Loading...
RES 2006-0559 - Contract with American Asphalt Inc for OPW 50978, major street resurfacing • 01ANHA,NF i. `, '°1s� *- Public Works Department PM ' Omaha/Douglas Civic Center PM 11,4 _ ,� 2 1819 Famam Street,Suite 601 / , rL {V ,o May 23, 2006 ��1 =.z ._ w.. Omaha,Nebraska 68183-0601 � + , (402)444-5220 TFD FEBRV� �••�pp a �, f� u :#y,,;;�',t, Fax(402)444-5248 "�..�1"��i�lei rl, City of Omaha Robert G.Stubbe,P.E. Mike Fahey,Mayor Public Works Director Honorable President and Members of the City Council, The attached Resolution approves the contract with American Asphalt, Inc. for OPW 50978, being Major Street Resurfacing at Various Locations within the City. The following bids were received on April 19, 2006. A detailed bid tabulation is attached. Contractor Base Bid Evaluation Bid (A+B) U.S. Asphalt Co. $1,939,919.79 $2,527,919.79 American Asphalt, Inc. $1,980,844.50 $2,400,844.50 (Recommended Bid) Western Engineering Co., Inc. $2,182,491.85 $2,602,491.85 Bid evaluation and selection was based on the contractors' base bid (A) plus the product (B) of the calendar days to complete the work submitted by the contractor, and the calculated cost to the road user. The contractor has on file a current Annual Contract Compliance Report Form (CC-1). As is City policy, the Human Rights and Relations Director will review the contractor to ensure compliance with the Contract Compliance Ordinance. The Finance Department is authorized to pay the cost of OPW 50978 base bid, $1,980,844.50, plus a potential maximum incentive amount, $78,400.00, for a total of$2,059,244.50 to be paid from the Major Street Resurfacing Organization 116159, City Street Maintenance Fund 12129 in the amount of $1,697,327.50; from the Street and Highway Bond Organization 117111, 2006 Bond Issue #1 Fund 13182 in the amount of $187,417.00; and from the Special Assessments Organization 116168, Capital Special Assessment Fund 13573 in the amount of $174,500.00, year 2006 expenditures. ' Honorable President and Members of the City Council Page -2- The Public Works Department recommends the acceptance of the bid A+B bid from American Asphalt, Inc. in the amount of $2,400,844.50, being the lowest and best bid received, and requests your consideration and approval of this Resolution. Respectfully submitted, Referred to City Council for Consideration: r'O a9 S'''//- eq. R bert G. tubbe, E. Date Mayor's Office Date Public Works Director wr Approved as to Funding: Approved: Q, A 4d\all ilk&e(r 6-1/i/06 Carol A. Ebdon � Date Gail Kinsey T ompson, Director Date Finance Director Human Rights and Relations Department P:\PW1\6489sap.doc 4, Bid Tabulation Public Works Department Omaha, Nebraska Wednesday,April 19, 2006 Project Summary OPW 50978 English Yes Metric: No Description: MAJOR STREET RESURFACING AT VARIOUS LOCATIONS WITHIN THE CITY OF OMAHA Start Date: Completion Date: Labor Release Date: Field Book Number: Test Core Lengths: Council Resolution: Adoption Date: Percent Reserve Due: 10.0% Percent Complete: 0.0% Percent Time Used: 0.0% Engineer's Total: $2,596,215.00 Contract Total $0.00 Total Penalties: $0.00 Total Payments: $0.00 Contractor: Phone#: Fax#: Email address: Page 1 of 8, 4/19/2006 1:29:56 PM, Bid Tabulation, Generated by:general services for project OPW 50978 Accotint/Funding Summary Fund Org. Description Engineer Contract Penalties Payments 12129 116159 Major Street Resurfacing $699,910.00 $0.00 $0.00 $0.00 13175 116167 2000 Street&Highway Bond $1,896,305.00 $0.00 $0.00 $0.00 I $2,596,215.00 $0.00 $0.00 $0.00 Page 2 of 8, 4/19/2006 1:29:56 PM, Bid Tabulation, Generated by:general services for project OPW 50978 Bid Summary (low to high bidder) Contractor Engineer's Estimate: $2,596,215.00 Diff From Low: $656,295.21 U.S.ASPHALT CO. Bid: $1,939,919.79 14012 GILES RD. Diff From Low: $0.00 OMAHA NE 68138- AMERICAN ASPHALT,INC. Bid: $1,980,844.50 1101 Grace Street Diff From Low: $40,924.71 Omaha NE 68110-2559 WESTERN ENGINEERING CO.,INC. Bid: $2,182,491.85 PO Box 350 Diff From Low: $242,572.06 Harlan IA 51537- Number of Bids: 3 Low Bid: $1,939,919.79 High Bid: $2,182,491.85 Average Bid:: $2,034,418.71 Page 3 of 8, 4/19/2006 1:29:56 PM, Bid Tabulation, Generated by:general services for project OPW 50978 • . Type Line # Item# Description Quantity Price Total 1 303.000 COLD PLANING-ASPHALT Engineeer's Estimate 112965 @ $1.50 per SY $169,447.50 U.S.ASPHALT CO. $1.32 per SY $149,113.80 AMERICAN ASPHALT, INC. $1.20 per SY $135,558.00 WESTERN ENGINEERING CO., INC. $1.38 per SY $155,891.70 2 303.001 COLD PLANING-CONCRETE Engineeer's Estimate 14220 @ $1.75 per SY $24,885.00 U.S.ASPHALT CO. $1.49 per SY $21,187.80 AMERICAN ASPHALT, INC. $1.30 per SY $18,486.00 l WESTERN ENGINEERING CO., INC. $1.55 per SY $22,041.00 3 900.003 IN PLACE PULVERIZATION Engineeer's Estimate 42990 @ $5.00 per SY $214,950.00 U.S.ASPHALT CO. $2.26 per SY $97,157.40 AMERICAN ASPHALT, INC. $2.40 per SY $103,176.00 WESTERN ENGINEERING CO., INC. $1.37 per SY $58,896.30 4 106.002 REMOVE ASPHALT SURFACE COURSE Engineeer's Estimate 100 @ $8.00 per SY $800.00 U.S.ASPHALT CO. $5.68 per SY $568.00 AMERICAN ASPHALT, INC. $7.50 per SY $750.00 WESTERN ENGINEERING CO., INC. $5.00 per SY $500.00 v 5 104.001 EARTHWORK(EMBANKMENT) Engineeer's Estimate 30 @ $10.00 per CY $300.00 U.S.ASPHALT CO. $9.49 per CY $284.70 AMERICAN ASPHALT, INC. $75.00 per CY $2,250.00 WESTERN ENGINEERING CO., INC. $15.00 per CY $450.00 6 306.000 REPAIR CONCRETE CURB Engineeer's Estimate 5200 @ $20.00 per LF $104,000.00 U.S.ASPHALT CO. $15.90 per LF $82,680.00 AMERICAN ASPHALT, INC. $18.00 per LF $93,600.00 WESTERN ENGINEERING CO., INC. $17.00 per LF $88,400.00 7 900.007 REPAIR CONCRETE CURB/SAWCUT Engineeer's Estimate 820 @ $24.00 per LF $19,680.00 U.S.ASPHALT CO. $18.32 per LF $15,022.40 AMERICAN ASPHALT, INC. $25.00 per LF $20,500.00 WESTERN ENGINEERING CO., INC. $19.25 per LF $15,785.00 8 307.008 REPAIR CONCRETE DRIVEWAY Engineeer's Estimate 353 @ $40.00 per SY $14,120.00 U.S.ASPHALT CO. $32.90 per SY $11,613.70 AMERICAN ASPHALT, INC. $41.50 per SY $14,649.50 WESTERN ENGINEERING CO.,INC. $35.00 per SY $12,355.00 9 307.006 REPAIR 4"CONCRETE SIDEWALK Engineeer's Estimate 1990 @ $4.00 per SF $7,960.00 U.S.ASPHALT CO. $3.68 per SF $7,323.20 AMERICAN ASPHALT, INC. $3.25 per SF $6,467.50 WESTERN ENGINEERING CO., INC. $3.95 per SF $7,860.50 Page 4 of 8, 4/19/2006 1:29:57 PM, Bid Tabulation, Generated by:general services for project OPW 50978 Type Line# Item # Description Quantity Price Total 10 307.007 REPAIR 6"CONCRETE SIDEWALK Engineeer's Estimate 4100 @ $4.50 per SF $18,450.00 U.S.ASPHALT CO. $3.98 per SF $16,318.00 AMERICAN ASPHALT, INC. $4.00 per SF $16,400.00 WESTERN ENGINEERING CO., INC. $4.30 per SF $17,630.00 11 204.100 CONSTRUCT CONCRETE CURB RAMP Engineeer's Estimate 1550 @ $10.00 per SF $15,500.00 U.S.ASPHALT CO. $9.46 per SF $14,663.00 AMERICAN ASPHALT, INC. $7.25 per SF $11,237.50 WESTERN ENGINEERING CO., INC. $10.00 per SF $15,500.00 12 307.000 CONCRETE PAVEMENT REPAIR(LESS THAN 100 SQUARE YARDS) Engineeer's Estimate 285 @ $60.00 per SY $17,100.00 U.S.ASPHALT CO. $38.61 per SY $11,003.85 AMERICAN ASPHALT, INC. $62.50 per SY $17,812.50 WESTERN ENGINEERING CO., INC. $41.50 per SY $11,827.50 13 301.310 ASPHALTIC CONCRETE FOR PAVEMENT REPAIR-SMALL AREA Engineeer's Estimate 535 $60.00per TON 9 @ $32,100.00 U.S.ASPHALT CO. TON$54.32 per $29,061.20 AMERICAN ASPHALT, INC. $58.00 per TON $31,030.00 WESTERN ENGINEERING CO., INC. $65.00 per TON $34,775.00 14 900.014 CONSTRUCT ASPHALT LEVELING COURSE TYPE FMM Engineeer's Estimate 3041 @ $50.00 per TON $152,050.00 U.S.ASPHALT CO. $49.17 per TON $149,525.97 AMERICAN ASPHALT, INC. $55.00 per TON $167,255.00 WESTERN ENGINEERING CO.,INC. $53.10 per TON $161,477.10 15 301.602 CONSTRUCT ASPHALT SURFACE COURSE TYPE FMM, PG 70-28 Engineeer's Estimate 9305 @ $48.00 per TON $446,640.00 U.S.ASPHALT CO. $47.22 per TON $439,382.10 AMERICAN ASPHALT, INC. $47.00 per TON $437,335.00 WESTERN ENGINEERING CO., INC. $56.80 per TON $528,524.00 16 301.605 CONSTRUCT ASPHALT SURFACE COURSE TYPE CMM, PG 70-28 Engineeer's Estimate 11560 @ $48.00 per TON $554,880.00 U.S.ASPHALT CO. $45.41 per TON $524,939.60 AMERICAN ASPHALT, INC. $45.00 per TON $520,200.00 WESTERN ENGINEERING CO., INC. $56.25 per TON $650,250.00 17 900.017 CONSTRUCT RAP SURFACE COURSE(FOR SHOULDERING)TYPE CMR Engineeer's Estimate 580 @ $50.00 per TON $29,000.00 U.S.ASPHALT CO. $40.54 per TON $23,513.20 AMERICAN ASPHALT, INC. $40.00 per TON $23,200.00 WESTERN ENGINEERING CO., INC. $49.80 per TON $28,884.00 18 850.000 PLASTIC PAVEMENT MARKING-WHITE Engineeer's Estimate 11625 @ $3.50 per LF $40,687.50 U.S.ASPHALT CO. $1.95 per LF $22,668.75 AMERICAN ASPHALT, INC. $2.20 per LF $25,575.00 WESTERN ENGINEERING CO.,INC. $2.05 per LF $23,831.25 19 850.001 PLASTIC PAVEMENT MARKING-YELLOW Engineeer's Estimate 35150 @ $3.50 per LF $123,025.00 U.S.ASPHALT CO. $1.95 per LF $68,542.50 AMERICAN ASPHALT, INC. $2.15 per LF $75,572.50 WESTERN ENGINEERING CO., INC. $2.05 per LF $72,057.50 Page 5 of 8, 4/19/2006 1:29:57 PM, Bid Tabulation, Generated by:general services for project OPW 50978 Type Line# Item yp # Description Quantity Price Total 20 850.002 INSTALL(CITY FURNISHED)TRAFFIC SYMBOL Engineeer's Estimate 21 @ $60.00 EACH $1,260.00 U.S.ASPHALT CO. $25.00 EACH $525.00 AMERICAN ASPHALT, INC. $40.00 EACH $840.00 WESTERN ENGINEERING CO.,INC. $26.00 EACH $546.00 21 760.001 ADJUST MANHOLE RIM TO GRADE 22"DIAMETER OR LESS Engineeer's Estimate 50 @ $300.00 EACH $15,000.00 U.S.ASPHALT CO. $261.79 EACH $13,089.50 AMERICAN ASPHALT, INC. $275.00 EACH $13,750.00 WESTERN ENGINEERING CO., INC. $281.00 EACH $14,050.00 22 760.002 ADJUST MANHOLE RIM TO GRADE OVER 22"DIAMETER TO 28"DIAMETER Engineeer's Estimate 53 @ $375.00 EACH $19,875.00 U.S.ASPHALT CO. $264.71 EACH $14,029.63 AMERICAN ASPHALT, INC. $300.00 EACH $15,900.00 WESTERN ENGINEERING CO., INC. $285.00 EACH $15,105.00 23 760.003 ADJUST MANHOLE RIM TO GRADE OVER 28"DIAMETER Engineeer's Estimate 20 @ $425.00 EACH $8,500.00 U.S.ASPHALT CO. $321.46 EACH $6,429.20 AMERICAN ASPHALT,INC. $325.00 EACH $6,500.00 WESTERN ENGINEERING CO., INC. $340.00 EACH $6,800.00 24 900.024 ADJUST SEWER MANHOLE TO GRADE(REVISED STANDARD PLATE 2-10) Engineeer's Estimate 35 @ $475.00 EACH $16,625.00 U.S.ASPHALT CO. $319.21 EACH $11,172.35 AMERICAN ASPHALT, INC. $400.00 EACH $14,000.00 WESTERN ENGINEERING CO., INC. $340.00 EACH $11,900.00 25 760.009 ADJUST MANHOLE TO GRADE WITH ASPHALT CAP Engineeer's Estimate 7 @ $200.00 EACH $1,400.00 U.S.ASPHALT CO. $390.08 EACH $2,730.56 AMERICAN ASPHALT, INC. $250.00 EACH $1,750.00 WESTERN ENGINEERING CO., INC. $400.00 EACH $2,800.00 26 900.026 INSTALL CONCRETE MANHOLE RISER Engineeer's Estimate 3 @ $35.00 per VF $105.00 U.S.ASPHALT CO. $191.03 per VF $573.09 AMERICAN ASPHALT, INC. $100.00 per VF $300.00 WESTERN ENGINEERING CO., INC. $205.00 per VF $615.00 27 786.000 INSTALL NEW CURB COCK AND NEW CURB BOX Engineeer's Estimate 3 @ $450.00 EACH $1,350.00 U.S.ASPHALT CO. $500.00 EACH $1,500.00 AMERICAN ASPHALT, INC. $250.00 EACH $750.00 WESTERN ENGINEERING CO., INC. $300.00 EACH $900.00 28 760.005 ADJUST INLET TO GRADE Engineeer's Estimate 3 @ $575.00 EACH $1,725.00 U.S.ASPHALT CO. $282.80 EACH $848.40 AMERICAN ASPHALT, INC. $1,000.00 EACH $3,000.00 WESTERN ENGINEERING CO., INC. $300.00 EACH $900.00 29 418.000 REPAIR TYPE"A"INLET Engineeer's Estimate 3 @ $1,600.00 EACH $4,800.00 U.S.ASPHALT CO. $1,345.50 EACH $4,036.50 AMERICAN ASPHALT,INC. $1,500.00 EACH $4,500.00 WESTERN ENGINEERING CO., INC. $1,450.00 EACH $4,350.00 Page 6 of 8, 4/19/2006 1:29:57 PM, Bid Tabulation, Generated by:general services for project OPW 50978 Type tine# Item # Description Quantity Price Total 30 900.030 BARRICADING Engineeer's Estimate 20 @ $2,000.00 EACH $40,000.00 U.S.ASPHALT CO. $895.00 EACH $17,900.00 AMERICAN ASPHALT, INC. $1,100.00 EACH $22,000.00 WESTERN ENGINEERING CO., INC. $965.00 EACH $19,300.00 31 900.031 VEHICLE TOWING Engineeer's Estimate 20 @ $100.00 per HR $2,000.00 U.S.ASPHALT CO. $75.00 per HR $1,500.00 AMERICAN ASPHALT, INC. $100.00 per HR $2,000.00 WESTERN ENGINEERING CO.,INC. $100.00 per HR $2,000.00 32 900.032 EMERGENCY WORK-COLD PLANING ASPHALT Engineeer's Estimate 3000 @ $5.00 per SY $15,000.00 U.S.ASPHALT CO. $1.38 per SY $4,140.00 AMERICAN ASPHALT, INC. $2.00 per SY $6,000.00 WESTERN ENGINEERING CO., INC. $2.00 per SY $6,000.00 33 900.033 EMERGENCY WORK-COLD PLANING CONCRETE Engineeer's Estimate 2000 @ $6.00 per SY $12,000.00 U.S.ASPHALT CO. $1.57 per SY $3,140.00 AMERICAN ASPHALT, INC. $3.00 per SY $6,000.00 WESTERN ENGINEERING CO., INC. $2.30 per SY $4,600.00 34 900.034 EMERGENCY WORK-IN PLACE PULVERIZATION Engineeer's Estimate 1000 @ $5.00 per SY $5,000.00 U.S.ASPHALT CO. $3.04 per SY $3,040.00 AMERICAN ASPHALT, INC. $5.00 per SY $5,000.00 WESTERN ENGINEERING CO., INC. $2.00 per SY $2,000.00 35 900.035 EMERGENCY WORK-REMOVE BRICK SURFACE Engineeer's Estimate 100 @ $10.00 per SY $1,000.00 U.S.ASPHALT CO. $7.94 per SY $794.00 AMERICAN ASPHALT, INC. $40.00 per SY $4,000.00 WESTERN ENGINEERING CO., INC. $8.50 per SY $850.00 36 900.036 EMERGENCY WORK-CONCRETE PAVEMENT REPAIR Engineeer's Estimate 100 @ $125.00 per SY $12,500.00 U.S.ASPHALT CO. $41.79 per SY $4,179.00 AMERICAN ASPHALT, S HALT, INC. $75.00 per SY $7,500.00 WESTERN ENGINEERING CO., INC. $44.90 per SY $4,490.00 37 900.037 EMERGENCY WORK-CONSTRUCT ASPHALT LEVELING COARSE COURSE TYPE FMM Engineeer's Estimate 500 @ $150.00 per TON $75,000.00 U.S.ASPHALT CO. $52.57 per TON $26,285.00 AMERICAN ASPHALT, INC. $56.00 per TON $28,000.00 WESTERN ENGINEERING CO., INC. $56.10 per TON $28,050.00 38 900.038 EMERGENCY WORK-CONSTRUCT ASPHALT SURFACE COARSE TYPE FMM Engineeer's Estimate 1000 @ $150.00 per TON $150,000.00 U.S.ASPHALT CO. $52.20 per TON $52,200.00 AMERICAN ASPHALT, INC. $47.00 per TON $47,000.00 WESTERN ENGINEERING CO., INC. $59.80 per TON $59,800.00 39 900.039 EMERGENCY WORK-CONSTRUCT ASPHALT SURFACE COARSE TYPE CMC Engineeer's Estimate 500 @ $125.00 per TON $62,500.00 U.S.ASPHALT CO. $47.02 per TON $23,510.00 AMERICAN ASPHALT, INC. $40.00 per TON $20,000.00 WESTERN ENGINEERING CO., INC. $55.00 per TON $27,500.00 Page 7 of 8, 4/19/2006 1:29:57 PM, Bid Tabulation, Generated by:general services for project OPW 50978 Type Line # Item # Description Quantity Price Total 40 900.040 EMERGENCY WORK-CONSTRUCT ASPHALT SURFACE COARSE TYPE CMM Engineeer's Estimate 1000 @ $150.00 per TON $150,000.00 U.S.ASPHALT CO. $47.63 per TON $47,630.00 AMERICAN ASPHALT, INC. $45.00 per TON $45,000.00 WESTERN ENGINEERING CO., INC. $59.25 per TON $59,250.00 41 900.041 EMERGENCY WORK-MOBILIZATION(PER CREW) Engineeer's Estimate 3 @ $5,000.00 EACH $15,000.00 U.S.ASPHALT CO. $5,366.13 EACH $16,098.39 AMERICAN ASPHALT, INC. $2,000.00 EACH $6,000.00 WESTERN ENGINEERING CO., INC. $1,250.00 EACH $3,750.00 (LINES 1 Through 41 INCLUSIVE) Bid Tabulation, generated by general services on 4/19/2006 1:29:57 PM for project OPW 50978 CERTIFIED DATE: Lk—/6?-1.3,0 Page 8 of 8, 4/19/2006 1:29:57 PM, Bid Tabulation, Generated by:general services for project OPW 50978 to O )A 0 o Co ` . C) o •� To- v o co a) ^ O CND CV ci O C N ~ r- 'tY CD 0 e- N tA N C O M) to fA W M Q E x N m , y, (a a = ❑ t` a) o a) r— o r— ai o ai r O a- m Co +a a) O a) al M M,- i_ coN� � O Q7 In lA 69 t CDW to 69 a.- Z (1) (7 co Q N L C 5. N N O E fa O •❑ a- O ❑ O 0 0 in o u) 0 = , 0 C co 0 Defy co) co .0 F. 0 0 00o cov o I Q C) W IA 1 ra u tA 69 ra 2 Z 1 20 A `ma- m Q7O 0 co, 0 0 o o o ui o ui v) �o o N O N WQ F- N g at Z (N fA 69 0 U) Z N W W 0 ta in 0 T (_ Q) E U C C) ca at a) a r to o 5 N U co Y 15. C 0 a O CO .J a) m in a)) EO ° E O to 0 V 5, to U a YO -a 0 Co C CO coO Z o io c c p CV O 2 .2 N 1.- m - F- LC C W u N - U m0 � Q ¢ `ia o y U 0 Cs — dO cn F- O Y la C 0 O - m C a Z Cn 2 E cn cu m Ql 0 J ^ c CO .r _O > rn E 6 I-- E I Q Q- g 0 LL Q CU co Zia 0 c C-25A CITY OF OMAHA • LEGISLATIVE CHAMBER Omaha,Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, bids were submitted on April 19, 2006 for OPW 50978-,'being Major Street Resurfacing at Various Locations within the City; and, WHEREAS, American Asphalt, Inc. submitted an A+B bid of $2,400,844.50 being the lowest and best bid received for OPW 50978. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, the base bid of $1,980,844.50, plus the potential maximum incentive amount of$78,400.00 for a total of$2,059,244.50 from American Asphalt, Inc. for OPW 50978, being Major Street Resurfacing at Various Locations within the City, being the lowest and best bid received within the bid specifications,be accepted and the contract be awarded. BE IT FURTHER RESOLVED: THAT, as recommended by the Mayor, the contract with American Asphalt, Inc., for OPW 50978, being Major Street Resurfacing at Various Locations within the City in the amount of$2,059,244.50 is hereby approved; and that the Finance Department is authorized to pay the cost of OPW 50978 from the Major Street Resurfacing Organization 116159, City Street Maintenance Fund 12129 in the amount of $1,697,327.50; from the Street and Highway Bond Organization 117111, 2006 Bond Issue #1 Fund 13182 in the amount of$187,417.00; and from the Special Assessments Organization 116168, Capital Special Assessment Fund 13573 in the amount of$174,500.00, year 2006 expenditures. APPROVED AS TO FORM. CITY ATTORNEY DATE P:\PW 1\6490sap.doc B /0 :4 1%-pftyJ,��i(�a- Councilmember Adopted - *Y..2..3..2006.- 2- 0 City Clerk Approved dftle4d/ ‘54% Mayor • O N CAD c O� CI ' �' t•QOQ Ccl UrQ 0 Iv C D .0., O r v '.3 0 C C �r V" o 1) N J CD ed O 0 VR it Q' O CA po O - �. O N (4 C4 44ta, wCCDD 0 ° 0 0 ,'It. CO LAO itt . 5-• 0.„ N C � . ¢ - �.. ‘"' : _ ...! : nu ` O i fi SID e. `•t W 1--' O F--, CD �. >0 "'11• -4 '-t > Q• (� v N J O� �l CA O = to • C/) O\ «S co co ,(2' CD q r ,-y CD V, CD rr co "'' b4 V , 1