RES 2006-0758 - Contract with US Asphalt Co for OPW 51089, curb ramp construction l
f � HA,14'�4.0 `, 'P Public Works Department
'1 . Omaha/Douglas Civic Center
z (rC�J » e' July 11 , 2006 1819 Farriam Street,Suite 601
$ �:._ry Omaha,Nebraska 68183-0601
AoA L)FESR� (402)444-5220
r�� Fax(402)444-5248
City of Omaha Robert G.Stubbe,P.E.
Mike Fahey,Mayor Public Works Director
Honorable President
and Members of the City Council,
The attached Resolution approves the contract with U.S. Asphalt, Co. for OPW 51089, being
residential concrete curb ramp construction at.various locations within the City of Omaha.
The following bids were received on June 7,2006. A detailed bid tabulation is attached.
Contractor Base Bid A+B Bid
U.S. ASPHALT CO. $199,814.20 $274,814.20 (LOW BID)
Swain Construction, Inc. , $213,610.00 $276,610.70
• Tab Construction Co. ,` $349,460.40 $424,460.40
The A+B bid represents the contractor's base bid (A) plus the product of the calendar days to
complete the work, submitted by the contractor, and the calculated cost to the road user(B). The
A+B bid is used for comparative purposes to determine the most reasonable bid.
The contractor has on file a current Annual Contract Compliance Report Form (CC-1). As is
City policy, the Human Rights and Relations Director will review the contractor to ensure
compliance with the Contract Compliance Ordinance.
The Finance Department is authorized to pay the cost of OPW 51089 base bid, $199,814.20,plus
a potential maximum incentive amount, $9,000.00, for a total of$208,814.20 to be paid from the
Residential. Street Rehabilitation Organization 116161, City Street Maintenance Fund 12129,
2006 expenditures.
•
Mi '
EXPIRES
1 Additional Qopi $ 2O_O
1 � '•• . t_l' $16. 10
FOr NEB`‘‘ Notary Public i ounty,
v�A�� a of Nebraska
turday and Sunday
2. Camps: 9:00 a.m. to 4:00 p.m., Monday through Friday during June and
July.
y�
•
AU'• w - . . '
• 1 •.dTYD.•:•::.::RE:• . A.
; a sf P
'.:
• ARKIN
IA 1lW.OdIWETE axes ATO ourioL 21 YELLOW.SPACIAAAPOE:TEW.TRAFFlC . .
1.1 HBVFPAMVM.T►AVNO.INSTALL NTwOW a NMDR1PEIMBOLNOeTRPAA
• LIFTa
12 IEW CURS OJT AOCONCRETE APRON a UOEROROUO LIRREA(SW.COWER on,• .
WATERT Mee TO.STREK AS•REOURAD •
TO STIAK.T.STOOP.eE!FOOOATONPWL CONNECT TO ROST. INNS. VERIFY :
• LOCATIONS WOW PROPER usury°PAPAW. ASS.
14 r PO.!r-r ecomsTE FILED STEEL PPE
BCLL)VID. Se N r-f OIA o f-O•0. •
• • -
coNWEE FSLBO POST HOLE FOOTING RYP. cOPYRUJR TMA'
OF 4 ToS DOaDDE R APED TM QOOBMATION CdNTAIXIM KAY
NOT ess owauaaoa>rx O?ST _
• TS V IDfP VIs�COSTNG MANS NO p �0Ii5IIR Or mYII/D.COra.LY. •
• ET�Ym. Oo1It1<TC •
.•.... eniT.rDIY01G DM:WORE OR ';.i.::Nn•'
J
egislative Chambers, fOmaha/DouglasOmaha,
Civic cf›.'''t1.q0d;.. Cop S $ County,
_6
Center, 1819 Farnam Street, on July 25, .9/C•...„.,"„•, Q.
2006 at 2:00 p.m.
BUSTER BROWN, OF NEBRP $ 39.50
City Clerk Notary Publi o County,
7-14-06 _____ a e of Nebraska
..G.1!+ 't�.%'.. .'2^ ..9+'�a>•.� -u '.r s� +,x`s'c.x '_,'�"`�� � � _r' �.. .,
a,_ ._S .. _R`..,. �_•..wW�r~,�se�l..,�r �-'1.�8°ahrf rk.r.,.:_�s... .. ..i.v..._SI,•:�r.'t�.•e•.-ar..:?sua-�3��3 Yiak7:�k'a�,.:s::.. -2#i.e,�ia tT.e:-��e.t-c.�x..�C3'5���". 6
id subcontractor has
agreed to perform the subcontracting work 1. The Contractor shall submit periodic reports of
identified in the bid submitted by the Bidder. contracting with Protected and/or Disadvantaged
Business Enterprises in such form and manner and at
b. If Bidder fails to meet the goals set forth above, such time as prescribed by the City of Omaha (Exhibit
Good Faith Efforts Documentation must be "C" is currently required to be submitted within ten
submitted with bid. (10) calendar days following the end of each calendar
quarter,from the start of the project).
c. Also, prior to award of this contract, all Bidders
must submit Exhibit "B" Contractor Employment 2. The Contractor and subcontractors shall permit
Data Form with the bid. access to their books, records and accounts by
the Human Relations Director or a designated
d. The Bidder and any of its subcontractors that have representative for purpose of investigation to
been designated by the Bidder as PBE and/or DBE ascertain compliance with these specified
cipation subcontracted and telephone numbers of
in the contract work. In any case,Exhibits "A" and"B" PBE/DBE's that were contracted;
must be submitted with the bid. If the information so (2) A description of the information provided to
submitted indicates that the City of Omaha goals will PBE/DBE's regarding the plans and
not be met, the Bidder shall submit good faith efforts specifications for portions of the work to be
documentation with their bid. The evidence must show performed; and
to the City of Omaha's satisfaction that the bidder has (3) A detailed statement of the reasons why
in good faith made every reasonable effort in the City additional prospective agreements with
of Omaha's judgment, to meet such goals. If any
''-.-,4$''.4, •t:-'7•4re,77, ..,)-,'-.1 \•••,,,., • :
. 1 ,
• ir --.,,,-
, • „:„...,,,
s,•,:i ' 17,A -•04r.:,,W-...\\• '••••'•
p! --; \ , ,...1•,' .., ,t• ,.0'p .. , 5,:, t 1 ,,,..,, ..., ,,,,.
4-/' 1••• i•,-;•---- isr.s-)•‘•-,,,,,,,.•
; 4:'i \- I \ 4 1_ P*L'•• ,,•ii -%-,,
: ; ., i . . .. . -.:1,..I.,,.•,,L.,:„ ,, .
-, ,‘ • -'..... 0 .•
:-.-.
• ' \ ....,, A\
_
., • ,. -- ',.;.:-1,--- -
.• -.0.4-'4-
. ,. .v,--,-
..,...
.......,--- -.._..,.-.• • ,
--I
.,,
._„_,_
Honorable President
and Members of the City Council
Page 2
The Public Works Department recommends the acceptance of the bid A+B bid from U.S.
Asphalt, Inc. in the amount of$274,814.20, being the lowest and best bid received, and requests
your consideration and approval of this Resolution.
Respectfully submitted, Referred to City Council for Consideration:
-o6 — 3o—O4
obert G. tubbe, P.E. ate Mayor's Office/Title Date
ublic Works Director pur
Approved as to Funding: Approved:
6I jolt gad (o /d
Carol A. Ebdon Date Gail Kinsey Thom n /Da e
Finance Director Human Rights and elations Director
P:WW1\16478mafdoc
r,t‘,
Uk
O
, ..,‘
1 A k
l&s ..
yn
,
.4
r V 1
Co/aq fot,
Bid Tabulation
Public Works Department
Omaha, Nebraska
Wednesday, June 07, 2006
Project Summary
OPW 51089 English Yes
Metric: No
Description: Residential Concrete Curb Ramp Construction at various ares within the City of Omaha
Start Date: Completion Date:
Labor Release Date:
Field Book Number: Test Core Lengths:
Council Resolution: Adoption Date:
Percent Reserve Due: 10.0%
Percent Complete: 0.0% Percent Time Used: 0.0%
Engineer's Total: $222,985.00
Contract Total $0.00
Total Penalties: $0.00
Total Payments: $0.00
Contractor:
Phone#:
Fax#:
Email address:
Page 1 of 5, 6/7/2006 2:30:41 PM, Bid Tabulation, Generated by:general services for project OPW 51089
A k
l&s ..
yn
,
.4
r V 1
Co/aq fot,
'-Account/Funding Summary
Fund Org. Description Engineer Contract Penalties Payments
12129 116161 Residential Street Rehabilitation(RSR) $222,985.00 $0.00 $0.00 $0.00
$222,985.00 $0.00 $0.00 $0.00
Page 2 of 5, 6/7/2006 2:30:41 PM, Bid Tabulation, Generated by:general services for project OPW 51089
Lengths:
Council Resolution: Adoption Date:
Percent Reserve Due: 10.0%
Percent Complete: 0.0% Percent Time Used: 0.0%
Engineer's Total: $222,985.00
Contract Total $0.00
Total Penalties: $0.00
Total Payments: $0.00
Contractor:
Phone#:
Fax#:
Email address:
Page 1 of 5, 6/7/2006 2:30:41 PM, Bid Tabulation, Generated by:general services for project OPW 51089
A k
l&s ..
yn
,
.4
r V 1
Co/aq fot,
'-Bid Summary(low to high bidder)
Contractor
Engineer's Estimate: $222,985.00
Diff From Low: $23,170.80
U.S.ASPHALT CO. Bid: $199,814.20
14012 GILES RD. Diff From Low: $0.00
OMAHA NE 68138-
SWAIN CONSTRUCTION,INC. Bid: $213,610.70
6002 N.89 Circle Diff From Low: $13,796.50
OMAHA NE 68134-
TAB Construction Company Bid: $349,460.40
4153 S.67 St. Diff From Low: $149,646.20
Omaha NE 68117-
Number of Bids: 3
Low Bid: $199,814.20
High Bid: $349,460.40
Average Bid:: $254,295.10
•
•
Page 3 of 5, 6/7/2006 2:30:41 PM, Bid Tabulation, Generated by:general services for project OPW 51089
yn
,
.4
r V 1
Co/aq fot,
Type Line# Item # Description Quantity Price Total
1 307.006 REPAIR 4"CONCRETE SIDEWALK
Engineeer's Estimate 14700 @ $3.50 per SF $51,450.00
U.S.ASPHALT CO. $2.85 per SF $41,895.00
SWAIN CONSTRUCTION, INC. $4.10 per SF $60,270.00
TAB Construction Company $8.50 per SF $124,950.00
2 301.350 ASPHALTIC CONCRETE FOR PAVEMENT REPAIR-SMALL AREA,TYPE CMC,PG 70-28
Engineeer's Estimate 34 @ $90.00 per TON $3,060.00
U.S.ASPHALT CO. $125.00 per TON $4,250.00
SWAIN CONSTRUCTION, INC. $121.00 per TON $4,114.00
TAB Construction Company $230.20 per TON $7,826.80
3 306.000 REPAIR CONCRETE CURB
Engineeer's Estimate 2480 @ $20.00 per LF $49,600.00
U.S.ASPHALT CO. $27.80 per LF $68,944.00
SWAIN CONSTRUCTION, INC. $20.00 per LF $49,600.00
TAB Construction Company $20.92 per LF $51,881.60
4 307.013 CONCRETE PAVEMENT REPAIR-TYPE L85
Engineeer's Estimate 550 @ $60.00 per SY $33,000.00
U.S.ASPHALT CO. $44.44 per SY $24,442.00
SWAIN CONSTRUCTION, INC. $44.59 per SY $24,524.50
TAB Construction Company $64.05 per SY $35,227.50
5 760.001 ADJUST MANHOLE RIM TO GRADE 22"DIAMETER OR LESS
Engineeer's Estimate 5 @ $275.00 EACH $1,375.00
U.S.ASPHALT CO. $325.00 EACH $1,625.00
SWAIN CONSTRUCTION, INC. $255.00 EACH $1,275.00
TAB Construction Company $624.50 EACH $3,122.50
6 760.002 ADJUST MANHOLE RIM TO GRADE OVER 22"DIAMETER TO 28"DIAMETER
Engineeer's Estimate 5 @ $325.00 EACH $1,625.00
U.S.ASPHALT CO. $325.00 EACH $1,625.00
SWAIN CONSTRUCTION, INC. $285.00 EACH $1,425.00
TAB Construction Company $660.40 EACH $3,302.00
7 760.003 ADJUST MANHOLE RIM TO GRADE OVER 28"DIAMETER
Engineeer's Estimate 1 @ $375.00 EACH $375.00
U.S.ASPHALT CO. $325.00 EACH $325.00
SWAIN CONSTRUCTION, INC. $252.00 EACH $252.00
TAB Construction Company $660.00 EACH $660.00
8 204.100 CONSTRUCT CONCRETE CURB RAMP
Engineeer's Estimate 7980 @ $10.00 per SF $79,800.00
U.S.ASPHALT CO. $5.59 per SF $44,608.20
SWAIN CONSTRUCTION, INC. $7.99 per SF $63,760.20
TAB Construction Company $13.60 per SF $108,528.00
9 900.009 ADJUST MANHOLE(PER STANDARD PLATE 2-10)
Engineeer's Estimate 2 @ $450.00 EACH $900.00
U.S.ASPHALT CO. $400.00 EACH $800.00
SWAIN CONSTRUCTION, INC. $365.00 EACH $730.00
TAB Construction Company $656.00 EACH $1,312.00
Page 4 of 5, 6/7/2006 2:30:41 PM, Bid Tabulation, Generated by:general services for project OPW 51089
IM KAY
NOT ess owauaaoa>rx O?ST _
• TS V IDfP VIs�COSTNG MANS NO p �0Ii5IIR Or mYII/D.COra.LY. •
• ET�Ym. Oo1It1<TC •
.•.... eniT.rDIY01G DM:WORE OR ';.i.::Nn•'
J
egislative Chambers, fOmaha/DouglasOmaha,
Civic cf›.'''t1.q0d;.. Cop S $ County,
_6
Center, 1819 Farnam Street, on July 25, .9/C•...„.,"„•, Q.
2006 at 2:00 p.m.
BUSTER BROWN, OF NEBRP $ 39.50
City Clerk Notary Publi o County,
7-14-06 _____ a e of Nebraska
..G.1!+ 't�.%'.. .'2^ ..9+'�a>•.� -u '.r s� +,x`s'c.x '_,'�"`�� � � _r' �.. .,
a,_ ._S .. _R`..,. �_•..wW�r~,�se�l..,�r �-'1.�8°ahrf rk.r.,.:_�s... .. ..i.v..._SI,•:�r.'t�.•e•.-ar..:?sua-�3��3 Yiak7:�k'a�,.:s::.. -2#i.e,�ia tT.e:-��e.t-c.�x..�C3'5���". 6
id subcontractor has
agreed to perform the subcontracting work 1. The Contractor shall submit periodic reports of
identified in the bid submitted by the Bidder. contracting with Protected and/or Disadvantaged
Business Enterprises in such form and manner and at
b. If Bidder fails to meet the goals set forth above, such time as prescribed by the City of Omaha (Exhibit
Good Faith Efforts Documentation must be "C" is currently required to be submitted within ten
submitted with bid. (10) calendar days following the end of each calendar
quarter,from the start of the project).
c. Also, prior to award of this contract, all Bidders
must submit Exhibit "B" Contractor Employment 2. The Contractor and subcontractors shall permit
Data Form with the bid. access to their books, records and accounts by
the Human Relations Director or a designated
d. The Bidder and any of its subcontractors that have representative for purpose of investigation to
been designated by the Bidder as PBE and/or DBE ascertain compliance with these specified
cipation subcontracted and telephone numbers of
in the contract work. In any case,Exhibits "A" and"B" PBE/DBE's that were contracted;
must be submitted with the bid. If the information so (2) A description of the information provided to
submitted indicates that the City of Omaha goals will PBE/DBE's regarding the plans and
not be met, the Bidder shall submit good faith efforts specifications for portions of the work to be
documentation with their bid. The evidence must show performed; and
to the City of Omaha's satisfaction that the bidder has (3) A detailed statement of the reasons why
in good faith made every reasonable effort in the City additional prospective agreements with
of Omaha's judgment, to meet such goals. If any
''-.-,4$''.4, •t:-'7•4re,77, ..,)-,'-.1 \•••,,,., • :
. 1 ,
• ir --.,,,-
, • „:„...,,,
s,•,:i ' 17,A -•04r.:,,W-...\\• '••••'•
p! --; \ , ,...1•,' .., ,t• ,.0'p .. , 5,:, t 1 ,,,..,, ..., ,,,,.
4-/' 1••• i•,-;•---- isr.s-)•‘•-,,,,,,,.•
; 4:'i \- I \ 4 1_ P*L'•• ,,•ii -%-,,
: ; ., i . . .. . -.:1,..I.,,.•,,L.,:„ ,, .
-, ,‘ • -'..... 0 .•
:-.-.
• ' \ ....,, A\
_
., • ,. -- ',.;.:-1,--- -
.• -.0.4-'4-
. ,. .v,--,-
..,...
.......,--- -.._..,.-.• • ,
--I
.,,
._„_,_
•
Type Line# Item # Description Quantity Price Total
10 900.010 TOWING VEHICLES FROM STREET
Engineeer's Estimate 3 @ $100.00 per HR $300.00
U.S.ASPHALT CO. $100.00 per HR $300.00
SWAIN CONSTRUCTION, INC. $90.00 per HR $270.00
TAB Construction Company $200.00 per HR $600.00
11 900.011 CONSTRUCT CONCRETE CURB WALL
Engineeer's Estimate 10 @ $50.00 per CY $500.00
U.S.ASPHALT CO. $500.00 per CY $5,000.00
SWAIN CONSTRUCTION, INC. $351.00 per CY $3,510.00
TAB Construction Company $550.00 per CY $5,500.00
12 700.001 CONSTRUCT REINFORCED CONCRETE CURB WALL
Engineeer's Estimate 10 @ $100.00 per CY $1,000.00
U.S.ASPHALT CO. $600.00 per CY $6,000.00
SWAIN CONSTRUCTION, INC. $388.00 per CY $3,880.00
TAB Construction Company $655.00 per CY $6,550.00
(LINES 1 Through 12 INCLUSIVE)
Bid Tabulation, g ne ed by general services on 6/7/2006 2:30:41 PM for project OPW 51089
•
CERTIFIED B • DATE: 4-
Page 5 of 5, 6/7/2006 2:30:41 PM, Bid Tabulation, Generated by:general services for project OPW 51089
$64.05 per SY $35,227.50
5 760.001 ADJUST MANHOLE RIM TO GRADE 22"DIAMETER OR LESS
Engineeer's Estimate 5 @ $275.00 EACH $1,375.00
U.S.ASPHALT CO. $325.00 EACH $1,625.00
SWAIN CONSTRUCTION, INC. $255.00 EACH $1,275.00
TAB Construction Company $624.50 EACH $3,122.50
6 760.002 ADJUST MANHOLE RIM TO GRADE OVER 22"DIAMETER TO 28"DIAMETER
Engineeer's Estimate 5 @ $325.00 EACH $1,625.00
U.S.ASPHALT CO. $325.00 EACH $1,625.00
SWAIN CONSTRUCTION, INC. $285.00 EACH $1,425.00
TAB Construction Company $660.40 EACH $3,302.00
7 760.003 ADJUST MANHOLE RIM TO GRADE OVER 28"DIAMETER
Engineeer's Estimate 1 @ $375.00 EACH $375.00
U.S.ASPHALT CO. $325.00 EACH $325.00
SWAIN CONSTRUCTION, INC. $252.00 EACH $252.00
TAB Construction Company $660.00 EACH $660.00
8 204.100 CONSTRUCT CONCRETE CURB RAMP
Engineeer's Estimate 7980 @ $10.00 per SF $79,800.00
U.S.ASPHALT CO. $5.59 per SF $44,608.20
SWAIN CONSTRUCTION, INC. $7.99 per SF $63,760.20
TAB Construction Company $13.60 per SF $108,528.00
9 900.009 ADJUST MANHOLE(PER STANDARD PLATE 2-10)
Engineeer's Estimate 2 @ $450.00 EACH $900.00
U.S.ASPHALT CO. $400.00 EACH $800.00
SWAIN CONSTRUCTION, INC. $365.00 EACH $730.00
TAB Construction Company $656.00 EACH $1,312.00
Page 4 of 5, 6/7/2006 2:30:41 PM, Bid Tabulation, Generated by:general services for project OPW 51089
IM KAY
NOT ess owauaaoa>rx O?ST _
• TS V IDfP VIs�COSTNG MANS NO p �0Ii5IIR Or mYII/D.COra.LY. •
• ET�Ym. Oo1It1<TC •
.•.... eniT.rDIY01G DM:WORE OR ';.i.::Nn•'
J
egislative Chambers, fOmaha/DouglasOmaha,
Civic cf›.'''t1.q0d;.. Cop S $ County,
_6
Center, 1819 Farnam Street, on July 25, .9/C•...„.,"„•, Q.
2006 at 2:00 p.m.
BUSTER BROWN, OF NEBRP $ 39.50
City Clerk Notary Publi o County,
7-14-06 _____ a e of Nebraska
..G.1!+ 't�.%'.. .'2^ ..9+'�a>•.� -u '.r s� +,x`s'c.x '_,'�"`�� � � _r' �.. .,
a,_ ._S .. _R`..,. �_•..wW�r~,�se�l..,�r �-'1.�8°ahrf rk.r.,.:_�s... .. ..i.v..._SI,•:�r.'t�.•e•.-ar..:?sua-�3��3 Yiak7:�k'a�,.:s::.. -2#i.e,�ia tT.e:-��e.t-c.�x..�C3'5���". 6
id subcontractor has
agreed to perform the subcontracting work 1. The Contractor shall submit periodic reports of
identified in the bid submitted by the Bidder. contracting with Protected and/or Disadvantaged
Business Enterprises in such form and manner and at
b. If Bidder fails to meet the goals set forth above, such time as prescribed by the City of Omaha (Exhibit
Good Faith Efforts Documentation must be "C" is currently required to be submitted within ten
submitted with bid. (10) calendar days following the end of each calendar
quarter,from the start of the project).
c. Also, prior to award of this contract, all Bidders
must submit Exhibit "B" Contractor Employment 2. The Contractor and subcontractors shall permit
Data Form with the bid. access to their books, records and accounts by
the Human Relations Director or a designated
d. The Bidder and any of its subcontractors that have representative for purpose of investigation to
been designated by the Bidder as PBE and/or DBE ascertain compliance with these specified
cipation subcontracted and telephone numbers of
in the contract work. In any case,Exhibits "A" and"B" PBE/DBE's that were contracted;
must be submitted with the bid. If the information so (2) A description of the information provided to
submitted indicates that the City of Omaha goals will PBE/DBE's regarding the plans and
not be met, the Bidder shall submit good faith efforts specifications for portions of the work to be
documentation with their bid. The evidence must show performed; and
to the City of Omaha's satisfaction that the bidder has (3) A detailed statement of the reasons why
in good faith made every reasonable effort in the City additional prospective agreements with
of Omaha's judgment, to meet such goals. If any
''-.-,4$''.4, •t:-'7•4re,77, ..,)-,'-.1 \•••,,,., • :
. 1 ,
• ir --.,,,-
, • „:„...,,,
s,•,:i ' 17,A -•04r.:,,W-...\\• '••••'•
p! --; \ , ,...1•,' .., ,t• ,.0'p .. , 5,:, t 1 ,,,..,, ..., ,,,,.
4-/' 1••• i•,-;•---- isr.s-)•‘•-,,,,,,,.•
; 4:'i \- I \ 4 1_ P*L'•• ,,•ii -%-,,
: ; ., i . . .. . -.:1,..I.,,.•,,L.,:„ ,, .
-, ,‘ • -'..... 0 .•
:-.-.
• ' \ ....,, A\
_
., • ,. -- ',.;.:-1,--- -
.• -.0.4-'4-
. ,. .v,--,-
..,...
.......,--- -.._..,.-.• • ,
--I
.,,
._„_,_
1
•
N 0 0 0
v o 'Cr
0 0 0
CO 0 co
1 v_ o v_
d p a) ui v
O .L. r I... M
U N W to w
r
h^ W
C CO Z
O •vU) t
m CI RS n E am co
I-- v0
O O 0
O 0 i
0 0 0
0
• m NI. co 0 co
C , ) O M M <O
coI c t0 h
• 0 w
W
CO
0coZ
()
CZ =
ciN to I
o E CO co up 0 0
• CO
0 CO CI w
.. ~00 OS � N
R N W 4!A
.0 CDC.= Z
o
Q N .0
ui E, E c N
r0
0 0 0
CO 0
It) 0 cA
to co
m a 0 a)
f-
.0N )n hrn
W I... N t� CO
Q N •
N
W ya
Z_ —
Z W
W
CC N
I 0
US
C CO
0)
E c`o
•N N
(C
ct- O
o F
V) >
Y —
O fC
C
O_
o •.Q V Y
3 3
d N
Lc a)
a)c0 O a)
E
°. E
E o
o co
U ..
e $ -o
a, r.
3 CD CD
Zo y16co00 .0C
O E ,— N N , C)
F- cn E O v N p to on
N � " a
a C O N A C C) `y
m0V = -)) c�,eC' o
(� 0 0
H o 1° m c LS 0 0 `°
0 Z c w o) N C c m
`d J
o
CT3 dO E toQ°' co c o m . L > N Ew
§
Q � tx 3 tiQm m Zcoo 0)-- v°
$285.00 EACH $1,425.00
TAB Construction Company $660.40 EACH $3,302.00
7 760.003 ADJUST MANHOLE RIM TO GRADE OVER 28"DIAMETER
Engineeer's Estimate 1 @ $375.00 EACH $375.00
U.S.ASPHALT CO. $325.00 EACH $325.00
SWAIN CONSTRUCTION, INC. $252.00 EACH $252.00
TAB Construction Company $660.00 EACH $660.00
8 204.100 CONSTRUCT CONCRETE CURB RAMP
Engineeer's Estimate 7980 @ $10.00 per SF $79,800.00
U.S.ASPHALT CO. $5.59 per SF $44,608.20
SWAIN CONSTRUCTION, INC. $7.99 per SF $63,760.20
TAB Construction Company $13.60 per SF $108,528.00
9 900.009 ADJUST MANHOLE(PER STANDARD PLATE 2-10)
Engineeer's Estimate 2 @ $450.00 EACH $900.00
U.S.ASPHALT CO. $400.00 EACH $800.00
SWAIN CONSTRUCTION, INC. $365.00 EACH $730.00
TAB Construction Company $656.00 EACH $1,312.00
Page 4 of 5, 6/7/2006 2:30:41 PM, Bid Tabulation, Generated by:general services for project OPW 51089
IM KAY
NOT ess owauaaoa>rx O?ST _
• TS V IDfP VIs�COSTNG MANS NO p �0Ii5IIR Or mYII/D.COra.LY. •
• ET�Ym. Oo1It1<TC •
.•.... eniT.rDIY01G DM:WORE OR ';.i.::Nn•'
J
egislative Chambers, fOmaha/DouglasOmaha,
Civic cf›.'''t1.q0d;.. Cop S $ County,
_6
Center, 1819 Farnam Street, on July 25, .9/C•...„.,"„•, Q.
2006 at 2:00 p.m.
BUSTER BROWN, OF NEBRP $ 39.50
City Clerk Notary Publi o County,
7-14-06 _____ a e of Nebraska
..G.1!+ 't�.%'.. .'2^ ..9+'�a>•.� -u '.r s� +,x`s'c.x '_,'�"`�� � � _r' �.. .,
a,_ ._S .. _R`..,. �_•..wW�r~,�se�l..,�r �-'1.�8°ahrf rk.r.,.:_�s... .. ..i.v..._SI,•:�r.'t�.•e•.-ar..:?sua-�3��3 Yiak7:�k'a�,.:s::.. -2#i.e,�ia tT.e:-��e.t-c.�x..�C3'5���". 6
id subcontractor has
agreed to perform the subcontracting work 1. The Contractor shall submit periodic reports of
identified in the bid submitted by the Bidder. contracting with Protected and/or Disadvantaged
Business Enterprises in such form and manner and at
b. If Bidder fails to meet the goals set forth above, such time as prescribed by the City of Omaha (Exhibit
Good Faith Efforts Documentation must be "C" is currently required to be submitted within ten
submitted with bid. (10) calendar days following the end of each calendar
quarter,from the start of the project).
c. Also, prior to award of this contract, all Bidders
must submit Exhibit "B" Contractor Employment 2. The Contractor and subcontractors shall permit
Data Form with the bid. access to their books, records and accounts by
the Human Relations Director or a designated
d. The Bidder and any of its subcontractors that have representative for purpose of investigation to
been designated by the Bidder as PBE and/or DBE ascertain compliance with these specified
cipation subcontracted and telephone numbers of
in the contract work. In any case,Exhibits "A" and"B" PBE/DBE's that were contracted;
must be submitted with the bid. If the information so (2) A description of the information provided to
submitted indicates that the City of Omaha goals will PBE/DBE's regarding the plans and
not be met, the Bidder shall submit good faith efforts specifications for portions of the work to be
documentation with their bid. The evidence must show performed; and
to the City of Omaha's satisfaction that the bidder has (3) A detailed statement of the reasons why
in good faith made every reasonable effort in the City additional prospective agreements with
of Omaha's judgment, to meet such goals. If any
''-.-,4$''.4, •t:-'7•4re,77, ..,)-,'-.1 \•••,,,., • :
. 1 ,
• ir --.,,,-
, • „:„...,,,
s,•,:i ' 17,A -•04r.:,,W-...\\• '••••'•
p! --; \ , ,...1•,' .., ,t• ,.0'p .. , 5,:, t 1 ,,,..,, ..., ,,,,.
4-/' 1••• i•,-;•---- isr.s-)•‘•-,,,,,,,.•
; 4:'i \- I \ 4 1_ P*L'•• ,,•ii -%-,,
: ; ., i . . .. . -.:1,..I.,,.•,,L.,:„ ,, .
-, ,‘ • -'..... 0 .•
:-.-.
• ' \ ....,, A\
_
., • ,. -- ',.;.:-1,--- -
.• -.0.4-'4-
. ,. .v,--,-
..,...
.......,--- -.._..,.-.• • ,
--I
.,,
._„_,_
C-25A CITY OF OMAHA
. LEGISLATIVE CHAMBER
Omaha,Nebraska
RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: .
WHEREAS, bids were submitted on June 7, 2006 for OPW 51089, being
residential concrete curb ramp construction at various locations within the City of Omaha; and,
WHEREAS, U.S. Asphalt Co. submitted an A+B bid of $274,814.20 being the
lowest and best bid received for OPW 51089.
NOW, THEREFORE, BE TT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF OMAHA:
THAT, the base bid of $199,814.20, plus the potential maximum incentive
amount of $9,000.00 for a total of $208,814.20 from U.S. Asphalt Co. for OPW 51089, being
residential concrete curb ramp construction at various locations within the City of Omaha, being
the lowest and best bid received within the bid specifications, be accepted and the contract be
awarded.
BE IT FURTHER RESOLVED:
THAT, as recommended by the Mayor, the contract with U.S. Asphalt Co., for
OPW 51089, being residential concrete curb ramp construction at various locations within the
City of Omaha in the amount of $208,814.20 is hereby approved; and that the Finance
Department is authorized to pay the cost of OPW 51089 from the Residential Street
Rehabilitation Organization 116161, City Street Maintenance Fund 12129, 2006 expenditures.
APPROVED AS TO FORM:
CITY ATTORNEY DATE
P:\PW 1\16479ma£doc
By
ouncilmember
Adopted r 1 2006 / r®
4
City Cler
7�Yd�
Approved = _
-- .- . Mayor
1° m c LS 0 0 `°
0 Z c w o) N C c m
`d J
o
CT3 dO E toQ°' co c o m . L > N Ew
§
Q � tx 3 tiQm m Zcoo 0)-- v°
$285.00 EACH $1,425.00
TAB Construction Company $660.40 EACH $3,302.00
7 760.003 ADJUST MANHOLE RIM TO GRADE OVER 28"DIAMETER
Engineeer's Estimate 1 @ $375.00 EACH $375.00
U.S.ASPHALT CO. $325.00 EACH $325.00
SWAIN CONSTRUCTION, INC. $252.00 EACH $252.00
TAB Construction Company $660.00 EACH $660.00
8 204.100 CONSTRUCT CONCRETE CURB RAMP
Engineeer's Estimate 7980 @ $10.00 per SF $79,800.00
U.S.ASPHALT CO. $5.59 per SF $44,608.20
SWAIN CONSTRUCTION, INC. $7.99 per SF $63,760.20
TAB Construction Company $13.60 per SF $108,528.00
9 900.009 ADJUST MANHOLE(PER STANDARD PLATE 2-10)
Engineeer's Estimate 2 @ $450.00 EACH $900.00
U.S.ASPHALT CO. $400.00 EACH $800.00
SWAIN CONSTRUCTION, INC. $365.00 EACH $730.00
TAB Construction Company $656.00 EACH $1,312.00
Page 4 of 5, 6/7/2006 2:30:41 PM, Bid Tabulation, Generated by:general services for project OPW 51089
IM KAY
NOT ess owauaaoa>rx O?ST _
• TS V IDfP VIs�COSTNG MANS NO p �0Ii5IIR Or mYII/D.COra.LY. •
• ET�Ym. Oo1It1<TC •
.•.... eniT.rDIY01G DM:WORE OR ';.i.::Nn•'
J
egislative Chambers, fOmaha/DouglasOmaha,
Civic cf›.'''t1.q0d;.. Cop S $ County,
_6
Center, 1819 Farnam Street, on July 25, .9/C•...„.,"„•, Q.
2006 at 2:00 p.m.
BUSTER BROWN, OF NEBRP $ 39.50
City Clerk Notary Publi o County,
7-14-06 _____ a e of Nebraska
..G.1!+ 't�.%'.. .'2^ ..9+'�a>•.� -u '.r s� +,x`s'c.x '_,'�"`�� � � _r' �.. .,
a,_ ._S .. _R`..,. �_•..wW�r~,�se�l..,�r �-'1.�8°ahrf rk.r.,.:_�s... .. ..i.v..._SI,•:�r.'t�.•e•.-ar..:?sua-�3��3 Yiak7:�k'a�,.:s::.. -2#i.e,�ia tT.e:-��e.t-c.�x..�C3'5���". 6
id subcontractor has
agreed to perform the subcontracting work 1. The Contractor shall submit periodic reports of
identified in the bid submitted by the Bidder. contracting with Protected and/or Disadvantaged
Business Enterprises in such form and manner and at
b. If Bidder fails to meet the goals set forth above, such time as prescribed by the City of Omaha (Exhibit
Good Faith Efforts Documentation must be "C" is currently required to be submitted within ten
submitted with bid. (10) calendar days following the end of each calendar
quarter,from the start of the project).
c. Also, prior to award of this contract, all Bidders
must submit Exhibit "B" Contractor Employment 2. The Contractor and subcontractors shall permit
Data Form with the bid. access to their books, records and accounts by
the Human Relations Director or a designated
d. The Bidder and any of its subcontractors that have representative for purpose of investigation to
been designated by the Bidder as PBE and/or DBE ascertain compliance with these specified
cipation subcontracted and telephone numbers of
in the contract work. In any case,Exhibits "A" and"B" PBE/DBE's that were contracted;
must be submitted with the bid. If the information so (2) A description of the information provided to
submitted indicates that the City of Omaha goals will PBE/DBE's regarding the plans and
not be met, the Bidder shall submit good faith efforts specifications for portions of the work to be
documentation with their bid. The evidence must show performed; and
to the City of Omaha's satisfaction that the bidder has (3) A detailed statement of the reasons why
in good faith made every reasonable effort in the City additional prospective agreements with
of Omaha's judgment, to meet such goals. If any
''-.-,4$''.4, •t:-'7•4re,77, ..,)-,'-.1 \•••,,,., • :
. 1 ,
• ir --.,,,-
, • „:„...,,,
s,•,:i ' 17,A -•04r.:,,W-...\\• '••••'•
p! --; \ , ,...1•,' .., ,t• ,.0'p .. , 5,:, t 1 ,,,..,, ..., ,,,,.
4-/' 1••• i•,-;•---- isr.s-)•‘•-,,,,,,,.•
; 4:'i \- I \ 4 1_ P*L'•• ,,•ii -%-,,
: ; ., i . . .. . -.:1,..I.,,.•,,L.,:„ ,, .
-, ,‘ • -'..... 0 .•
:-.-.
• ' \ ....,, A\
_
., • ,. -- ',.;.:-1,--- -
.• -.0.4-'4-
. ,. .v,--,-
..,...
.......,--- -.._..,.-.• • ,
--I
.,,
._„_,_
•
0 Iva P• Z
cn o CM v o
tg
T O IiJII1HI
CD05 \ • at? '-e '-'• P
--N \
`-r Cr
n CDO CSID
CD
v
�D o CT CCD p. A- ��,.' Cr Q
`C F4 )p-h 0''C O
`A.ltt f f fF,,j1 '
ompany Bid: $349,460.40
4153 S.67 St. Diff From Low: $149,646.20
Omaha NE 68117-
Number of Bids: 3
Low Bid: $199,814.20
High Bid: $349,460.40
Average Bid:: $254,295.10
•
•
Page 3 of 5, 6/7/2006 2:30:41 PM, Bid Tabulation, Generated by:general services for project OPW 51089