Loading...
RES 2022-0395 - Contract with Omni Engineering for OPW 54282 - 2022 Major Street Resurfacing City Clerk Office Use Only: (�-3q� Publication Date (if applica le): RESOLUTION NO. u1 L_'/n 7 Agenda Date: U� �()21 Department: IOr -S Submitter: 4 1 o f CITY OF OMAHA LEGISLATIVE CHAMBER Omaha, Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, bids were submitted on February 16, 2022, for OPW 54282, being the 2022 Major Street Resurfacing, Various Locations Project; and, WHEREAS, Oldcastle Materials Midwest Co. dba Omni Engineering, submitted a bid of $3,438,308.50, being the lowest and best bid received; and, WHEREAS, the cost of this project, shall be paid from the Street Allocation Fund 12131, Major Street Resurfacing Organization 116159, year 2022 expenditure. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, the contract with Oldcastle Materials Midwest Co. dba Omni Engineering, for OPW 54282, being the 2022 Major Street Resurfacing, Various Locations Project, is hereby approved. BE IT FURTHER RESOLVED: THAT, the Finance Department is authorized to pay the cost of $3,438,308.50, from the Street Allocation Fund 12131, Major Street Resurfacing Organization 116159, year 2022 expenditure. APPROVED AS TO FORM 3141 grp I2aY22 r>41,441:7 CITY ATTORNEY DATE "0 Adopted: )1 r LX Attest: City Clerk Approved: Mayor Bid Tabulation Report created and certified by General Services/Tim Storer Wednesday, February 16, 2022 Public Works Department Omaha, Nebraska OPW 54282 2022 Major Street Resurfacing, Various Locations 2 Bids Received on Wednesday, Feb 16, 2022 Engineer's Estimate: $4,093,666.60 Bid Summary(low to high bidder) 1 -Omni Engineering Low Bid Submitted: $3,438,308.50 Difference from Estimate: -$655,358.10 2 -Western Engineering Company, Inc $3,926,553.75 Difference from low: $488,245.25 Bid Tabulation February 16, 2022 Bid Tabulation Wednesday,February 16,2022 OPW 54282 2022 Major Street Resurfacing, Various Locations Public Works Department Base Bid Omaha, Nebraska 29 line items Bid Tablulatlon created by General Services/Tim Storer Engineer's Opinion of Probable Costs 1-Omni Engineering 2-Western Engineering Company,Inc $4,093,666.60 $3,438,308.50 $3,926,553.75 Bid Unit Price Difference Difference Item# Item Description Quantity UOM Unit Cost Total Cost Bid Total from Estimate Unit Price Bid Total from Estimate 1 0105.003 PERFORM 2"COLD PLANING-ASPHALT 155,135.00 SY $ 5.00. $ 775,675.00 $ 4.40 $ 682,594.00 $ (93,081.00) $ 6.50. $1,008,377.50 $ 232,702.50 2 0105.013 PERFORM 2"COLD PLANING-CONCRETE 1,000.00 SY $ 6.00 $ 6,000.00 $ 5.70 $ 5,700.00 $ (300.00) $ 7.50 $ 7,500.00 $ 1,500.00 3 0401.000 CONSTRUCT ASPHALT SURFACE COURSE, 11 810.00 TON $ 95.00. $1,121,950.00 $ 110.00 $1,299,100.00 $ 177,150.00 $ 113.75: $1,343,387.50 $ 221,437.50 TYPE SPR(PG64-34) 4 0401.004 CONSTRUCT ASPHALT SURFACE COURSE, 6,545.00 TON $ 100.00 $ 654.500.00 $• 114.00 $ 746,130.00 $ 91,630.00 $ 117.75 $ 770,673.75 $ 116,173.75 TYPE SPH(PG64-34) 5 0401.020 CONSTRUCT ASPHALT WEDGE COURSE, 100.00 TON $ 100.00. $ 10,000.00 $ 130.00. $ 13,000.00 $ 3,000.00 $ 130.00 $ 13,000.00 $ 3,000.00 TYPE SPR FINE(PG64-34) 6 0401.040 CONSTRUCT ASPHALTIC CONCRETE FOR 25.00 TON $ 145.00 $ 3,625.00 $ 180.00 $ 4,500.00 $ 875.00 $ 200.00 $ 5,000.00 $ 1,375.00 PAVEMENT REPAIR,TYPE SPR(PG64-34) 7 9000.007 CONSTRUCT CONCRETE BASE REPAIR 1,400.00 SY $ 90.00 $ 126,000.00 $ 79.20. $ 110,880.00 $ (15,120.00) $ 92.00 $ 128,800.00 $ 2,800.00 (TYPE L65) 8 1002.100 REPAIR CURB AND GUTTER 100.00 LF $ 37.50 $ 3,750.00 $ 26.40. $ 2,640.00 $ (1,110.00) $ 39.30 $ 3,930.00 $ 180.00 9 0501.004 CONSTRUCT 10-INCH CONCRETE • 50.00 SY $ 110.00 $ 5,500.00 $ 100.00 $ 5,000.00 $ (500.00) $ 106.00 $ 5,300.00 $ (200.00) PAVEMENT(TYPE L65) 10 0803.202 INSTALL ROLLED EROSION CONTROL, 100.00 BY $ 10.00 $ 1,000.00 $ 9.40 $ 940.00 $ (60.00) $ 2.85 $ 285.00 $ (715.00) TYPE I WITH SEEDING-TYPE B 11 0501.400 ADJUST UTILITY VALVE TO GRADE 89.00 EA $ 850.00 $ 75,650.00 $ 740.00. $ 65,860.00 $ (9,790.00) $ 800.00 $ 71,200.00 $ (4,450.00) 12 0501.450 ADJUST UTILITY MANHOLE TO GRADE 147.00 EA $ 900.00 $ 132,300.00 $ 740.00 $ 108,780.00 $ (23,520.00) $ 860.00 $ 126,420.00 $ (5,880.00) 13 0905.022 INSTALL TEMPORARY PAINT MARKING-5"WHITE 250.00 LF $ 5.00 $ 1,250.00 $ 3.65 $ 912.50 $ (337.50) $ 3.95 $ 987.50 $ (262.50) 14 0905.023 INSTALL TEMPORARY PAINT MARKING-5"YELLOW 500.00 LF $ 5.00 $ 2,500.00 $ 3.65 $ 1,825.00 $ (675.00) $ 3.95 $ 1,975.00 $ - (525.00) 15 0905.050 INSTALL PERMANENT PERFORMED TAPE 9,Y40.00 LF $ 8.50 $ 60,080.00 $ 4.35 $ 40,194.00 $ (19,868.00) $ 4.80 $ 44,352.00 $ (15,708.00) MARKING-TYPE 3,5"WHITE 16 0905.120 INSTALL MARKING-PETYPRMAE 3,NEN5"T PREFORMEDYELLOW TAPE 39,290.00 LF $ 6.54' $ 256,956.60 $ 4.35. $ 170,911.50 $ (86,045.10) $ 4.80 $ 188,592.00 $ (68,364.60) ii 17 9000.017 INSTALL PERMANENT PERFORMED TAPE 100.00 LF $ 20.00 $ 2,000.00 $ 825 $ 625.00 $ (1,375.00) $ 8.90 $ 690.00 $ (1,310.00) MARKING-TYPE 3,5"WHITE GROOVED 18 0905.032 INSTALL PERMANENT PAINT MARKING-5"WHITE 3,450.00 LF $ 5.00 $ 17,250.00 $ 0.98. $ 3,381.00 $ (13,869.001 $ 1.08• $ 3,726.00 $ (13,524.00) • 19 0906.101 FURNISH FLASHING ARROW PANEL 88.00 DAY $ 150.00: $ 13,200.00 $ 26.00- $ 2,288.00 $ (10,912.00) $ 100.00 $ 8,800.00 $ (4,400.00) 20 1002.307 ADJUST INLET TO GRADE 71.00 EA $ 1,000.00 $ 71,000.00 $ 845.00. $ 59,995.00 $ (11,005.00) $ 920.00 $ 65,320.00 $ (5,680.00) 21 9000.021 TOW NG 15.00 EA $ 275.00 $ 4,125.00 $ 259.00 $ 3,885.00 $ (240.00) .$ 350.00 $ 5,250.00 $ 1,125.00 22 8000.014 REMOVE ASPHALT SURFACE COURSE 25.00 SY $ 15.00. $ 375.00 $ 14.30. $ 357.50 $ (17.50) $ 27.50 $ 687.50 $ 312.50 23 6000.016 RECONSTRUCT INLET 2.00 EA $ 4,000.00 $ 8,000.00 $ 4,120.00 $ 8,240.00 $ 240.00 $ 4,600.00 $ 9,200.00 $ 1,200.00 24 8000.030 PROVIDE TEMPORARY TRAFFIC CONTROL- 13.00 EA $ 5,000.00. $ 65,000.00 $ 2,030.00. $ 26,390.00 $ (38,610.00) $ 2,250.00 $ 29,250.00 $ (35,750.00) PER SEGMENT 25 8000.040 RENTAL OF LOADER,FULLY OPERATED 100.00 HR $ 125.00. $ 12,500.00 $ 107.00. $ 10,700.00 $ (1,800.00) $ 95.00: $ 9,500.00 $ (3,000.00) O 28 8000.041 RENTALRATED OF SKID LOADER,FULLY 100.00 HR $ 75.00. $ 7,500.00 $ •69.00 $ 6,900.00 $ (600.00) $ 95.00. $ 9,500.00 $ 2,000.00 PE 27 8000.042 RENTAL OF DUMP TRUCK,FULLY OPERATED 100.00 HR $ 125.00 $ 12,500.00 $ 123.00 $ 12,300.00 $ (200.00) $ 95.00 $ 9,500.00 $ (3,000.00) 28 9000.028 SHOULDER CONSTRUCTION(RAP) 12,450.00 LF $ 30.00 $ 373,500.00 $ 2.40 $ 29,860.00 $ (343,620.00) $ 3.00 $ 37,350.00 $ (336,150.00) 29 9000.029 SHOULDER CONSTRUCTION(RAP) 6,000.00 LF $ 45.00 $ 270,000.00 $ 2.40 $ 14,400.00 $ (255,600.00) -$ 3.00 $ 18,000.00 $ (252,000.00) 1