Loading...
RES 2022-0863 - Change Order No. 3 with Hawkins Construction Company for OPW 53082 - Monroe Street Lift Station Improvements City Clerk Office Use Only: Publication Date (if pplic.ble): RESOLUTION NO. 2-122.27a5 �Q �Agenda Date: Department: 9ic_iiJDrkf Submitter: 1 I ir SG( CITY OF OMAHA LEGISLATIVE CHAMBER Omaha, Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, Hawkins Construction Company was awarded a contract by City Council Resolution No. 514 on May 18, 2021, to construct OPW 53082, being the Monroe Street Lift Station Improvements Project; and, WHEREAS, it is necessary to increase the contract to perform additional work listed in the attached Change Order No. 3, which by this reference is made a part hereof; and, WHEREAS, Hawkins Construction Company has agreed to perform this work for an additional cost of $494,125.00, which is to be paid from the Sewer Revenue Improvements Bond Fund 21124, CSO Control Implementation Organization 116918. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, Change Order No. 3 with Hawkins Construction Company for additional work on OPW 53082, being the Monroe Street Lift Station Improvements Project, is hereby approved. BE IT FURTHER RESOLVED: THAT, the Finance Department is authorized to pay an additional sum of $494,125.00, for this change order, from the Sewer Revenue Improvements Bond Fund 21124, CSO Control Implementation Organization 116918. 3158tns APPROVED AS TO FORM \rx--1.- CITY ATTORNEY DATE Adopted: SEP 13 Z02Z LQID Attest: y Clerk Approved: Mayor CONTRACT CHANGE ORDER City of Omaha Public Works Department Plant Maintenance& Engineering Division PROJECT NAME: DATE: 7/22/2022 Monroe Street Lift Station Improvements CHANGE ORDER#: 3 OPW 53082 PROJECT LOCATION: STP/P.O.#: - Missouri River WRRF BASE BID 24,391,157.00 CONTRACTOR: FUND: 21124 Hawkins Construction Company AGENCY: CSO ORG.: 116918 ORDINANCE/RES NO.: 2021-0815 DATE: 8/10/2021 NO. DESCRIPTION OF CHANGES DECREASE INCREASE CPR#015-Grit Removal Bridge Crane Clamshell:Hydraulic to 1 Dual Drum Cable Hoist $ 103,602.00 2 CPR#022-Additional MSLS Door Replacement/Repair $ 9,822.00 3 CPR#023-Bar Screen Replacement $ 380,701.00 SUB-TOTAL DECREASE IN CONTRACT PRICE 0.00 N/A SUB-TOTAL INCREASE IN CONTRACT PRICE N/A 494,125.00 NET DIFFERENCE 494,125.00 BASE BID PLUS PREVIOUS CHANGE ORDERS 24,642,629.50 REVISED CONTRACT PRICE 25,136,754.50 INCREASE/DECREASE 0 WORKING DAYS /JR- ; 7/29/22 ACCEPTED: /. DATE: Contractor APPROVED: DATE: 7/27/22 City Project Manger /* 8/2/22 APPROVED: DATE: Plant Engineering Manager signed bya Stem. 7/28/2022 Sarah A.Stewart: � A ;••acoM APPROVED: flie2022.OT.811:O991-0SW DATE: CDM Smith Project Manager Digitally signed 7/28/2022 APPROVED: Ken by Ken Rogers DATE: CDM Smith Constru :Manager Rogers 2022.07.28 12:09:37-05'00' MEMORANDUM OPW 53082 — Monroe Street Lift Station Improvements — Change Order #3 Executive Justification TO: Bob Stubbe FROM: Jake Hansen DATE: July 25, 2022 Purpose The purpose of this memorandum is to provide justification for the Change Order to OPW 53082. Project Overview During construction of the improvements at the Monroe Street Lift Station, City personal requested for a different bridge crane system than what was decided on during design. It was evaluated and decided to go with a dual drum cable crane instead of the self-contained hydraulic crane specified in the contract documents. Additionally,the existing doors and existing hardware were evaluated, and it was discovered that some doors onsite were damaged to a point of non-repair. It was discussed and decided to replace the damaged doors and hardware as a part of the improvements project.Also,the City decided to replace the bar screens instead of rebuilding them in place due to concerns from the City's operational personal. Change Order Costs $494,125.00 Project Construction Costs This change order increases the base bid plus previous change order of$24,642,629.50 by 2%. Recommendation I recommend proceeding with the Change Order for the following reasons: • The new bridge crane system will give the City personal the crane they requested and are trained in operating. • Replacing the damaged doors and doorframes will give the City a secure building to keep un-authorized people out of the building. • Replacing the bar screens will give the City all new equipment instead of rebuild components due to concerns of the condition of the current frame.