RES 2022-0140 - Change Order No. 10 with Judds Bros for OPW 54039 - Fall Arrest System Phase I Project C-25A CITY OF OMAHA LEGISLATIVE CHAMBER Omaha,Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, Judds Bros. Construction Co. was awarded a contract by City Council Resolution No. 634 on June 15, 2021, to construct OPW 54039, being the Fall Arrest System Phase I Project, associated with Capital Improvement Program Project No. 1982E509; and, WHEREAS, it is necessary to increase the contract due to unforeseen conditions and revisions. The specific changes are listed in the attached Change Order No. 1, which by this reference is made a part hereof; and, WHEREAS, Judds Bros. Construction Co. has agreed to perform these services for a total additional cost of $30,362.26, which is to be paid from the Sewer Revenue Improvements Fund 21124, Neighborhood Sewer Renovation Organization 116911, year 2022 expenditure; Sewer Revenue Bonds will be issued to finance this project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, Change Order No. 1 with Judds Bros. Construction Co. for additional work on OPW 54039, being the Fall Arrest System Phase I Project, is hereby approved. BE IT FURTHER RESOLVED: THAT, the Finance Department is authorized to pay an additional sum of$30,362.26, for this change order, from the Sewer Revenue Improvements Fund 21124, Neighborhood Sewer Renovation Organization 116911, year 2022 expenditure; Sewer Revenue Bonds will be issued to finance this project. 3148tns APPROVED AS TO FORM: 12 04 g CITY ATTORNEY DA E By Councilmember Adopted FEB 15 /[ `1 -D City Clerk Approved. thAk_. Mayor • HA Pug ILIL COWORKSADEPARTRIENT CONTRACT CHANGE ORDER PROJECT NO.: OPW 54039 CHANGE ORDER NO.: 1 PROJECT NAME: Fall Arrest System Phase I CONTRACTOR: Judds Brothers COUNCIL RESOLUTION NO.: 2021-0634 DATE OF RESOLUTION: June 15,2021 LINE ITEM DESCRIPTION/REASON UNIT QUANTITY UNIT PRICE CONTRACT PRICE DECREASE INCREASE 111 1.1 Addition of Fall Arrest System for lift LS 1.00 $6,547.66 $6,547.66 station at 2305 N 15th Street Don Smith with the City of Omaha Flood Levee Control and Lift Stations Department requested this location be added.OK'd by Design Division. 112 1.2 Plowable fill at 72nd and Bedford LS 1.00 $6,169.75 $6,169.75 Encountered unstable soil conditions that would not allow for proposed drilled depth elevations without caving in and creating a larger void.Plowable fill was used to fill in collapsed void to allow redrilling of the foundations. 113 1.3 Flowable fill at Sunshine Ddve and LS 1.00 $1,600.21 $1,600.21 Harrison Street During pavement removal for foundations the contractor encountered undermining of existing pavement which was allowing sediment getting into the existing structure through the lift holes 114 1.4 Panel and curb replacement at 72nd and LS 1.00 $1,732.15 $1,732.15 Bedford Existing curb and gutter at the radius on Bedford was settled and holding wafer adjacent to one of the foundation locations 115 1.5 Concrete apron removal and LS 1.00 $4,475.31 $4,475.31 replacement at Adams Park Concrete apron constructed around existing structure was In conlictwith the stanchion supports. 116 1.6 Concrete pads on grade constructed LS 1.00 $8,066.34 $8,066.34 around the fall arrest foundations at 1421 Ames To change the foundation depths ixun 14 fool to 6 foot due to groundwater levels being shallow 117 1.7 Caulking of the expansion around LS 1.00 $1,770.84 $1,770.84 foundations at all locations Omission from foundation details Eliminate water from infiltrating joints TOTAL DECREASE IN CONTRACT PRICE $0.00 TOTAL INCREASE IN CONTRACT PRICE S30,362.26 NET DIFFERENCE $30,362.26 ESTIMATED CONTRACT VALUE $217,750.00 PREVIOUS CHANGE ORDER(S)VALUE S0.00 CURRENT CONTRACT AMOUNT $248,112.26 PERCENT CHANGE ORDER(S)TOTAL 13.9% NOTICE TO PROCEED DATE 7/12/2021 INITIAL DAYS TO SUBSTANTIAL COMPLETION 120 PREVIOUS CALENDAR DAYS ADDED 0 CALENDAR DAYS THIS CHANGE ORDER 0 CURRENT CONTRACT DAYS TO SUBSTANTIAL COMPLETION 120 CURRENT SUBSTANTIAL COMPLETION 11/8/2021 ACCEPTED: sin DATE: 1/5 /7.7`)Z Z CONT RECOMMENDED: DATE: /— T ''22 (CON UCT IOP AGE RECOMMENDED: DATE: / -p7Opl,Z (BIT E PR ENTA I APPROVED: �—�� DATE: f— t ( — 2.,. � ( NG JEER APPROVED: 1/41Crry Nfvy1 1.DATE: t a62 Y N E�7) APPROVED: DATE: z 2-- (PUBLIC WORKS DIRECTORI "••�°��• � 1 of 1