/29/2017 2:47:01 PM, Bid Tabulation, Generated by: admin for project OPW 53132 Bid Summary(low to high bidder) Contractor Engineer's Estimate: $1,886,723.00 Diff From Low: $789,388.25 N L&L Concrete Inc Bid: $1,097,334.75 8535 Madison St Diff From Low: $0.00 Ralston NE 68127- Swain Construction,Inc. Bid: $1,211,722.81 6002 North 89th Circle Diff From Low: $114,388.06 Omaha NE 68134- Number of Bids: 2 Low Bid: $1,097,334.75 High Bid: $1,211,722.81 Average Bid:: $1,154,528.78 Page 3 of 7, 3/29/2017 2:47:01 PM, Bid Tabulation, Generated by: admin for project OPW 53132 Type Line# Item # Description Quantity Price Total 1 0105.140 REMOVE SIDEWALK Engineeer's Estimate 718 @ $5.00 per SF $3,590.00 N L&L Concrete Inc $3.00 per SF $2,154.00 Swain Construction, Inc. $1.20 per SF $861.60 2 0105.110 REMOVE DRIVEWAY Engineeer's Estimate 20 @ $50.00 per SY $1,000.00 N L&L Concrete Inc $27.00 per SY $540.00 Swain Construction, Inc. $4.90 per SY $98.00 3 8000.059 REPAIR 4"CONCRETE SIDEWALK Engineeer's Estimate 52501 @ $10.00 per SF $525,010.00 N L&L Concrete Inc $5.75 per SF $301,880.75 Swain Construction, Inc. $5.22 per SF $274,055.22 4 8000.060 REPAIR 6"CONCRETE SIDEWALK Engineeer's Estimate 4559 @ $10.00 per SF $45,590.00 N L&L Concrete Inc $6.00 per SF $27,354.00 Swain Construction, Inc. $6.88 per SF $31,365.92 5 1002.010 REPAIR CURB AND GUTTER Engineeer's Estimate 9990 @ $37.00 per LF $369,630.00 N L&L Concrete Inc $28.00 per LF $279,720.00 Swain Construction, Inc. $32.10 per LF $320,679.00 6 1002.020 REPAIR DRIVEWAY Engineeer's Estimate 180 @ $100.00 per SY $18,000.00 N L&L Concrete Inc $60.00 per SY $10,800.00 Swain Construction, Inc. $49.00 per SY $8,820.00 7 1002.001 REPAIR PAVEMENT-SMALL AREA Engineeer's Estimate 32 @ $100.00 per SY $3,200.00 N L&L Concrete Inc $90.00 per SY $2,880.00 Swain Construction, Inc. $54.00 per SY $1,728.00 8 1002.040 REPAIR MEDIAN SURFACING Engineeer's Estimate 100 @ $18.00 per SF $1,800.00 N L&L Concrete Inc $8.00 per SF $800.00 Swain Construction, Inc. $9.95 per SF $995.00 9 0702.760 ADJUST MANHOLE TO GRADE Engineeer's Estimate 22 @ $350.00 EACH $7,700.00 N L& L Concrete Inc $250.00 EACH $5,500.00 Swain Construction, Inc. $135.00 EACH $2,970.00 10 0501.400 ADJUST UTILITY VALVE TO GRADE Engineeer's Estimate 72 @ $250.00 EACH $18,000.00 N L& L Concrete Inc $100.00 EACH $7,200.00 Swain Construction, Inc. $100.00 EACH $7,200.00 11 0804.000 INSTALL SODDING Engineeer's Estimate 100 @ $15.00 per SY $1,500.00 N L&L Concrete Inc $12.00 per SY $1,200.00 Swain Construction, Inc. $4.00 per SY $400.00 12 0802.200 INSTALL SEEDING-TYPE B Engineeer's Estimate 100 @ $5.00 per SY $500.00 • N L&L Concrete Inc $3.00 per SY $300.00 Swain Construction, Inc. $2.95 per SY $295.00 Page 4 of 7, 3/29/2017 2:47:01 PM, Bid Tabulation, Generated by: admin for project OPW 53132 Type Line# Item# Description Quantity Price Total 13 0504.000 CONSTRUCT CURB RAMP Engineeer's Estimate 18698 @ $19.00 per SF $355,262.00 N L&L Concrete Inc $10.50 per SF $196,329.00 Swain Construction, Inc. $13.10 per SF $244,943.80 14 8000.010 REMOVE AND RESET EXISTING RETAINING WALL Engineeer's Estimate 255 @ $75.00 per SF $19,125.00 N L&L Concrete Inc $25.00 per SF $6,375.00 Swain Construction, Inc. $24.00 per SF $6,120.00 15 9000.015 REMOVE EXISTING RETAINING WALL Engineeer's Estimate 10 @ $50.00 per SF $500.00 N L&L Concrete Inc $15.00 per SF $150.00 Swain Construction, Inc. $5.00 per SF $50.00 16 0606.000 CONSTRUCT REINFORCED PCC RETAINING WALL Engineeer's Estimate 10 @ $165.00 per CY $1,650.00 N L&L Concrete Inc $153.00 per CY $1,530.00 Swain Construction, Inc. $240.00 per CY $2,400.00 17 0503.100 CONSTRUCT SIDEWALK CURBWALL Engineeer's Estimate 141 @ $25.00 per SF $3,525.00 N L&L Concrete Inc $20.00 per SF $2,820.00 Swain Construction, Inc. $17.00 per SF $2,397.00 18 0605.000 CONSTRUCT SEGMENTAL RETAINING WALL Engineeer's Estimate 232 a@ $27.00 per SF $6,264.00 N L&L Concrete Inc $25.00 per SF $5,800.00 Swain Construction, Inc. $18.00 per SF $4,176.00 19 1102.000 REMOVE AND INSTALL NEW SPRINKLER SYSTEM HEAD Engineeer's Estimate 15 @ $75.00 EACH $1,125.00 N L&L Concrete Inc $55.00 EACH $825.00 Swain Construction, Inc. $60.00 EACH $900.00 20 0504.100 CONSTRUCT DETECTABLE WARNING PANEL Engineeer's Estimate 4168 @ $36.00 per SF $150,048.00 N L&L Concrete Inc $13.00 per SF $54,184.00 Swain Construction, Inc. $19.66 per SF $81,942.88 21 0103.410 REMOVE AND RELOCATE FENCE Engineeer's Estimate 57 @ $22.00 per LF $1,254.00 N L&L Concrete Inc $20.00 per LF $1,140.00 Swain Construction, Inc. $28.00 per LF $1,596.00 22 8000.007 CLEARING AND GRUBBING PER INTERSECTION CORNER Engineeer's Estimate 351 @ $180.00 EACH $63,180.00 N L&L Concrete Inc $100.00 EACH $35,100.00 Swain Construction, Inc. $166.00 EACH $58,266.00 23 0102.300 TRIM TREE ROOT Engineeer's Estimate 4 @ $32.00 per LABOR HO $128.00 N L&L Concrete Inc $35.00 per LABOR HO $140.00 Swain Construction, Inc. $20.00 per LABOR HO $80.00 24 8000.011 TOWING Engineeer's Estimate 4 @ $150.00 per HR $600.00 N L&L Concrete Inc $100.00 per HR $400.00 Swain Construction, Inc. $100.00 per HR $400.00 Page 5 of 7, 3/29/20 1 7 2:47:01 PM, Bid Tabulation, Generated by: admin for project OPW 53132 Type Line# Item# Description Quantity Price Total 25 0201.300 EMBANKMENT-BORROW Engineeer's Estimate 100 @ $18.00 per CY $1,800.00 N L&L Concrete Inc $14.00 per CY $1,400.00 Swain Construction, Inc. $10.00 per CY $1,000.00 26 0201.100 EXCAVATION HAUL-OFF Engineeer's Estimate 100 @ $18.00 per CY $1,800.00 N L&L Concrete Inc $16.00 per CY $1,600.00 Swain Construction, Inc. $10.00 per CY $1,000.00 27 8000.031 PROVIDE TEMPORARY TRAFFIC CONTROL-PER INTERSECTION CORNER Engineeer's Estimate 351 @ $100.00 EACH $35,100.00 N L&L Concrete Inc $65.00 EACH $22,815.00 Swain Construction, Inc. $46.65 EACH $16,374.15 28 0906.110 FURNISH FLASHING ARROW PANEL Engineeer's Estimate 20 @ $65.00 per DAY $1,300.00 N L&L Concrete Inc $46.00 per DAY $920.00 Swain Construction, Inc. $27.75 per DAY $555.00 29 0503.201 CONSTRUCT 6-INCH IMPRINTED PCC SURFACING Engineeer's Estimate 7294 @ $18.00 per SF $131,292.00 N L&L Concrete Inc $7.00 per SF $51,058.00 Swain Construction, Inc. $8.96 per SF $65,354.24 30 1004.040 REMOVE AND REPLACE PRECAST INLET TOP Engineeer's Estimate 21 @ $4,000.00 EACH $84,000.00 N L&L Concrete Inc $2,300.00 EACH $48,300.00 Swain Construction, Inc. $2,900.00 EACH $60,900.00 31 8000.016 RECONSTRUCT INLET Engineeer's Estimate 4 @ $3,000.00 EACH $12,000.00 N L&L Concrete Inc $3,500.00 EACH $14,000.00 Swain Construction, Inc. $1,900.00 EACH $7,600.00 32 8000.028 TRAFFIC SIGNAL FACILITY ADJUSTMENT Engineer's Estimate 2 @ $600.00 per HR $1,200.00 N L&L Concrete Inc $465.00 per HR $930.00 Swain Construction, Inc. $460.00 per HR $920.00 33 9000.033 REPAIR CONCRETE FLUME Engineeer's Estimate 30 @ $25.00 per SF $750.00 N L&L Concrete Inc $8.00 per SF $240.00 Swain Construction, Inc. $16.00 per SF $480.00 34 8000.040 RENTAL OF LOADER, FULLY OPERATED Engineeer's Estimate 10 @ $60.00 per HR $600.00 N L&L Concrete Inc $175.00 per HR $1,750.00 Swain Construction, Inc. $50.00 per HR $500.00 35 8000.041 RENTAL OF SKID LOADER, FULLY OPERATED Engineeer's Estimate 10 @ $60.00 per HR $600.00 N L&L Concrete Inc $95.00 per HR $950.00 Swain Construction, Inc. $40.00 per HR $400.00 36 8000.042 RENTAL OF DUMP TRUCK, FULLY OPERATED Engineeer's Estimate 10 @ $60.00 per HR $600.00 N L&L Concrete Inc $125.00 per HR $1,250.00 Swain Construction, Inc. $40.00 per HR $400.00 Page 6 of 7, 3/29/2017 2:47:01 PM, Bid Tabulation, Generated by: admin for project OPW 53132 Type Line# Item# Description Quantity Price Total 37 0501.300 CONSTRUCT CONCRETE HEADER Engineeer's Estimate 350 @ $50.00 per LF $17,500.00 N L&L Concrete Inc $20.00 per LF $7,000.00 Swain Construction, Inc. $10.00 per LF $3,500.00 (LINES 1 Through 37 INCLUSIVE) Bid Tabulation, generated b _map o 3/29/2017 2:47:01 PM for project OPW 53132 CERTIFIED BY: DATE. 3/2-Z /(7 Page 7 of 7, 3/29/2017 2:47:01 PM, Bid Tabulation, Generated by: admin for project OPW 53132 C-25A CITY OF OMAHA LEGISLATIVE CHAMBER Omaha, Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, bids were submitted on March 29, 2017 for OPW 53132, being the 2017 Residential ADA Ramp Construction Project; and, WHEREAS, N L & L Concrete Inc submitted a bid of $1,097,334.75, being the low bid received for OPW 53132; and, WHEREAS, the Finance Department is authorized to pay the cost of OPW 53132 from the 2014 Transportation Bond Fund 13184, Transportation Bonds Organization 117117. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, the contract with N L & L Concrete Inc for OPW 53132, being the 2017 Residential ADA Ramp Construction Project, is hereby approved. BE IT FURTHER RESOLVED: THAT, the Finance Department is authorized to pay the cost of $1,097,334.75 for OPW 53132 from the 2014 Transportation Bond Fund 13184, Transportation Bonds Organization 117117. APPROVED AS TO FORM: ITY ATTORNEY DATE 1053grp 4L1 ,• Councilmember Adopted MAY 1 6 2017 -1 - 6 Q o\ City Clerk 51 -` Approve /�!A — Mayor NO. .... Resolution by Res. that, as recommended by the Mayor, the contract with N L & L Concrete Inc for OPW 53132, being the 2017 Residential ADA Ramp Construction Project, is hereby approved; and that, the Finance Department is authorized to pay the cost of $1,097,334.75 for OPW 53132 from the 2014 Transportation Bond Fund 13184, Transportation Bonds Organization 117117. 1053Bgrp Presented to City Council MAY 1 62017 Adopted , 87tzabeth Butler City Clerk