Loading...
RES 1997-0497 - Change order to contract with Hawkins Construction Compoany for civic auditorium renovation '%• �� . . o OMAHA'A'E'B r c IVF D. +" �-t°` �°s,� l' IY d inistrative Services Department Aicalrkil1 , � `s++►►, -g Omaha/Douglas Civic Center x W�tjl f.'J 1 „^ 97 J t 34 AM 8: 07 1819 Farnam Street,Suite 706 f®.i' f(1'� � Omaha,Nebraska 68183-0706 (402)444-3814 °'rFa FEBRV� CITY CLERK FAX(402)444-5903 City of Omaha 0 M A H A, N E R A S K a Joseph A.Mangiamelli Hal Daub,Mayor Director February 11, 1997 Honorable President and Members of the City Council,, Transmitted herewith is a Resolution approving a Contract Change Order with Hawkins Construction Company for the construction of the hockey locker facilities as part of the Civic Auditorium Renovation project. The City Council, on May 14, 1996, authorized this project when it approved the renovation contract and the agreement with the University of Nebraska at Omaha for the installation of the ice rink for the university hockey program. The hockey facility was relocated from the interior space of the arena to the western exterior of the Auditorium east of the parking garage in an effort to accommodate the floor space requirements of "flat show" users; Leo A. Daly Company was authorized to prepare plans and specifications for the locker facilities. Bids were received for the hockey locker facilities on January 15, 1997 with bids being received from twelve contractors as shown on the attached Bid Tabulation Sheet and Hawkins Construction Company submitting the lowest bid of$442,000.00 for this project. In addition to the cost of the hockey locker structure,Hawkins Construction Company will provide fixtures previously included in the renovation contract but being relocated from the prior design concept to the current location. Since Hawkins Construction Company is the low bidder,the work is being recommended under a Contract Change Order to avoid the necessity of a new contract,new performance bond and assorted documentation. The value of this Change Order, however, must be approved by the City Council prior to work initiation in accord with Section 10-142, Omaha Municipal Code. This Contract Change Order will be paid from the Civic Auditorium Ice Facility Fund 337, Organization 2338. 4, x Honorable President and Members of the City Council Page-2- The Administrative Services Department recommends approval of this Contract Change Order with. Hawkins Construction Company based on their low bid of $442,000.00 for the hockey locker facilities at the Civic Auditorium. • Sinc ly,) , 9-44/ M a •seph A. +angi. • elli,Director Date loved as to Funding: Referred t City Counc- for Consideration: 4 , ,,‘ --- -(C.j,),1.4* 1/VM7 Louis A. D'Ercole / � Data Mayor's Office D to Acting Finance Director f t t P:\ASD\4503.SAP I i 0 n 7 o O D (77 a o = C ,j. _+ a w T m D r Z D Z D c:a o m c co = n -1 -U O n O n 0 o O < O c .. • x „, ,- CD Z 'R ry Z -' Z -a m N v, n n n C7 O 0 cD 9s ni X O = 0 D �, m D k< : * r n Q D C 71 2) 0 0 r I r C v Q. o 3 �, 0 CO N O 07 v m ' m N O to I. = o m m K m .- v m C Z E , flJ O Ofi,o 'z. m D o ' mI m D o o z m O m D D cn fD 0 Z , Q , 0 Q CAD .Q c —1 O c 0 < m m o D ZO 0 3 m Z - O 63, `� Z t c . Z ,g UZ T ov.,_ .:,1 0_ __ , t,;, , su xi —1 . vg .64. ,k,,t, mot. r 0Z \% II `i' ee it--,- ii C � Z �� -°l C 1 z • rn A4. op4.1 m r • ' 03° 74zA. L; t Pg. gl , . . m q , , t _____ i 0 v v Q D xi C v -. _ CD j O gu CM D C •• DCO a D r -. 3 D Z > Z D m o m CO = 0 = n 53 0 0 0 0 _ C g a a Q C Q G n N Z - Z .00 CCD N N• (7 C) Z F.; —. D D r- I- r 0 D.0 v D -< C -n `C o g m m c 0i 0 g o 0 v • rn �� r —iiiiii 0 --I C1 ' -4, `D o c . -- -0 v 0 Q O 3 v o Z Z <° (D v m C Z O O ' • D -.71 ; -„ 5 _ o !. v m I > D c o - Z p Z .= 0 Q < Z I, m o _-a 0 3 coo Z --1 C C = O O iLJ Z Oc . F,. rn ' ;. 4:ir.. ': ::::::::::: .::i.::iti�i:ii":%}ii}�;:'�tiiiii:%ii C C rn 1 �. 1 1 C c s C� — > ':%`:»;"CSC.'`"'>>' :"'`�'`:`' ><> <:< » g . m g M 1 I � -n � c '� 1 is %:.. N V Z m 0 F V v m 18 4% ii}%%j?i 1 V r:':f.. CF ::•::F f . , C C kl- C Z 1 m isF....%... z ...... rn �b?........... ..... n . ....... ......... ............ ............................. THE CITY OF OMAHA DEPARTMENT OF ADMINISTRATIVE SERVICES CONTRACT ADMINISTRATION DIVISION 1819 FARNAM STREET, SUITE 706 OMAHA,NE 68183-0706 402-444-4574 CHANGE ORDER PROJECT: Civic Auditorium Renovation PROJECT NUMBER: CONTRACT DATE: 5/14/1996 CHANGE ORDER NO: INITIATION DATE: 1996 MAY TO: Hawkins Construction Co. P.O.Box 9008 Sta C Omaha,NE 68109 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THIS CONTRACT: Furnish all labor, superintendence,materials and equipment to construct Hockey Locker Addition to the Civic Auditorium in accord with plans and specifications,addenda issued for the same and bid proposal submitted January 15, 1997,copy attached. Contractor to provide,within 10 days of signing this change order,Performance, Payment and Guarantee Bond to reflect the addition of this work to the rennovation contract approved by City Council May 14, 1996. ADD $442,000 ATTEST: City Clerk NOT VALID UNTIL SIGNED BY BOTH THE OWNER AND THE CONTRACTOR. SIGNATURE OF THE CONTRACTOR INDICATES AGREEMENT HEREWITH,INCLUDING ANY ADJUSTMENT IN THE CONTRACT SUM OR CONTRACT TIME. The original Contract Sum was $ 13,077,000.00 Net change by previously authorized Change Orders $ The Contract Sum prior to this Change Order was $ The Contract Sum will be increased by this Change Order $ 442,000.00 The new Contract Sum including this Change Order will be $ 13,519,000.00 The Contract time will be increased/unchanged/decreased by 0 Days The Date of Substantial Completion as of the date of this Change Order therefore is 9/1/97. CONT' A - OR'S ACCEPTANCE: ARCHITECT'S ACCEPTANCE: OWNE':.. = 'PRA VAL. !t, t/ BY: f,�`�10% BY: N/A BY: DATE: .2 /'7 7 DATE: DATE: 45/79 PH-GB !2S) CITY OF OMAHA • REQUEST FOR BID AND BID SHEET • FROM: P.M. Burke ON HOCKEY LOCKER ADDITION Published 24 December 1996 City Purchasing Agent 1003 Omaha-Douglas Civic Center 1819 Farnam Street NOT AN ORDER Page 1 of 2 Pages Omaha, Nebraska 68183-0011 • BID BOND OR CERTIFIED CHECK REQUIRED IN THE AMOUNT OF 5% IF THE TOTAL AMOUNT FOR THE ITEMS OFFERED IS$20,000 OR MORE Bid Closing Date: 15 January 1997 11:00 A.M. IMPORTANT 4. If Federal Excise Tax applies,show amount of same and deduct. Exemption certificates will be furnished. Do not include tax in bid. 1. Bid must be in the office of the CITY CLERK,LC-1, 5.BID MUST INCLUDE ANY DELIVERY OR SHIPPING CHARGES. OMAHA-DOUGLAS CIVIC CENTER, 1819 Famam Street,Omaha,NE 68183-0011 by closing date and time indicated,in sealed envelope 6.When submitting bid on items listed,bidder may on a separate sheet. marked BID ON HOCKEY LOCKER ADDITION make suggestions covering reduction in costs wherever this is possible through redesign,change of material or utilization of standard 2.As evidence of good faith a bid bond or certified check must be . items or quantity change. submitted with bid. FAILURE TO DO SO IS CAUSE FOR REJECTION. 7.If you do not desire to bid,return sheets with reasons for declining. 3. Right is reserved to accept or reject any or all bids in their entirety. Right Failure to do so will indicate your desire to be removed from our is also reserved to accept or reject any part of your bid unless otherwise mailing list.If you desire a copy of tabulation check; J. indicated by you. Please do not call for this information. Quote your lowest price, best delivery and terms, F.O.B. delivery point on the items(s) listed below: This is to certify that the undersigned has read and examined (a)the advertisements, (b)the requirements for bidding and instructions to bidders and (c)the specifications prepared by the Contract Administration Division of the Department of Administrative Services for the HOCKEY LOCKER ADDITION at Civic Auditorium,1804 Capitol Ave. Omaha, Nebraska; and, that the bidder has made all the examinations and investigations required by said documents. BIDDER ACKNOWLEDGES RECEIPT OF ADDENDA NO. 1 ,THROUGH 2 . It is understood (a)that as to the contract which may be awarded upon this proposal,the Contract period will be the term beginning with the notice to proceed and ending with the acceptance of the work,the number of consecutive calendar days hereinafter agreed on; and(b)that it is the intention of the Contract Administration Division that a contract shall be awarded to the bidder regarded by the City of Omaha as having submitted the lowest and best bid, having regard for his fitness and capacity to furnish in sufficient quantities the quality of material considered by said Contract Administration Division to best meet the requirements of the Contract Administration Division; material purchased for this project will be State of Nebraska and City sales tax exempt. On the foregoing, understand that the bidder hereby offers and proposes to: Furnish all material, labor and equipment necessary to complete the HOCKY LOCKER ADDITION ` / in corcance ith the Prr visions of t is prop sal nd documents. Total price for all work includes in the sum of$ 1 'W h d/' eal ID r,j toot) 4/A/761 ram/ as ($ yW2, )• • • All bidders awarded a contract in the amount of S5,000 or more must comply with the Contract Compliance Ordinance and have on file with the Human Relations Department the Annual Contract Compliance Report(Form CC-1).This report shall be in effect for 12 months from the date received by the Human Relations Department.Any questions regarding the Contract Compliance Ordinance should be directed to Contract Compliance Officers Rita Viademar at(402)444-5067 or Tony Acosta at(402)444-5053;however,please refer any questions regarding the REQUEST FOR BID or SPECIFICATIONS directly to the Purchasing Department(402)444-5400 or as shown on bid. (Please Print Legibly or Type) • Payment Terms ` %,X)L T . Firm HAWKINS CONSTRUCTION CO. In o rated in NEBRASKA ate) Delivery(or completion) Name FRED H. HAWKINS, J R. Signat /.5-O calendar days following award Title PRESIDENT Phone402-342-1607 Fax402- 2-3221 Address P 0 BOX:-9008 STA C OMAHA NE 68109 Street/P.O.Box City State Zip 1 PH-8B (96) CITY OF OMAHA • REQUEST FOR BIDS • ON HOCKEY LOCKER ADDITION NOT AN ORDER Page 2 of 2 Pages The bidder hereby states that the above total cost to the City of Omaha includes all material, taxes, insurance royalties; transportation charges, use of all necessary tools and equipment, supervision, inspection and tests of materials, bond and overhead expense, all equipment furnished in accordance with the requirements of the contract documents considered severally and collectively. "The bidder agrees that the Work shall be substantially completed on or before August 15, 1997." It is understood that the contract documents shall consist of the advertisement,'the requirements for bidding and instruction to bidders, this proposal and drawing sheet titled: HOCKEY LOCKER ADDITION at Civic Auditorium 1304 Capitol Ave and dated: 20 DECEMBER 1996 , the specifications and the duly executed agreement or contract proper; that, said complementary and that which is required, shown or specified by any one of these, shall be as binding as if required by all. The bidder hereby represents that the price contained in this proposal is neither directly nor indirectly the result of any agreement or any secret understanding with anyone with respect to any provisions contained in this proposal. In accordance with the requirements for bidding and instructions to bidders, there is deposited herewith a bid bond or a certified check payable to the order of the City of Omaha, in the sum of: BID BOND FOR 5% OF THE TOTAL AMOUNT OF BID ($ ), which is at least five percentum of the aggregate amount of the proposal. It is agreed that, in the event the bidder is awarded a contract based on this proposal , or a part thereof and fails or refuses to execute a written contract or fails to furnish a performance bond within ten days after the award of said contract, the sum deposited herewith shall be retained by the City of Omaha as liquidated damages and not as a penalty, as it is expressly agreed that said sum is a fair measure of the damages which will be sustained by the City of Omaha in case of any such failure or refusal on the part of the bidder. The said sum, however, will be returned to the bidder, if and when he shall faithfully keep and perform all of the conditions set fourth in the advertisement and the requirements for bidding and instructions to bidders, and furnish an acceptable surety bond. NOTICE: Unless the foregoing proposal is free from alterations, additions and deductions_and unless the name of the bidder as signed thereto is complete and correct, in accordance with the instructions to bidders, it may be rejected as; informal. Plans and specifications must be returned by 12 February, 1997 for$50.00 deposit return. SIGN ALL COPIES Firm HAW- INS ,CO STRUCTLON CO. it KINS, PRESTI1FNT CONTINUATION SHEET =C.25A' CITY OF OMAHA LEGISLATIVE CHAMBER Omaha,Nebr FVkr:uaxy...1.1 19 97 RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, the construction of a hockey locker facility was authorized by the City Council on May 14, 1996 as part of the renovation of the Civic Auditorium; and, WHEREAS,Hawkins Construction Company submitted a bid of$442,000.00,being the lowest and best bid received for the hockey locker facilities on January 15, 1997; and, WHEREAS,the Administrative Services Department recommends acceptance of the low bid from Hawkins Construction Company for the locker facilities and incorporation of the same as a Change Order to the Contract for Civic Auditorium renovation; and, WHEREAS, the value of this Change Order is such that the City Council must, in accordance with Section 10-142,Omaha Municipal Code,approve the same prior to initiation of the work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT,the low bid of$442,000.00 received from Hawkins Construction Company on January 15, 1997 for the construction of hockey locker facilities is accepted and the work is authorized to proceed as a Change Order to the existing contract with the contractor for Civic Auditorium renovation. • BE IT FURTHER RESOLVED: THAT, this authorization is made in accord with Section 10-142 of the Omaha • Municipal Code. By Councilmember Adopted City Cle F • Approved.. :.. .: • •••• ayor 25A'. CITY OF OMAHA LEGISLATIVE CHAMBER Omaha,Nebr February 11 1997 Page -2- BE IT ALSO FURTHER RESOLVED: THAT,the Finance Department is authorized to pay the cost of work performed under this Contract Change Order from the Civic Auditorium Ice Facility Fund 337,Organization 2338. APPROVED AS TO FOAM: qr. ‘ I -0)1) ASSISTP'NT ITY ATTORNEY Date V P:\ASD\4504.SAP • • • By :Lti lhrs .... Councilmember Adopted.... ..Q...1....1...1997 .... . 41/101 City C. k Approved:... .. . .. ..... Mayor b Wa0; oa � � . •O0o od y * xw o a , a N --0 5' Er.p Oo O O ''vv tk WSJ O p' iil (� • • ''% .1c: 0. _ O p ti --.. \ UQ5. 2E7-.,_,.3,-, `< N o"+ O 15• c. O . . n • . \ 1 ' eit)r . . S