Loading...
RES-2020-0793a - Planning Recs with MapsRML City of Omaha Planning Department Planning Board Memo To: Chairman and Members of the Planning Board From: David K. Fanslau Planning Director Date: March 25, 2020 Subject: OMAHA BOX BUILDING SUBDIVISION Southeast of North 21st Street E. and Avenue J Case #C12-20-050 At the March 4, 2020 meeting, the Planning Board laid over the preliminary and final plat for OMAHA BOX BUILDING SUBDIVISION, to allow the applicant time to provide additional information. The applicant has submitted revised materials addressing concerns identified in the recommendation report dated February 26, 2020. The site has increased from 20.32 acres to 26.03 acres in order to incorporate parcels south of the original site into the boundaries of the subdivision. Revised plans show a total of two lots and three outlots proposed. The proposed outlots will accommodate identified wetlands and proposed onsite drainage. The revised layout incorporates parcels on the south of subject site into Lot 2, and addresses the primary concern that a street must be dedicated and constructed to provide access to the parcels. Outlots 2 and 3 have been included in the plat to capture the identified wetlands on the south end of Lot 1, but the lots do not have frontage on a public street. A request for a waiver to Section 53-8(4d), Lot frontage, for Outlots 2 and 3 has been included as a part of this request. No additional changes to the initial request have been identified. PUBLIC IMPROVEMENTS: Streets: Construct Avenue J to City street standards between North 21st Street E. and North 23rd Street E. For the alley east of Avenue H/20th Street E and south of the vacated 21st Street E, construct the new pavement as an OPW public improvement, and comply with industrial standards for pavement thickness. Plat Document: On the plat, denote the areas to be vacated with hatching, and insert the standard vacation language. Remove the “outlot” designation from Outlot 1 and place the area within Lot 1. Rename Outlots 2 and 3 to Outlots A and B. Provide an access easement between Outlots A and B and the right-of-way. OMAHA BOX BUILDING SUBDIVISION Case Number: C12-20-050 Page 2 RML Sanitary Sewers: Sanitary sewer must be provided as required by Chapter 53, Subdivisions, of the Omaha Municipal Code. Grant easements for any public sewers in Lots 1 and 2 for which easements do not currently exist. Sidewalks: Sidewalks must be provided along all street frontages pursuant to Chapter 53, Subdivisions. UTILITIES: Water, gas, and electricity will be provided as required by Section 53, Subdivisions, of the Omaha Municipal Code. GRADING AND DRAINAGE: Coordinate with Public Works for the storm sewer, drainage, and grading improvements at the south end of Lot 1. The development must comply with all stormwater management ordinances and policies, including no net increase in stormwater runoff and treatment of the first half inch of stormwater for water quality. ENVIRONMENTAL: Wetlands Analysis/Mitigation: A wetlands analysis has been submitted identifying approximately .45 acres (19,602 square feet) of potential wetlands located east and west of the existing rail spur on the south side of the primary structure on Lot 1. Revised plans appear to capture the potential wetlands within two outlots. Based on submitted plans no wetland mitigation is required. Concurrently with the recording of the final plat, record a Memorandum of Agreement for Lot 1, Outlot A, and Outlot B, to assign the ownership requirement for the outlots; coordinate with Public Works on the language for the MOA. Provide for the use, ownership, and maintenance of the outlots in the subdivision agreement, including additional ownership requirements for Outlots A and B. FINANCING: Financing of the proposed development is being provided privately. LAND USE AND PLANNING: The existing HI-Heavy Industrial District zoning allows for redevelopment of this site with manufacturing and is consistent with the Future Land Use Element of the City’s Master Plan. A detailed zoning review has not been completed on the submitted site plan. This review is concerning the subdivision of the land only. All requirements of the HI District must be met as a part of the redevelopment of the site. Incorporation of the parcels south of the site ensures that subdivision of this property will not result in landlocked and inaccessible properties, and eliminates the need to construct a road to the southern boundary of the property. Identified wetlands are being captured within outlots. Typically waivers for frontage can be supported for lots designated for wetlands protection. The requested waiver for lot frontage is acceptable. Southern portions of the Box Company building are located within a federally designated floodplain. Submitted materials include a completed elevation certificate indicating the lowest floor OMAHA BOX BUILDING SUBDIVISION Case Number: C12-20-050 Page 3 RML of the building is a minimum of one foot above the base flood elevation. However, all construction completed within the Box Company building or the proposed parking lot and stormwater retention must obtain a floodplain development permit prior to submittal of any building/grading permits. The submitted final plat document does not include the proposed outlots in the title and appears to include the metes and bounds description used prior to incorporation of the southern parcels within the plat boundary. The correct proposed legal description and metes and bounds description must be provided. In addition, the final plat document is identified as “Preliminary Plat: on the right-hand side Title Block. Revise the final plat document to reflect the correct legal description, including the number and name of the proposed outlots; the full metes and bounds description; and “Final Plat” on the Title Block. ANALYSIS: The requested minor plat generally complies with Chapter 53, Subdivisions and the goals and objectives of the Omaha Master Plan. RECOMMENDATION: Approval of the waiver to Section 53-8(4d), Lot frontage, for Outlots A and B. Approval of the preliminary plat, subject to the following conditions: 1. Construct Avenue J to City street standards between North 21st Street E. and North 23rd Street E. 2. For the alley east of Avenue H/20th Street E and south of the vacated 21st Street E, construct the new pavement as an OPW public improvement, and comply with industrial standards for pavement thickness. 3. Coordinate with Public Works for the storm sewer, drainage, and grading improvements at the south end of Lot 1. 4. Revise the plat document as follows: a. Remove the “outlot” designation from Outlot 1 and place the area within Lot 1. b. Rename Outlots 2 and 3 to Outlots A and B. c. Revise the title block to reflect the corrected legal description. d. Revise the metes and bounds description to reflect the expanded plat boundary. e. Denote the areas to be vacated with hatching, and insert the standard vacation language. f. Grant easements for any public sewers in Lots 1 and 2 for which easements do not currently exist. g. Provide an access easement between Outlots A and B and the right-of-way. 5. Concurrently with the recording of the final plat, record a Memorandum of Agreement for Lot 1, Outlot A, and Outlot B, to assign the ownership requirement for the outlots; coordinate with Public Works on the language for the MOA. 6. Provide for the use, ownership, and maintenance of the outlots in the final subdivision agreement, including additional ownership requirements for Outlots A and B. 7. Compliance with all applicable floodplain development regulations, including obtaining a floodplain development permit for all grading and construction located within the floodplain. 8. Provide sidewalks along all street frontages as required by Section 53-9(9), Sidewalks. 9. Compliance with all stormwater management ordinances and policies. Approval of the final plat, subject to the conditions of preliminary plat approval and submittal of an acceptable final subdivision agreement prior to forwarding the request to City Council. OMAHA BOX BUILDING SUBDIVISION Case Number: C12-20-050 Page 4 RML ATTACHMENTS: Preliminary Plat Final Plat Recommendation Report dated February 26, 2020 AVENUE JGRASSCONCRETE CONCRETEN 20TH STREET E GUTTER LINEASPHALTDOOR986.87CONCRETE GRAVELCONCRETE GRAVELGRAVELGRAVELN 20TH STREET E GRATE INLETRIM ELEV.:981.34'18" RCP (S): 976.59'CURB INLETRIM ELEV.: 980.38'48" RCP (N) FL: 972.77'18" RCP (E) FL: 975.53'18" RCP (S) FL: 972.77CURB INLETRIM ELEV.: 980.47'18" RCP (W) FL: 976.42'CURB INLETRIM ELEV.: 980.85'48" RCP (N) FL: 972.77'18" RCP (E) FL: 975.53'48" RCP (S) FL: 972.77'CURB INLETRIM ELEV: 980.86'12" RCP (E) FL: 977.06'18" RCP (W) FL: 976.91'STORM MANHOLERIM ELEV.: 981.80'36" (E): 976.59'CURB INLETRIM ELEV.: 981.72'18" RCP (N) FL: 976.12'36" RCP (E) FL: 975.27'36" RCP (W) FL: 975.19WATER MANHOLERIM ELEV.: 982.40'SANITARY MANHOLERIM ELEV.: 982.23'(N): 971.82'(E): 972.03'(W): 972.01'(S): 971.78'STORM MANHOLERIM ELEV.: 982.36'18" RCP (E) FL: 976.36'18" RCP (S) FL: 976.36'STORM MANHOLERIM ELEV.: 982.17'18" RCP (W) FL: 976.17'48" RCP (E) FL: 976.17'STORM MANHOLERIM ELEV.: 981.65'48" RCP (W) FL: 975.55'48" RCP (NE) FL: 975.45'STORM MANHOLERIM ELEV.: 980.90'48" RCP (E) FL 975.40'48" RCP (SW) FL 975.35'STORM MANHOLERIM ELEV.: 981.90'12" RCP (N): 975.90'12" RCP (W): 975.46'STORM MANHOLERIM ELEV.: 980.09'48" RCP (W) FL: 975.64'48" RCP (E) FL: 975.64'12" RCP (S) FL: 976.59"WATER MANHOLERIM ELEV.: 980.37'SANITARY MANHOLERIM ELEV.: 981.64'(N): 973.44'(W): 973.26'STORM MANHOLERIM ELEV.: 980.54'24" RCP (N): 977.04'42" RCP (E): 977.04'48" RCP (W): 977.04'24" RCP (S): 977.04'STORM MANHOLERIM ELEV: 981.23'48" RCP (N) FL: 976.28'48" RCP (W) FL: 976.27'12" RCP (E) FL: 976.28'STORM MANHOLERIM ELEV: 981.12'42" RCP (N) FL: 976.79'42" RCP (E) FL: 976.79'42" RCP (W) FL: 976.79'STORM MANHOLERIM ELEV: 980.89'42" RCP (NE) FL: 977.39'24" RCP (S) FL: 977.39'42" RCP (W) FL: 977.39'SANITARY MANHOLERIM ELEV.: 980.05'(NE): 975.05'(E): 974.70'(S): 974.70'STORM MANHOLERIM ELEV.:981.60'36" RCP (N) FL: 980.10'42" RCP (SW) FL:980.10'24" RCP (E) FL:980.10'SANITARY MANHOLERIM ELEV.: 982.59'(N): 971.04'(S): 970.99'P.O.B.WATER MANHOLERIM ELEV.: 981.54'STORM MANHOLERIM ELEV.: 979.03'24"RCPFL ELEV: 980.0124" RCPFL ELEV.: 978.40STOCK PILESANITARY MANHOLERIM ELEV.: 979.25'S2°49'05"E 599.07'N2°49'08"W 599.02'OUTLOT 1PIPE NETWORKCONC PAD W/TRANSFORMERCONC PAD W/TRANSFORMER &ELECTRIC METERTO BE RELOCATEDDOWNSPOUT(TYP)MATERIALCOVERCONC. PADW/ GASMETERSDOOR981.69DOOR978.52DOOR981.62DOOR981.47DOOR981.43DOOR981.50DOOR983.54DOOR981.48DOOR981.43DOOR981.84DOOR981.70DOOR981.68DOOR982.64DOOR982.95RIGHT-OF-WAY TO BE DEDICATED54.0' SANITARY SEWER& UTILITY EASEMENTVANCBCBSDSDCBCBSDSDCBCBSDSDSDMHSDMHSDSDMHGGGGGGGGGGGGGGGGG61051016164332544.57'51.47'18.50'24.00'18.50'18.00'18.50'24.00'18.50'6.00'51.35'5.00'10.00'10.00'7.00'7.00'4.50'5.00'5.00'5.00'4.56'5.00'7.50'7.50'5.00'4.47'5.00'20.00'20.00'20.00'20.00'46.00'25.00'91.00'10.00'25.00'9.93'55.00'9.00'9.00'12.00'91.00'225.50'54.50'105.59'19.93'39.75'32.38'6' TALL CHAIN LINKFENCE, TYP6' TALL CHAIN LINKFENCE, TYP6' TALL CHAIN LINKFENCE, TYPDOUBLE SWING GATEDOUBLE SWING GATEHEAVY DUTY PAVINGHEAVY DUTY PAVINGHEAVY DUTYPAVINGHEAVY DUTY PAVINGHEAVY DUTYPAVINGVEHICULAR PAVINGVEHICULAR PAVINGDETENTION BASINDECORATIVEPAVINGWALK PAVING17.59'126.50'28.56'28.00'145.00'24.50'25.00'21.94'50.00'25.00'14.50'35.00'20.00'14.50'40.00'40.00'23.82'100.61'30.52'12.80'13.79'343.75'18.50'18.50'18.50'172.84'235.75'EXISTING PAVINGSLIDING GATESLIDING GATEWALK PAVINGHEAVY DUTY PAVINGWALK PAVINGWALK PAVINGWALK PAVINGWALK PAVINGWALK PAVINGRELOCATEDTRANSFORMERREROUTED GAS LINEBACD4321543215BACDPROJECT FORSCALESHEET NAMESHEET NUMBERDESCRIPTIONDATEMARKPROJECT NUMBERPROJECT MANAGERORIGINAL ISSUEPROJECT DESIGNERPROJECT ARCHITECTLANDSCAPE ARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERINTERIOR DESIGNEREQUIPMENT PLANNERWAYFINDINGDRAWN BYFILE NAMETOD TRIGG10193011FLATROCKGROUP, LLCBOX PROJECTTIF SUBMITTAL2501 NORTH 21ST STREETOMAHA, NE 68110SITE LAYOUT PLAN1" = 40' - 0"C101A00C101.dwg---#### ####- AREA AMATCHLINE: SEE SHEET C101BFOR CONTINUATION4040080SCALE IN FEET AVENUE HCONCRETE PONDASPHALT ASPHALTCONCRETE CONCRETE GRAVELAVENUE HSTORM MANHOLERIM ELEV.:976.57'18" FESFL ELEV.:973.81'SANITARY MANHOLERIM ELEV.; 982.29'(N): 969.84'(S): 969.79'SANITARY MANHOLERIM ELEV: 980.19'(NE) 973.24'(W) 973.34'BOX CULVERT48"RCP (N) FL:967.88'CONC24" RCPFL ELEV.: 971.64'30" CMPFL ELEV.: 975.23"SANITARY MANHOLERIM ELEV.: 978.49'(W): 964.55'(E): 964.59'18" CMPFL ELEV.: 973.94ASPHALTCONCRETEGRAVELGRAVELGRAVEL10" METAL PIPEFL ELEV.: 980.6210" METAL PIPEFL ELEV.: 980.04AVENUEGN 21STSTREET ESANITARY MANHOLERIM ELEV.: 979.9412" (N): 965.2412" (NW): 967.9412" (NE): 968.04 (E): 964.25 (W): 964.25STORM MANHOLERIM ELEV.: 979.86'30" (NW): 974.61'(SE): 974.61'STORM MANHOLETOP OF RING ELEV.: 978.88'STORM MANHOLERIM ELEV.: 982.52' (E): 972.87'(W): 972.87'SANITARY MANHOLERIM ELEV.: 981.37'(E): 964.90'(W): 964.90'SANITARY MANHOLERIM ELEV.: 979.36'(NW): 964.64'(E): 964.64'OUTLOT 2OUTLOT 333" TALLCONC VAULTLIFT STATIONGATEPIPE NETWORKDOCK2 GAS METERSDOOR981.69DOOR978.52982.95DOOR981.39DOOR982.14DOOR981.66DOOR981.78DOOR981.82VANSDSDMHSDSDSD SD CBCBGSDCB5.00'5.00'9.00'19.93'6' TALL CHAIN LINKFENCE, TYPDOUBLE SWING GATEHEAVY DUTY PAVINGVEHICULAR PAVINGWALK PAVINGHEAVY DUTYPAVING21.94'27.83'18.45'25.00'50.00'25.00'25.00'52.40'24.00'24.00'24.00'24.00'24.00'28.00'28.00'52.00'28.00'2 8 . 0 0 '28.00'42.00'20.00'13.79'43.12'57.88'172.87'171.15'145.39'EXISTING PAVINGWALK PAVINGHEAVY DUTY PAVINGDOUBLE SWING GATEDOUBLE SWING GATEBACD4321543215BACDPROJECT FORSCALESHEET NAMESHEET NUMBERDESCRIPTIONDATEMARKPROJECT NUMBERPROJECT MANAGERORIGINAL ISSUEPROJECT DESIGNERPROJECT ARCHITECTLANDSCAPE ARCHITECTCIVIL ENGINEERSTRUCTURAL ENGINEERMECHANICAL ENGINEERELECTRICAL ENGINEERINTERIOR DESIGNEREQUIPMENT PLANNERWAYFINDINGDRAWN BYFILE NAMETOD TRIGG10193011FLATROCKGROUP, LLCBOX PROJECTTIF SUBMITTAL2501 NORTH 21ST STREETOMAHA, NE 68110SITE LAYOUT PLAN1" = 40'-0"C101B00C101.dwg---#### ####- AREA BMATCHLINE: SEE SHEET C101AFOR CONTINUATION4040080SCALE IN FEET PRELIMINARY PLATACKNOWLEDGMENT OF NOTARY DEDICATION OMAHA BOX BUILDING SUBDIVISIONDOUGLAS COUNTY, NEBRASKASURVEYOR'S CERTIFICATE LEGAL DESCRIPTION ALBDLM07715.001 1 of 1 DEDICATION ” ” ” ” ” ” ” ” ” ” ” ” ” ” ” ” ” ” ” ”P:\07715001\_CAD\Survey\07715001-Final Plat_000.dwg, 3/12/2020 3:23:19 PM, DWG To PDF.pc3 RML City of Omaha Planning Department 1819 Farnam Street Suite 1100 Omaha, NE 68183 402-444-5150 Planning.CityofOmaha.org I. GENERAL INFORMATION: Purpose: To subdivide 20.32 acres into two lots to allow redevelopment of the site with heavy industrial uses. Existing Use(s): Heavy Industrial (manufacturing) Existing Zoning: HI, HI-FF Adjacent Land Use(s): Adjacent Zoning: North: Industrial North: GI, GI-FF South: Industrial South: HI, HI-FF East: Industrial East: HI, HI-FF West: Industrial West: HI, HI-FF Future Land Use Designation(s): Industrial Applicable Regulations: If approved, development of the site will be subject to the requirements of the HI-Heavy Industrial zoning district regulations, the floodplain development regulations, as well as all other applicable regulations. No building permits will be issued based on a site plan that does not comply with the provisions of the Zoning Ordinance. II. SPECIAL INFORMATION: Site Characteristics: The site is comprised of a total of 20.32 acres made up of a number of parcels and portions of rights-of-way in a fully developed industrial neighborhood south of Eppley Airfield. Portions of the property are located within the FF-Flood Fringe Overlay District. The primary structure on the site is the Omaha Box Company building, located at 2501 North 21st Street E. East of the Box Company building is developed with the equipment storage yard and tanks for Monarch Oil Company. Each property has separate access to a rail spur to the south. Avenue J on the north side of the site is an unimproved gravel roadway. Development Proposal: Nebraska Machinery Company (NMC) is proposing to redevelop the Box Company building with their new corporate headquarters and manufacturing facilities as well as a new parking lot on property to the west. As a part of this request, the applicant is proposing the vacation of a portion of the North 21st Street E right-of-way as well as all of the North 22nd Street E. right-of-way abutting the site. North 22nd Street E will be incorporated Date: February 26, 2020 Case Number(s): C12-20-050 Applicant: Lorri Brockman Request: Preliminary and Final Plat approval of OMAHA BOX BUILDING SUBDIVISION, a minor plat inside the city limits Location: Southeast of North 21st Street E. and Avenue J Case Number: C12-20-050 OMAHA BOX BULDING SUBDIVISION Page 2 RML into the Monarch Oil site, while North 21st Street E right-of-way and the lot to the west will be incorporated into the new NMC site. Public Improvements: Lot Layout: Due to exclusion of the four parcels south of the subject site from this subdivision, a full width right-of-way must be dedicated and public street constructed to the southern boundaries of the property in order to provide access to the parcels. In lieu of the requirement to dedicate right- of-way and pave a new public street, include these four parcels south of the current subdivision boundary (owned by Martin Operating Partnership) within Lot 1 or Lot 2. Streets: Construct Avenue J to City street standards between North 21st Street E. and North 23rd Street E. Provide all necessary plans showing the required improvements. For the alley east of Avenue H/20th Street E and south of the vacated 21st Street E, construct the new pavement as an OPW public improvement, and comply with industrial standards for pavement thickness. Plat Document: On the plat, denote the areas to be vacated with hatching, and insert the standard vacation language. Sidewalks: Sidewalks must be provided along all street frontages pursuant to Chapter 53, Subdivisions. Sanitary Sewers: Sanitary sewer must be provided as required by Chapter 53, Subdivisions, of the Omaha Municipal Code. Grant easements for any public sewers in Lots 1 and 2 for which easements do not currently exist. Utilities: OPPD has identified transmission lines that through the development. OPPD must be contacted to coordinate any relocation, grading, construction, or vegetation management plans near this line. Grading and Drainage: Coordinate with Public Works for the storm sewer, drainage, and grading improvements at the south end of Lot 1. The development must comply with all applicable stormwater management ordinances and policies, including providing for no net increase in stormwater runoff and treatment of the first half inch of stormwater for water quality. Environmental: Wetlands Analysis and Mitigation: A preliminary wetlands analysis has been submitted, but does not indicate the type/jurisdiction of the potential wetlands; whether wetlands are being destroyed as a part of this request; and if so, what mitigation efforts are being proposed. Additional information must be provided. If the additional parcels are incorporated into the boundaries of this plat, the wetlands analysis (and potential mitigation) must be updated to include the new boundary. All disturbed wetlands must be mitigated at a 3:1 ratio. Land Use and Planning: A number of parcels located south of the site are also under the same ownership and function as part of the Monarch Oil sites. In a pre-application letter dated February 3, 2020, staff specifically noted that property south of Avenue G, between 21st and 23rd Streets, must be included as a part of this Case Number: C12-20-050 OMAHA BOX BULDING SUBDIVISION Page 3 RML subdivision in order to ensure no remnants or portions of parcels remain unplatted without street access. These properties have not been included as a part of the proposed subdivision. The site is designated as appropriate for industrial uses in the Future Land Use element of the City’s Master Plan. The proposed subdivision will allow redevelopment of the site with heavy industrial uses and is consistent with the Master Plan. Southern portions of the Box Company building are located within a federally designated floodplain. Submitted materials include a completed elevation certificate indicating the lowest floor of the building is a minimum of one foot above the base flood elevation. However, all construction completed within the Box Company building or the proposed parking lot and stormwater retention must obtain a floodplain development permit prior to submittal of any building/grading permits. A detailed zoning review has not been completed on the submitted site plan. This review is concerning the subdivision of the land only. All requirements of the HI District must be met as a part of the redevelopment of the site. III. ANALYSIS: Due to potential changes of this request to addressing the parcels to the south, the boundary and lot configuration of the subdivision may be substantially altered. In addition, more information is required regarding wetlands mitigation. The request must be laid over to allow the applicant to coordinate with City staff and provide additional information. IV. RECOMMENDATIONS: Layover. V. ATTACHMENTS: Lot Layout (Areas A and B) Final Plat SUBJECT AREA IS SHADED - APRIL 2020 HI HI-FF RR-FF HI HI HI-FW GI-FF HI-FF HI-FF HI HI GI HI HI HI-FF GI RR HI-FF HI-FF GI HI HI-FF HI HI-ACI-4(PL) HI-FF-ACI-4(PL) GI HI-FF HI-FF RR HI GI HI-FF HI-FF HI-FF HI-FF HI AV HI-FF HI-FF HI HI-FF HI HI-FF HI GI HI HI GI-FF HI N 22nd St EAve nue HN 19th St EAvenue J N 18th St EAve n u e G N 25th St EN 23rd St EN20thStEN21stStEN 17thAve EF re e d o m P a rk R d ±0 1,300 Feet 4CASE:C12-20-050APPLICANT:Lorri BrockmanREQUEST:Preliminary and final plat approval of OMAHA BOX BUILDING SUBDIVISION,a subdivision inside city limits, with a waiver of Section 53-8(4d), Lot frontageLOCATION:South of 21st Street E. and Avenue J