Loading...
RES-2020-0717a - Planning Recs with MapsPJB City of Omaha Planning Department 1819 Farnam Street Suite 1100 Omaha, NE 68183 402-444-5150 Planning.CityofOmaha.org Date: May 27, 2020 Case Number: C10-20-086, C12-20-087 Applicant: Charleston Homes, LLC Request: Preliminary Plat approval of ARBOR VIEW (Lots 382-641, Outlots I-N), a subdivision outside city limits, with rezoning from AG-Agricultural District to DR-Development Reserve District and R4-Single-Family Residential District (High-Density). Location: Southeast of 216th and Fort Streets I. GENERAL INFORMATION: Purpose: To subdivide and rezone 83 acres of land into 260 single-family residential lots and six outlots for open space and drainage purposes. Existing Use(s): Agricultural Existing Zoning: AG Adjacent Land Use(s): Adjacent Zoning North: Agricultural North: AG South: Residential South: R5 East: Residential East: R4/DR/R3 West: Agricultural West: AG Future Land Use Designation(s): Low-density residential. Applicable Regulations: If rezoned, the subject site would be required to comply with the regulations of the DR and R4 Districts, as well as all other applicable development regulations. No building permits will be issued based on a site plan that does not comply with the provisions of the Zoning Ordinance. II. SPECIAL INFORMATION: Site Characteristics: This site consists of approximately 83 acres located southeast of 216th and Fort Streets. The site has historically been used for agricultural purposes and consists of moderate slopes generally falling north to south. Development Proposal: The applicant proposes to subdivide the property into 260 single-family residential lots and six outlots for open space and drainage purposes. This subdivision is essentially the fourth phase of Arbor View, however, this SID will be separate from phases 1 through 3. Public Improvements: Traffic and Circulation: The proposed street connections from the development to Fort Street will require permits from the Douglas County Engineer's office and must meet proper sight distance criteria and incorporate intersection improvements as required by current City/County ARBOR VIEW (Lots 382-641, Outlots I-N) Case No. C10-20-086, C12-20-087 PJB Page: 2 Access Policy. The cost of the roadway improvements for the street connections, if required, will be the responsibility of the developer. The sight distance criteria to be used in the evaluation of the driveway connections, will be AASHTO Stopping Sight Distance for 50 MPH design (425’). Temporary turn-arounds must be provided at the terminus of all temporarily dead-ended streets. Provide for the improvement of Fort Street to three lanes along the subdivision’s frontage, constructed as the ultimate urban section with concrete pavement and curb and gutters. Coordinate with Public Works on an acceptable GO paving plan. Place a note on the plat that there shall be no access to Fort Street from any lots or outlots, and no access to Kestral Parkway from Lots 560 or 561. On the Kestral Parkway approach to Fort Street, provide a 16 foot inbound lane, a 4 foot paved median, and two 12 foot outbound lanes, and dedicate ROW as needed to accommodate. Coordinate with Douglas County to grade the subdivision to match the ultimate profile of Fort Street. Coordinate with Public Works on an acceptable roundabout design. Provide for traffic calming on all streets longer than 1000 feet. Coordinate with the Planning and Public Works Departments on the Complete Streets Design Guide design checklists. Sanitary Sewer: Submit the 30% design report for the sanitary sewer to the Public Works Design Division per Section 2.14 of the City’s Wastewater Collection Systems Design Manual. Storm Sewer: Storm sewer design computations and final plans must be submitted to the Douglas County Engineer for review that relate to the handling of roadway and site drainage along the development boundary adjacent to Fort Street. Sidewalks: Sidewalks must be provided pursuant to Chapter 53, Subdivisions. Utilities: Utilities will be provided as required by city code. OPPD has a transmission line that runs east/west along the north edge of the proposed development. OPPD should be contacted to coordinate any grading, construction or vegetation management plans proposed near this line. Grading and Drainage: Coordinate with Public Works regarding the location of the stormwater detention basins in relation to the stream setback. ARBOR VIEW (Lots 382-641, Outlots I-N) Case No. C10-20-086, C12-20-087 PJB Page: 3 Proposed site grades along the northern boundary of the platting, adjacent to Fort Street, must be coordinated with the future improvement of the roadway. The consultant will be required to submit cross section information, for review purposes, that shows the relationship of the proposed site grading to the existing and future Fort Street improvements. Certification of the grade coordination will be required prior to the City of Omaha’s approval of the final plat. Any grading, sewer or utility work carried out in conjunction with this development, in Fort Street right-of-way, will require a permit(s) from the Douglas County Engineer. Compliance with all applicable stormwater management policies and ordinances, including a no net increase in stormwater runoff and treating the first ½” of stormwater for water quality. Parks and Open Space: Provide for the use, ownership, and maintenance of the outlots in the subdivision agreement. Coordinate design for Park 33c with adjacent SIDs and the Omaha Parks Department. The park design shall meet the requirements as outlined in the Suburban Park Master Plan, 2016 Update. The park should be designed by a Professional Landscape Architect licensed in the State of Nebraska. Environmental: Tree Canopy/Mitigation: A tree canopy analysis and planting schedule were provided with the submittal. The canopy calculations are accurate, showing 30 trees are required for mitigation. However, over half of the trees given in the planting schedule are oaks. One genus should not comprise a majority of plantings in order to promote a resilient tree canopy. The applicant must coordinate with the Planning Department regarding an acceptable tree mitigation plan. Noxious Weeds: Nebraska Statute (2-955) states that property owners are responsible for the control of noxious weeds and to prevent noxious weed seeds from spreading onto adjoining properties. The applicant will be required to submit a letter of approval from Douglas County for a Noxious Weed Plan. Wetlands: A preliminary drainage report has been submitted indicating there are no wetlands within the boundaries of the project. Any drainageway must be placed in an outlot sized to accommodate either the 3:1 + 20’ section, or the 100-year storm flow (whichever is greater). Emergency Management: The applicant will be required to submit a letter from Douglas County Emergency Management confirming that acceptable emergency warning is being provided for the area. Financing: The projected total taxable valuation for this phase of development is estimated at $81,890,000. The projected total general obligation debt is ARBOR VIEW (Lots 382-641, Outlots I-N) Case No. C10-20-086, C12-20-087 PJB Page: 4 estimated at $3,274,282. The projected debt ratio is estimated at 4.0%. Coordinate with the City on an acceptable debt ratio. Land Use and Planning: A portion of Lot 1, Brunings First Addition is being replatted as part of this subdivision. However, the balance of the lot is not included on the proposed plat. Leaving this remnant is not allowed and the plat must be updated to include the remaining portion of Lot 1, Brunings First Addition in an outlot on the final plat. There also appears to be improvements located on southern portion of Lot 1, Brunings First Addition that are located within the FW-Floodway. The existing improvements are not permitted and must be removed and removal must be verified prior to submittal of a final plat. The rezoning from AG to DR and R4 is consistent with the Future Land Use Element of the City’s Master Plan. III. ANALYSIS: Conditionally, the proposed rezoning and subdivision is consistent with and carries out the goals and objectives of the City of Omaha Master Plan. IV. RECOMMENDATIONS: Approval of the rezoning from AG to DR and R4. Approval of the Preliminary Plat, subject to the following conditions: 1. Provide for the improvement of Fort Street to three lanes along the subdivision’s frontage, constructed as the ultimate urban section with concrete pavement and curb and gutters. 2. Include the remaining portion of Lot 1, Brunings First Addition in an outlot. 3. Remove all improvements within the Floodway currently located on Lot 1, Brunings First Addition. 4. On the Kestral Parkway approach to Fort Street, provide a 16 foot inbound lane, a 4 foot paved median, and two 12 foot outbound lanes, and dedicate right-of-way as needed to accommodate. 5. Coordinate with Douglas County to grade the subdivision to match the ultimate profile of Fort Street. 6. Coordinate with Public Works on an acceptable roundabout design. 7. Provide for traffic calming on all streets longer than 1000 feet. 8. Obtain all of the appropriate permits from Douglas County. 9. Place a note on the plat that there shall be no access to Fort Street from any lots or outlots, and no access to Kestral Parkway from Lots 560 or 561. 10. Coordinate with Public Works on an acceptable GO paving plan. 11. Coordinate with the Planning and Public Works Departments on the Complete Streets Design Guide design checklists. 12. Submit the 30% design report for the sanitary sewer to the Public Works Design Division per Section 2.14 of the City’s Wastewater Collection Systems Design Manual. ARBOR VIEW (Lots 382-641, Outlots I-N) Case No. C10-20-086, C12-20-087 PJB Page: 5 13. Coordinate with Public Works regarding the location of the stormwater detention basins in relation to the stream setback. 14. Place all drainageways in an outlot sized to accommodate either the 3:1 + 20’ section, or the 100-year storm flow (whichever is greater). 15. Coordinate proposed site grades along the northern boundary of the platting, adjacent to Fort Street, with the Douglas County Engineer. 16. Compliance with all applicable stormwater management policies. 17. Provide for the use, ownership, and maintenance of the outlots in the subdivision agreement. 18. Coordinate design for Park 33c with adjacent SID’s and the Omaha Parks Department park planning staff. 19. Coordinate with City Planning regarding an acceptable tree mitigation plan. 20. Submit a letter of approval from Douglas County for a Noxious Weed Plan. 21. Place all drainageways in an outlot sized to accommodate either the 3:1 + 20’ section, or the 100-year storm flow (whichever is greater). 22. Submit a letter from Douglas County Emergency Management confirming that acceptable emergency warning is being provided for the area. 23. Coordinate with the City on an acceptable debt ratio. 24. Provide sidewalks pursuant to Chapter 53, Subdivisions. 25. Provide temporary turn-arounds at the terminus of all temporarily dead-ended streets. 26. Coordinate any grading, construction or vegetation management plans proposed near the adjacent transmission line. 27. Submit storm sewer design computations and final plans to the Douglas County Engineer for review. V. ATTACHMENTS: Preliminary Plat 12501260124612481252125412561258126212641266126812401250 1260 1270 1280 1234123612381242124412461248 1252 12 5 4 1 2 5 6 1258 1262 12 6 4 12 6 6 12 6 8 1272 1272 1272 1274 1276 1278 1232 12 7 0 12701280127212 7 2 127212741274 127412761276 1276127812 7 8 127812821210122012301230 123012401240 1250125012121214121612181222 1222122212241224122412261226 122612281228 122812321232 123212341234 123412361236 123612381238 12381242124212441244 124612461248124812 5 21252 1280 1280 1282 1284128635' NO BUILD EASEMENT(SEE NOTE 6)5605415525475385345355365405375445455465495485505515535555615625645655665675106326336346355005015045055065085124894884974914924934944994614604594954984964784622.067 ACOUTLOT "L"0.818 ACOUTLOT "N"5035094905114864814824834844854875815945976286105585213824744424724694044054064074084094104114124144154304294284254244234224184504484474464454444434634664674684704734714765135145155165185205335325315305295285265245233853833973963953943933923913903893865825685695705715725735745795955835845855865895915925935966076066056046036026016005996196086316206226236246256266276306186176166156136116095595565574314334414394384374364354344214203844324494403875223:1+20 LINE641640638637480479621S SSSSSSSSSSSSSSSSSSSSSSSSSSSSS OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP417543542419416FORT STREETNORTHWEST CORNEROF THE NE1/4SECTION 01-T15N-R10ES T R E E T " D " S T R E E T " E "KESTRALFUTURE PROPOSED LOTSNOT A PART OF THIS PLAT(313')(322')(153')(7 7 ' ) (165')(2 4 2 ' ) (2 6 4 ' )(205')(95')(2 9 7 ' ) (92 ' )(97')(57')(52')(75')(49')(62')(364 ' )(52')(301')(302')(655')(155')(610 ' ) (115 ' )(112')(492 ' )(98')( 1 6 4 ' ) ( 7 2 ' )(543')(361')(77')(38')(113')(327')(167')(318')(300')(129')(859')(845')(350')(496')(303')(303')(110')( 6 8 ' ) ( 5 0 ' )(210')(716')(150')(747')(33')(180')(25')STREET "F "STREET "G "STREET "H "STREET "C"STREET "A"STREET "B"STREET "F"STREET "I"STREET "J"KESTRAL PARKWAY5544774656.587 ACOUTLOT "I"STREET "K"45845645245445345145745520' SEWER &DRAINAGE EASEMENTBOOK 622, PAGE 295CREEK CL4034024014000.984 ACOUTLOT "J"0.606 ACOUTLOT "K"20' SANITARY SEWEREASEMENTINST. No. 2006-065268PROPOSED RIGHT-OF-WAYTO BE PURCHASED3:1+20 LINE3:1+20 LINE3:1+20 LINESSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS S S S S SSSSSSSSSSSSSSS T ST STSTSTSTSTSTSTSTSTSTSTST39939841342642747550250763951751952552738863646435' NO BUILD EASEMENT(SEE NOTE 6)563629539612575576577580578587588590598614SOUTHWEST CORNEROF THE NE1/4SECTION 01-T15N-R10ESIGN AND LANDSCAPEEASEMENT50'50'50'65'65'65'50'50'50'60'60'50'50'50'65'65'50'50'50'5 0 '50'50'50'50'50'50'50'50'50'50'50'50'33'50'50'(846')5 0 '50'5 0 ' 6 5 '65'6 5 '50'50'50'6 0 '50'60'50'50'33'50'13121110987612518171615192021222324431468'1 8 '116'80'128'128'62'62'128'70'70'128'58'58'128'70'70'128'61'61'128'62'62'129'19'50'76'143'65'93'54'85'65'119'54'69'89'74'47'91 ' 2 3 ' 156'130'17' 1 1 8 ' 144'36'34'143 '67'18'107'139'4 2 '72'112'18'60'125'68'1 8 '127'139'56'70'70'125'62'70'62'125'62'58'125'58'58'125'56'50'56'125'70'58'50'125'50'50'70'125'70'70'22'58'129'23'29'30'138'62'138'70'138'58'137'50'137'70'137'50'136'70'62'20'6 7 '70'136'131'110'132'9 1 '9'1 1 8 '17'121'56'127'87'18'114'100'58'128'58'62'128'70'70'78'138'15'53'12'9'56'142'79'16'23'34'31' 2 5 '135'6'1 0 0 '127'7 0 ' 41 ' 2 0 ' 3 0 '127'5 0 ' 7 0 ' 5 0 '127'62' 6 2 ' 6 2 ' 7 0 '127'54'126'114'1 8 '87'126'62'55'131'11'54'132'58'131'4'126'6 1 '126'6 2 ' 7 0 '126'5 4 ' 6 2 '126'62'5'128'15'55' 6 6 ' 89'130'13'52'72'129'53'128'66'90'127'88'18'114'100'70'132'70'11'140'104'3'23'56'48'58'133'1 4 ' 8 8 '127'6 2 ' 6 2 '127'7 0 '8'5'6 2 '127'6 2 ' 7 2 ' 6 2 ' 6 2 ' 7 3 ' 6 2 '127'1 3 ' 5 6 ' 5 9 ' 7 4 ' 5 8 '133'12'18'67' 6 9 '44'82'114'1 8 '50'35'128'132'58'58'130'5 4 '127'4 5 '126'2 3 ' 6 2 '126'6 2 '126'5 8 '126'65'31'7 0 '19'159'55'112'50'18'64'8'49'147'81'60'148'68'19'51'18' 2 8 ' 33 '90'86'150'1 9 ' 8 1 ' 2 6 '152'5 0 ' 5 0 '136'5 8 '4'56'51'16'114'5 3 '51'49'34'15'19'12'1 1 7 '126'125'50'125'51'125'51'61'121'4'54'127'45'67'59'51'24'18'15'46'2'138'55'18'104'52'70'63'125'130'7'50'19'17'1'92'44'1'75'125'61'9'19'15'97'4'72'34'30'90'131'89'125'27'38'3'70'125'70'532'161'27'165'48'70'62'70'62'70'62'67'63'99'151'114'151'70'62'151'70'151'62'151'70'151'62'151'20'84'37'77'18'125'3 3 '28'18'145'81'51'142'125'52'9'70'66'125'58'50'58'125'62'70'62'125'50'50'50'125'70'70'70'53'125'53'50'68'19'126'34'19'24'38'50'70'112'1 8 '4'46'112'52'15'126'68'161'17'126'51'70'126'50'126'70'126'50'126'70'126'50'126'8'127'66'5'126'95'56'18'114'87'45'77'133'70'6'17'50'28'121'45'60'126'67'18'71' 6 1 '45'99'126'42'15'57'126'50'63'50'126'62'58'62'126'70'62'70'126'62'70'62'126'50'58'50'126'50'50'58'70'126'62'62'126'6'43'52'61'55'38'130'65'15'52'126'46'114'1 8 '61'6'61'72'126'63'126'58'62'126'70'126'58'126'70'126'58'126'126'70'126'56'9'126'98'58'126'7'114'59'18'129'32' 24' 53'48'53'36'83'125'87'53'70'125'56'56'62'125'62'70'125'70'62'125'62'70'125'70'62'125'62'157'81'82'4 6 ' 83' 102' 404'26'140'134'134'132'170'130'20'130'75'79'79'12'132'56'108'1 4 6 '92'118'133'59'128'40'58'49'20' 4 7 '59'33'10' 6 5 ' 8 6 '165'511'155'154'8 0 '95'103'59'32'2'68'126'149'124'70'53'82'208'382'152'16'17'5'116'18'68'128'80'125'78'125'77'125'54'54'58'126'28'11'19'58'128'8'50'62'128'61'1'70'128'70'62'128'62'58'58'87'137'75'1 8 '125'122'80'134'68'1 8 '134'70'70'70'81'133'70'120'18'67'110'1 8 '123'135'122'18'135'81'18'110'1 8 '81'135'58'58'135'50'50'135'70'70'135'70'70'135'58'58'135'50'50'118'18'9'58'129'80'41'128'72'19'11'71'128'71'71'128'71'71'128'71'69'1 8 '115'82'126'138'68'1 8 '72'138'71'138'71'137'71'137'124'18'69'122'18'67'135'72'80'62'135'62'70'135'70'62'58'135'58'70'62'135'62'62'70'135'70'70'58'135'58'135'58'58'58'70'135'70'62'70'135'70'70'58'58'135'58'68'1 8 '123'80'72'125'113'18'59'125'70'1 8 '112'125'60'125'70'125'70'125'62'125'70'125'58'125'62'125'61'125'70'58'112'18'60'125'72'70'125'70'80'58'125'58'62'70'125'70'62'125'62'70'70'125'58'70'70'58'125'58'57'125'57'70'18'113'125'68'125'62'125'70'125'58'125'70'125'58'125'70'58'125'58'51'125'51'70'58'125'58'70'70'125'70'62'62'125'62'66'6 8 ' 4 0 '18'66'67'70'125'70'125'62'125'64'19 '119'113'18'60'125'72'125'70'70'125'58'58'125'70'70'125'70'70'125'58'58'125'70'70'125'50'50'125'50'50'125'58'58'58'125'58'70'125'70'62'126'6'56'18'44'136'24'81'57'18'121'123'114'70'61'264'135'264'12'58'172'231'279'0.244 ACOUTLOT "M"PARKWAYCENTERLINE CURVE TABLECURVE123456789101112131415161718192021222324RADIUS300.00'300.00'300.00'300.00'300.00'200.00'150.00'275.00'100.00'100.00'300.00'300.00'300.00'300.00'200.00'150.00'300.00'300.00'200.00'200.00'500.00'300.00'300.00'125.00'DateNo Revisions Description E & A CONSULTING GROUP, INC. Engineering · Planning · Environmental & Field Services 10909 Mill Valley Road, Suite 100 · Omaha, NE 68154 Phone: 402.895.4700 · Fax: 402.895.3599 www.eacg.com K:\Projects\2019\334\p01\Planning & Platting\Platting\Prelim Plat\PP-WEST-LAYOUT-000.dwg5/8/2020 2:52 PMRigo Perez PRELIMINARY PLAT ARBOR VIEW LOTS 382 THRU 641 & OUTLOTS "I" THRU "N" OMAHA, NEBRASKA of Drawn By: Designed By: Date: Proj No: Sheet: Scale: P2019.334.001 05/04/2020 JRS RP 1" = 100' 11 LEGAL DESCRIPTIONA TRACT OF LAND LOCATED IN PART OF THE NE1/4 OF THE NW1/4, PART OF THE SE1/4 OF THE NW1/4, PARTOF THE SW1/4 OF THE NW1/4, PART OF THE SW1/4 OF THE NE1/4 AND PART OF THE NW1/4 OF THE SE1/4,ALONG WITH PART OF LOT 1, BRUNING'S FIRST, A SUBDIVISION LOCATED IN PART OF THE SW1/4 AND ALL OFOUTLOT "C", ARBOR VIEW 2ND ADDITION, A SUBDIVISION LOCATED IN PART OF SAID SE1/4, ALL LOCATED INSECTION 01, TOWNSHIP 15 NORTH, RANGE 10 EAST OF THE 6TH P.M., DOUGLAS COUNTY, NEBRASKA.SAID TRACT OF LAND CONTAINS 3,629,740 SQUARE FEET OR 83.327 ACRES, MORE OR LESS.DEVELOPEROWNERCHARLESTON HOMESGOTTSCH FAMILY FARMS3803 N 153RD ST #20020507 NICHOLAS CIR #100OMAHA, NE 68116OMAHA, NE 68022ZONING:EXISTINGAGPROPOSED:R4, LOTS 382-641 53.903 ACDR, O.L. "I"-"N"11.306 AC RIGHT-OF-WAY 18.118 AC TOTAL83.327 ACNOTES:1.DIRECT VEHICULAR ACCESS WILL NOT BE ALLOWED TO FORT STREET FROM ANY LOTS ABUTTING SAIDSTREETS.2.TEMPORARY TURNAROUNDS WILL BE CONSTRUCTED AT ALL DEAD END STREETS.3.CHAMFERS FOR SIDEWALKS ON CORNER LOTS ARE SET AT TWELVE AND HALF FEET (12.5') RADII FROMTHE INTERSECTION OF RIGHT-OF-WAY LINES.4.TYPICAL UTILITY EASEMENTS WILL BE DEDICATED WITH THE FINAL PLAT.5.A STORM SEWER AND DRAINAGE EASEMENT SHALL BE GRANTED OVER ALL OF OUTLOTS "I" THRU "M".6.A GREEN SPACE EASEMENT SHALL BE GRANTED OVER ALL OF OUTLOT "N"7.A 35.0' NO BUILD (EASEMENT) ALONG KESTRAL PARKWAY PER "APPENDIX C: BOULEVARD DESIGNGUIDELINES" PER THE OMAHA SUBURBAN PARK SYSTEM MASTER PLAN, LAST UPDATED 2015.01 inch = ft.100100100ARBOR VIEWLOTS 382 THRU 641 & OUTLOTS "I" THRU "N"A TRACT OF LAND LOCATED IN PART OF THE NE1/4 OF THE NW1/4, PART OF THE SE1/4 OF THE NW1/4, PART OF THE SW1/4 OF THE NW1/4, PARTOF THE SW1/4 OF THE NE1/4 AND PART OF THE NW1/4 OF THE SE1/4, ALONG WITH PART OF LOT 1, BRUNING'S FIRST, A SUBDIVISION LOCATEDIN PART OF THE SW1/4 AND ALL OF OUTLOT "C", ARBOR VIEW 2ND ADDITION, A SUBDIVISION LOCATED IN PART OF SAID SE1/4, ALL LOCATED INSECTION 01, TOWNSHIP 15 NORTH, RANGE 10 EAST OF THE 6TH P.M., DOUGLAS COUNTY, NEBRASKA.PROJECTSITEWEST MAPLE ROADN 216TH STREETN 204TH STREETFORT STREETVICINITY MAPAMES AVE11201122EXIST. MAJOR CONTOURSEXIST. MINOR CONTOURSBUILDING ENVELOPEBOUNDARY LINELOT LINEEASEMENTSLEGENDRIGHT OF WAY LINESANITARY SEWER LINESTORM SEWER LINEPOWER LINE (OVERHEAD)SSSSSTSTOHPOHPFUTURE PROPOSEDPROPERTY LINES SUBJECT AREA IS SHADED - JUNE 2020 R5 R4 R3 R4 R3 R5 R3 R4 AG R4 AG-FF R4 R4 R3 R4 R4 R3 R4 R4 R5 R4 R3 AG-FW R5 AG-FF DR DR R4 R3 AG-FF DR R4R4 R4 R3 R4 AG R4 R4 R3 R5 R3R3 AG-FW R3 R5 R5 R4AG R3 R4 R5 R4 AG SaratogaSt Grand Ave N208th S tN209thSt N207thStMeredithCir A m esA v eO ld C o achRdCa mde nAve N 210th StS e q u o i aStN 207thAveF o w le rAve N 2 13thC irLarimoreAve Plum StN 216th StKe stralPk w y N212thStN 209th AveN 211thStFort St R4 DR DR DR ±0 2,200 Feet 11CASE:C10-20-086,C12-20-087APPLICANT:Charleston Homes, LLCREQUEST:Preliminary Plat approval of ARBOR VIEW (Lots 382-641, Outlots I-N), asubdivision outside city limits, with rezoning from AG to DR and R4LOCATION:Southeast of 216th and Fort Streets