Loading...
RES 1999-1314 - PO to KC Petersen Construction Company Inc to repair concrete panels at Missouri River WWTP QMAHA.NFg , � Public Works Department �'J�' Omaha/Douglas Civic Center �®. CY imt, May 1 8, 1 999 1819 Famam Street,Suite 601 Omaha,Nebraska 68183-0601 Q�TFD FEBR°ryry (402)444-5220 Telefax(402)444-5248 City of Omaha Don W.Elliott,P.E. Hal Daub,Mayor Public Works Director Honorable President and Members of the City Council, Transmitted herewith is a Bid Tabulation and a Resolution authorizing the Purchasing Agent to issue a purchase order to K. C. Petersen Construction Company,Inc., on the bid to repair concrete panels at the Missouri River Wastewater Treatment Plant. The following bids were received on April 21, 1999. Contractor Total Bid K. C. PETERSEN CONSTRUCTION COMPANY, INC. $34,400.00 (LOW BID) W. Boyd Jones $44,290.00 Swain Construction $44,720.00 Nararros Trucking $45,494.00 C. R. Welshiemer Company $45,580.00 Riteway Construction $46,440.00 Tab Construction $47,644.00 All Purpose Utilities $48,160.00 R& A Construction $50,000.00 Coleman Construction $53,535.00 US Asphalt $54,438.00 A copy of the bid documents is on file and available for inspection and review in the City Clerk's Office. The contractor has on file a current.Annual Contract Compliance Report Form (CC-1). As is City policy, the Human Relations Director will review the contractor to ensure compliance with the Contract Compliance Ordinance. The Finance Department is authorized to pay the cost of repairing concrete panels at the Missouri Wastewater Treatment Plant from the Missouri River Plant Maintenance Organization 1472, Sewer Revenue Fund 541. • 'h Honorable President and Members of the City Council Page 2 The Public Works Department recommends the acceptance of the bid from K. C. Petersen Construction Company, Inc., in the amount of$34,400.00, being the lowest and best bid received, and requests your consideration and approval of this Resolution. Respectfully submitted, Referred to City Council for Consideration: , n W. El iott, P. . Date Mayor's Office/Title Date Director roved: Approved: ir‘ Louis A. D'Ercoleer; a Dte Rita Vlademar. Date Finance Director Acting Human Relations Director P:\PW 1\7186.MAF ' Finance Department °w"HA•^,lir4, Off e'P.t - Purchasing Division :01!r�-1: ' Omaha/Douglas Civic Center �t^�`j�� t „ 1819 Farnam Street,Suite 1003 o®L ri. 16�' '",'a Omaha,Nebraska 68183-1003 (402)444-5400 °R Fax�TfD FEBRV Fax(402)444-5423 r P City of Omaha Purchasing. Agent Burke Hal Daub,Mayor April 14, 1999 NOTICE TO BIDDERS REQUEST FOR BID ON REPAIR CONCRETE PANELS AT MO RIVER WWTP Original Closing Date April 14, 1999 ADDENDUM NO. 1 Replace original bid sheet with bid sheet attached. Change Closing Date to April 21, 1999. I ACKNOWLEDGE RECEIPT OF THIS ADDENDUM BY SIGNING BELOW AND RETU NG THIS ADDENDUM WITH YOUR BID. ". . Burke . City Purchasing Agent • PMB:js 6 :G";5=%0a9 ti.:4-5:117" G':°#'13377:40'. �'�-Sam • r , Cti) CITY OF OMAHA J.T.L. REQUEST FOR BID AND BID SHEET ON REPAIR CONCRETE PANELS AT MO RIVER WWTP FROM: P. M. Burke Published April 1 5, 1 999 City Purchasing Agent 1003 Omaha-Douglas Civic Center NOT AN ORDER Page 1 1819 Farnam Street Omaha, Nebraska 68183-0011 BID BOND OR CERTIFIED CHECK REQUIRED IN THE AMOUNT OF 5% IF THE TOTAL AMOUNT FOR THE ITEMS OFFERED IS$20,000 OR MORE Bid Closing Date April 21, 1999 11:00 A.M. IMPORTANT 4.If Federal Excise Tax applies,show amount of same and deduct. Exemption certificates will be furnished. Do not include tax in bid. 1. Bid must be in the office of the CITY CLERK,LC-1, OMAHA-DOUGLAS CIVIC CENTER,1819 Farnam Street,Omaha,NE 68183-0011 by the 5.BID MUST INCLUDE ANY DELIVERY OR SHIPPING CHARGES. closing date and time indicated,in sealed envelope marked BID ON 6.When submitting bid on items listed,bidder may on a separate sheet, REPAIR CONCRETE PANELS AT MO RIVER WWTP make suggestions covering reduction in costs wherever this is 2. As evidence of good faith a bid bond or certified check must be possible through redesign,change of material or utilization of standard submitted with bid. FAILURE TO DO SO IS CAUSE FOR REJECTION. items or quantity change. 3. Right is reserved to accept or reject any or all bids in their entirety and 7.If you do not desire to bid,return sheets with reasons for declining. the bidders shall have the right to appeal any decision to the City Failure to do so will indicate your desire to be removed from our Council. Right is also reserved to accept or reject any part of your bid mailing list. If you desire a copy of tabulation check[ J. unless otherwise indicated by you. Please do not call for this information. Quote your lowest price, best delivery and terms,F.O.B. delivery point on the items(s)listed below: QUANTITY DESCRIPTION UNIT PRICE EXTENSION The Vendor will be required to provide all materials, labor and equipment to remove and replace various concrete panels along levee to the Missouri River Wastewater Treatment Plant in accordance with the attached specifications (13 pages). estimated 860 sq. yds. A. Remove pavement BID/sq. yd. $ /0, 00 X 860 sq. yds. $ c 600, 00 • 860 sq. yds. B. Place pavement . BID/sq. yd. $` i'J.O0 X 860 sq. yds. $ (5 goo. 00 • ALL OR NONE TOTAL BID $ 3 4/ Voo OCj (5% bid bond to be based upon this total) • All bidders awarded a contract in the amount of$5,000 or more must comply with the Contract Compliance Ordinance and have on file with the Human Relations Department the Annual Contract Compliance Report(Form CC-1).This report shall be in effect for 12 months from the date received by the Human Relations Department.Any questions regarding the Contract Compliance Ordinance should be directed to Contract Compliance Officers Rita Viademar at(402)444-5067 or Tony Acosta at(402)444.-5053;however,please refer any questions regarding the REQUEST FOR BID or SPECIFICATIONS directly to the Purchasing Department(402)444-5400 or as shown on bid. (Please Print Legibly for Type) T Payment Terms °,6 Firm i. (�. 7'� n.3 Pam 7 6/y� 1 Air✓6( Incorporated in u1r1 Delivery(or completion) Name Ke Ah A, Pe.e.e.o..di Signature Ca calendar days following award Title 13'oe-S/164 e" Phone 7b 3 ZP.-0/23 F - 90 r, Address/Oa .5b 7 7'43 T ?O/?B 671>A/ e /341.,16 Z' 5/,S• h.fl HP-8B (94) Street/P.O.Box City State Zip it fi1 , • tir CO 0 ov -1m Dy c < n WO o a) a a, � `" o Z c v0. r: -. CD C �- _ `G _ -D-i 00 D * * 7 II -, c, co R I O vm j Zm s o v o Oz 7 D -7 n %m m = Zvmv -� m D = m r D N O 2 0cn v v Cl) - -h 0 nm D 0 On � 0z -. (. - D gy C v �C r O 5.i K _ m n uO SD 0. Z D 0 0 C D O c�'i O o Z a IT! ,'� c Z z no 77 n o c rn O a 0 co co 0 m r .0 .n 0F W m 5 n. 0. o -..‹ N., \. ..)._ z ,,,--4-;7.,E=. om _,_ -.,7- ,,,..,„_, ,, , ,, tk, , ) ) 1 ,,, ,, , ,.., ,_ _GA ....: ,....., \,,, v r.,d)c, \-„ ,_,-, m4 ,„ _,_ ---,, ---,.,,,., 73 Z _ 4 \%, N,s, 5 :_-.1 tp 1 -o c -__77i Z Cali , I c..,,,, , 1 9 0: Lit H 13 ,._ 4 ,. ..,„...7, -.,- . , „. v -n ,.._ <--- itt 8 1 4 co co m 0 o o o —1 0 0 c , d D Eh m o n COv 3 p c5`§ << r: a Z r 0 • r a ua) a `< o z () > 7 m X =74, N CD m s 92. m Z `CD < 73`o° v o -p Q SD m =ti m = D m n n o Z CO '� -a S' < —1 m 3 o co o . O m = m CD = cn D O ( p 0 --I z o) r iii- ' _42 0 X Z. 2) o x vi 73 _ i1) -0 rnz D v o O / _ C D O 0 xi - v c`o O W CO _ • -a m m_ W M n a 0 ,,,,,,,,,b ; _,,z, 6. , k .,-,7,- \8 A , \. -0 X C .CF:yt:4 .Cf..) ...t li = Z ,.,, . 4 ,,,,, ,., ,, . ._ ,, k fN N k -, ik N,.,,, *A- ,,-‘ --- 7) zc . -N- -.,==. 4 , ,. , -D-- z C{,-1?z____-'-'S, 3, -a c 7 m "1:1c � z -0c 7z _ m =+ * 0 C-25A CITY OF OMAHA LEGISLATIVE CHAMBER Omaha,Nebr May 18, 19 99 RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, bids were received on April 21, 1999, for repairing concrete panels at the Missouri River Wastewater Treatment Plant.; and, WHEREAS, K. C. Petersen Construction Company, Inc., submitted a bid of $34,400.00, being the lowest and best bid received for repairing concrete panels at the Missouri River Wastewater Treatment Plant. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: V THAT,the bid of$34,400.00 from K. C. Petersen Construction Company, Inc., for repairing concrete panels at the Missouri River Wastewater Treatment Plant, a copy of the bid documents is attached and by this reference made a part hereof, being the lowest and best bid received, be accepted and the purchase order be issued. BE IT FURTHER RESOLVED: THAT, the Purchasing Agent be authorized to issue a purchase order to K. C. Petersen Construction Company, Inc., to repair concrete panels at the Missouri River Wastewater Treatment Plant. BE IT ALSO FURTHER RESOLVED: THAT, the Finance Department is authorized to pay the cost of repairing concrete panels at the Missouri River Wastewater Treatment Plant from the Missouri River Plant Maintenance Organization 1472, Sewer Revenue Fund 541. APPROVED AS TO FORM: P:\PW 1\7187.MAF f S IST CITY ATTORNEY DATE By 71*(4,416We/4_ Councilmember Adopted MAY 1 8 .1999 o-Q Claid4; ity Cler Approved ®; e `�e- � P i rupjil 8 17 J ' Op N �. p `C Z • -< cD Q��v1 0 t� r LA R (D 0 g L. gL 5 sv CJ 0 be 'IQ ET C:"\ ' 0 '-c-i: CD AD CT VD 0 • O r�� n UQ fi° .r N �• rb r CD �• CD CD C V, C �' CD co 0 CD ' CD 71 .- e r • • • • ,, I