T.DFEio F V ,�l_r
City of Omaha O A A, P'N F B R ?� Robert G.Stubbe,P.E.
Jim Suttle,Mayor Public Works Director
Honorable President
and Members of the City Council,
The attached resolution approves the contract with Navarro Enterprise Construction, Inc. for
OPW 51776,being Emergency Concrete Pavement Repair at Various Locations.
The following bids were received on August 5, 2009. A detailed bid tabulation is attached.
Contractor Total Bid
R&B Excavating, Inc. $254,845.00 (Bid Withdrawn)
NAVARRO ENTERPRISE CONSTRUCTION, INC. $308,600.00 (Recommended Bid)
Swain Construction, Inc. $321,105.00
Daedalus Construction Co. $354,575.00
The low bidder, R & B Excavating, Inc. has withdrawn their bid for this project as detailed in the
attached letter. The Public Works Department recommends award be made to the next bidder,
Navarro Enterprise Construction, Inc.
The contractor has on file a current Contract Compliance Report Form (CC-1). As is City
policy, the Human Rights and Relations Department will review the contractor to ensure
compliance with the Contract Compliance Ordinance.
The Finance Department is authorized to pay the cost of OPW 51776 from the Capital Special
Assessments Fund 13573, Special Assessments Organization 116168, year 2009 expenditures.
The Public Works Department recommends the acceptance of the bid from Navarro Enterprise
Construction, Inc. in the amount of $308,600.00, being the lowest and best bid received, and
requests your consideration and approval of this resolution.
Respectfully submitted, Referre City C cil for Consideration:
-&- 9,-°j to -0) • ,wzvv
obert G. St be, P. . Date Ma r' ffi e II ate
Public Works Director
Approved as to Funding: Approved:
(4/
(7qaifi,e ,
<0, X-o? gibig
Pam Spaccarotella - Date Human Rights and elations Date
Finance Director Department KE
114509scp
Q0 E� 0 W
C ct w a
.5 m WI-
} w N
Ls W N Z 1- asQ cn ce cn U U 2
Q 2 Q 0 c' c cc Z J a. m
0.) CC F- Z -1 W 0 Q Fes- Q
m E 1 Q Q ¢ Q 0 -1 0
o Z cn cn a I- a < W I- Z--
0
0
N
im ;�n.,� �� // .if .` �V7" _/n/�� '•i
e District's current debt ratio is below 10%and the City's Parks and Finance Directors request the payment
Note(4) Neighborhood and/or Trails/Blvd fees shall be paid prior to recording the plat;if reimbursement is required from the City fund,it will be reimbursed to the S&I.D.as monies
are available in the fund and in chronological order of the final plat approval.
Note(5)Soft costs for acquisition include finance,legal,and necessaary survey costs.
Note(6)Soft costs for improvements include Finance,Legal,Design and Project Administration. Revised 7-26-01
Note(7)This money shall reimbursed by the City to the SID,but only if monies become available in the Community Park Fund.
certified costs and letter submitted to the Public Works Department. Such refund shall
be paid within thirty (30) days. The fee shall be paid for all District contracts issued for
public improvements.
N. One hundred percent (100%) of the entire cost of all improvements associated with the
Post Construction Stormwater Management shall be paid privately or by special
assessment against the property benefited within the area to be developed, provided,
5
O
N y m
c co
& d C c6 i/1 N co
2 co oc .c
N
(n
L
ea g E 0 1— 0 _C C Q E �''_
c Y T co co
c y m § Y 0 ' C m m "O
0. m Y g d . E m c y Z. W t m m
Ea a ; o m a co
y d d >
o d o y t m d rn y a c
C.) z m . m a 0 m 2 Z m` < -J a M CD
•
1
e
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
dings and equipment or appreciably
prolong their intended life shall be treated as capital expenditures (see paragraph 15).
28.Materials and supplies costs.
a. Costs incurred for materials. suoolies. and fabricated oarts necessary to carry out a Federal award are
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
s
performed in each building on the basis of usable square feet of space,excluding common areas,
such as hallways, stairwells,and restrooms.
(c) Depreciation or use allowances on buildings, capital improvements and equipment related space
(e.g., individual rooms, and laboratories) used jointly by more than one function(as determined by the
a—....a—J L.-11...,,- TL,. -• L. :..:•.a1........J
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
IIMAHA'NFd
,� Public Works Department
(� `�� �
R°fli �i •
Omaha/Douglas Civic Center
• • �� ��( �{�� � 1819 Farnam Street,Suite 601
p�. ,.. _ry Omaha,Nebraska 68183-0601
ti (402) 444-5220
o� Q• Fax(402)444-5248
"'rE D FEBR"r
City of Omaha Robert G. Stubbe,P.E.
Jim Suttie,Mayor Public Works Director
August 24, 2009
R & B Construction
8225 S 107th Street 1
' LaVista, NE 68128
. Attn: John
Re: OPW 51776
Emergency Panel Repair Contract
Dear John:
Recently, you and I had a telephone conversation where you requested the City of
Omaha Public Works Department release R & B Construction's bid for OPW 51776,
Emergency Panel Repair Contract.
This letter serves as R & B's notice that you have two (2) business days to notify the
Construction Division in writing of said release.
In the event a written request is not received within these two (2) business days, this
letter shall serve as R & B's confirmation for requesting a release from the above- .
mentioned contract.
•
If you have any questions, do not hesitate to contact me at 444-5280.
Sincerely,
90,14,0e A 01
David A. Noonan
Manager
Sidewalk Section
C: Tim O'Bryan, Construction Engineer
Harald Flatoen, General Services Engineer
he Finance Department is authorized to pay the cost of OPW 51776 from the Capital Special
Assessments Fund 13573, Special Assessments Organization 116168, year 2009 expenditures.
The Public Works Department recommends the acceptance of the bid from Navarro Enterprise
Construction, Inc. in the amount of $308,600.00, being the lowest and best bid received, and
requests your consideration and approval of this resolution.
Respectfully submitted, Referre City C cil for Consideration:
-&- 9,-°j to -0) • ,wzvv
obert G. St be, P. . Date Ma r' ffi e II ate
Public Works Director
Approved as to Funding: Approved:
(4/
(7qaifi,e ,
<0, X-o? gibig
Pam Spaccarotella - Date Human Rights and elations Date
Finance Director Department KE
114509scp
Q0 E� 0 W
C ct w a
.5 m WI-
} w N
Ls W N Z 1- asQ cn ce cn U U 2
Q 2 Q 0 c' c cc Z J a. m
0.) CC F- Z -1 W 0 Q Fes- Q
m E 1 Q Q ¢ Q 0 -1 0
o Z cn cn a I- a < W I- Z--
0
0
N
im ;�n.,� �� // .if .` �V7" _/n/�� '•i
e District's current debt ratio is below 10%and the City's Parks and Finance Directors request the payment
Note(4) Neighborhood and/or Trails/Blvd fees shall be paid prior to recording the plat;if reimbursement is required from the City fund,it will be reimbursed to the S&I.D.as monies
are available in the fund and in chronological order of the final plat approval.
Note(5)Soft costs for acquisition include finance,legal,and necessaary survey costs.
Note(6)Soft costs for improvements include Finance,Legal,Design and Project Administration. Revised 7-26-01
Note(7)This money shall reimbursed by the City to the SID,but only if monies become available in the Community Park Fund.
certified costs and letter submitted to the Public Works Department. Such refund shall
be paid within thirty (30) days. The fee shall be paid for all District contracts issued for
public improvements.
N. One hundred percent (100%) of the entire cost of all improvements associated with the
Post Construction Stormwater Management shall be paid privately or by special
assessment against the property benefited within the area to be developed, provided,
5
O
N y m
c co
& d C c6 i/1 N co
2 co oc .c
N
(n
L
ea g E 0 1— 0 _C C Q E �''_
c Y T co co
c y m § Y 0 ' C m m "O
0. m Y g d . E m c y Z. W t m m
Ea a ; o m a co
y d d >
o d o y t m d rn y a c
C.) z m . m a 0 m 2 Z m` < -J a M CD
•
1
e
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
dings and equipment or appreciably
prolong their intended life shall be treated as capital expenditures (see paragraph 15).
28.Materials and supplies costs.
a. Costs incurred for materials. suoolies. and fabricated oarts necessary to carry out a Federal award are
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
s
performed in each building on the basis of usable square feet of space,excluding common areas,
such as hallways, stairwells,and restrooms.
(c) Depreciation or use allowances on buildings, capital improvements and equipment related space
(e.g., individual rooms, and laboratories) used jointly by more than one function(as determined by the
a—....a—J L.-11...,,- TL,. -• L. :..:•.a1........J
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
Aug.26.2009 03: 44 PM PAGE. 1/ 1
•
it F B Excavating
ttzzd South 11111'"Street
s l.'ia/:,,. ]I Illt'Q att
Dave Noonan
City of Omaha
1819 Farnam Street
Omaha, NE
RE: Emergency Repair
OPW 51776
Please be advised that we are requesting our bid to be withdrawn from consideration for this
project.
Sincerely,
John Main
R & B Excavating
0 Z ." n (-? .
•
t.
c"
. I
uite 101.
That, the cost of publication of notice of the hearing was $26.00.
September 22, 2009 - Resolution No. 1087 - Motion to adopt. Carried 6-0.
By 4V4, 1
Councilmember
Adopted SEP 2,2 2009 G - 0'
ity C1e
Approved. ..0—/
ayor
City Clerk
Approve . . .
ACTING Mayor
.
-4-
NAVARRO ENTERPRISE CONSTRUCTION INC.
COMMERCIAL.& RESIDENTIAL CONCRETE / DEMOUTION / CLEARING / HAULING
•
September 8, 2009
City of Omaha
Omaha Public Works Department
1819 Farnam Street
Omaha,NE 68183
Attn: Dave Noonan
Dear Dave,
Should the contract for OPW51776 2009 Emergency Concrete Repair at Various
Locations within the City of Omaha contract be offered,Navarro Enterprise
Construction,Inc. would accept the contract per our submitted bid amount of
$308,600.00.
Thank you for your consideration.
Sincerely,
John Navarro /
President ct�---
•
2914 "R" STREET OMAHA NE, 68107 OFFICE(402) 734.6156 FAX(402) 8844269
7A/7P "qgH.-1 ggT?AN-P I Nq fINNHAHN aQ7Cb0Q7fab T» 'nT 7 Jcn /cn
SEP 2,2 2009 G - 0'
ity C1e
Approved. ..0—/
ayor
City Clerk
Approve . . .
ACTING Mayor
.
-4-
F
Bid Tabulation
•
Public Works Department
Omaha, Nebraska
Wednesday, August 05, 2009
Project Summary
OPW 51776 English Yes
Metric: No
Description: 2009 Emergency Concrete Repair at Various Locations within the City of Omaha
Start Date: Completion Date:
Labor Release Date:
Field Book Number: Test Core Lengths:
Council Resolution: Adoption Date:
Percent Reserve Due: 10.0%
Percent Complete: 0.0% Percent Time Used: 0.0%
Engineer's Total: $381,937.50
Contract Total $0.00
Total Penalties: $0.00
Total Payments: $0.00
Contractor:
Phone#:
•
Fax#:
Email address:
•
Page 1 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by:admin for project OPW 51776
Approve . . .
ACTING Mayor
.
-4-
•
Account/Funding Summary
Fund Org. Description Engineer Contract Penalties . Payments
544 1485 Sanitary Sewer Improvements $381,937.50 $0.00 $0.00 $0.00
$381,937.50 $0.00 $0.00 $0.00
•
•
Page 2 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by:admin for project OPW 51776
e Lengths:
Council Resolution: Adoption Date:
Percent Reserve Due: 10.0%
Percent Complete: 0.0% Percent Time Used: 0.0%
Engineer's Total: $381,937.50
Contract Total $0.00
Total Penalties: $0.00
Total Payments: $0.00
Contractor:
Phone#:
•
Fax#:
Email address:
•
Page 1 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by:admin for project OPW 51776
Approve . . .
ACTING Mayor
.
-4-
•
Bid Summary (low to high bidder)
Contractor
Engineer's Estimate: $381,937.50
Diff From Low: $127,092.50
R&B Excavating,Inc. Bid: $254,845.00
8225 South 107th Street Diff From Low: $0.00
LaVista NE 68128-
Navarro Enterprise Construction,Inc. Bid: $308,600.00
2914"R"Street Diff From Low: $53,755.00
Omaha NE 68107-
Swain Construction,Inc. Bid: $321,105..00
6002 North 89th Circle Diff From Low: $66,260.00
Omaha NE 68134-
Daedalus Construction Company Bid: $354,575.00
4229 Lafayette Avenue Diff From Low: $99,730.00
Omaha NE 68131-1025
Number of Bids: 4
Low Bid: $254,845.00
High Bid: $354,575.00
Average Bid:: $309,781.25
•
•
•
•
•
•
Page 3 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by:admin for project OPW 51776
R & B's confirmation for requesting a release from the above- .
mentioned contract.
•
If you have any questions, do not hesitate to contact me at 444-5280.
Sincerely,
90,14,0e A 01
David A. Noonan
Manager
Sidewalk Section
C: Tim O'Bryan, Construction Engineer
Harald Flatoen, General Services Engineer
he Finance Department is authorized to pay the cost of OPW 51776 from the Capital Special
Assessments Fund 13573, Special Assessments Organization 116168, year 2009 expenditures.
The Public Works Department recommends the acceptance of the bid from Navarro Enterprise
Construction, Inc. in the amount of $308,600.00, being the lowest and best bid received, and
requests your consideration and approval of this resolution.
Respectfully submitted, Referre City C cil for Consideration:
-&- 9,-°j to -0) • ,wzvv
obert G. St be, P. . Date Ma r' ffi e II ate
Public Works Director
Approved as to Funding: Approved:
(4/
(7qaifi,e ,
<0, X-o? gibig
Pam Spaccarotella - Date Human Rights and elations Date
Finance Director Department KE
114509scp
Q0 E� 0 W
C ct w a
.5 m WI-
} w N
Ls W N Z 1- asQ cn ce cn U U 2
Q 2 Q 0 c' c cc Z J a. m
0.) CC F- Z -1 W 0 Q Fes- Q
m E 1 Q Q ¢ Q 0 -1 0
o Z cn cn a I- a < W I- Z--
0
0
N
im ;�n.,� �� // .if .` �V7" _/n/�� '•i
e District's current debt ratio is below 10%and the City's Parks and Finance Directors request the payment
Note(4) Neighborhood and/or Trails/Blvd fees shall be paid prior to recording the plat;if reimbursement is required from the City fund,it will be reimbursed to the S&I.D.as monies
are available in the fund and in chronological order of the final plat approval.
Note(5)Soft costs for acquisition include finance,legal,and necessaary survey costs.
Note(6)Soft costs for improvements include Finance,Legal,Design and Project Administration. Revised 7-26-01
Note(7)This money shall reimbursed by the City to the SID,but only if monies become available in the Community Park Fund.
certified costs and letter submitted to the Public Works Department. Such refund shall
be paid within thirty (30) days. The fee shall be paid for all District contracts issued for
public improvements.
N. One hundred percent (100%) of the entire cost of all improvements associated with the
Post Construction Stormwater Management shall be paid privately or by special
assessment against the property benefited within the area to be developed, provided,
5
O
N y m
c co
& d C c6 i/1 N co
2 co oc .c
N
(n
L
ea g E 0 1— 0 _C C Q E �''_
c Y T co co
c y m § Y 0 ' C m m "O
0. m Y g d . E m c y Z. W t m m
Ea a ; o m a co
y d d >
o d o y t m d rn y a c
C.) z m . m a 0 m 2 Z m` < -J a M CD
•
1
e
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
dings and equipment or appreciably
prolong their intended life shall be treated as capital expenditures (see paragraph 15).
28.Materials and supplies costs.
a. Costs incurred for materials. suoolies. and fabricated oarts necessary to carry out a Federal award are
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
s
performed in each building on the basis of usable square feet of space,excluding common areas,
such as hallways, stairwells,and restrooms.
(c) Depreciation or use allowances on buildings, capital improvements and equipment related space
(e.g., individual rooms, and laboratories) used jointly by more than one function(as determined by the
a—....a—J L.-11...,,- TL,. -• L. :..:•.a1........J
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
4
Type Line# Item # Description Quantity Price Total
• 1 104.001 EARTHWORK(EMBANKMENT)
Engineeer's Estimate 800 @ $12.00 per CY $9,600.00
R&B Excavating, Inc. $3.00 per CY $2,400.00
Navarro Enterprise Construction,Inc. $11.00 per CY $8,800.00
Swain Construction, Inc. $9.25 per CY $7,400.00
Daedalus Construction Company $10.00 per CY $8,000.00
2 202.005 CONSTRUCT COMBINATION CURB AND GUTTER
Engineeer's Estimate 300 @ $15.75 per LF $4,725.00
R&B Excavating, Inc. $18.20 per LF $5,460.00
Navarro Enterprise Construction, Inc. $15.00 per LF $4,500.00
Swain Construction, Inc. •$10.00 per LF $3,000.00
Daedalus Construction Company $22.00 per LF $6,600.00
3 204.100 CONSTRUCT CONCRETE CURB RAMP •
Engineeer's Estimate . 2000 @ $8.50 per SF $17,000.00
R&B Excavating, Inc. $4.95 per SF $9,900.00
Navarro Enterprise Construction, Inc. $5.75 per SF $11,500.00
Swain Construction, Inc. $6.47 per SF $12,940.00
Daedalus Construction Company $8.00 per SF $16,000.00
4 300.004 SAW CUT-FULL DEPTH
Engineeer's Estimate 1500 @ $3.05 per LF $4,575.00
R&B Excavating, Inc. $2.95 per LF $4,425.00
Navarro Enterprise Construction, Inc. $3.00 per LF $4,500.00
•
Swain Construction, Inc. $3.00 per LF $4,500.00
Daedalus Construction Company $3.50 per LF $5,250.00
5 307.006 REPAIR 4"CONCRETE SIDEWALK
Engineeer's Estimate 4000 @ $4.10 per SF $16,400.00
R&B Excavating, Inc. $2.88 per SF $11,520.00
Navarro Enterprise Construction, Inc. $3.25 per SF $13,000.00
Swain Construction, Inc. $3.65 per SF $14,600.00
Daedalus Construction Company $3.25 per SF $13,000.00
•
6 307.406 CONCRETE PAVEMENT REPAIR-TYPE L85-FULL DEPTH-6"
Engineeer's Estimate 175 @ $45.00 per SY $7,875.00
R&B Excavating, Inc. $34.00 per SY $5,950.00
Navarro Enterprise Construction, Inc. $30.00 per SY $5,250.00
Swain Construction, Inc. $41.62 per SY $7,283.50
Daedalus Construction Company $36.00 per SY $6,300.00
• 7 307.407 CONCRETE PAVEMENT REPAIR-TYPE L85-FULL DEPTH-7"
Engineeer's Estimate 500 @ $48.50 per SY $24,250.00
R&B Excavating, Inc. $37.60 per SY $18,800.00
Navarro Enterprise Construction, Inc. $37.00 per SY $18,500.00 .
Swain Construction, Inc. $44.40 per SY $22,200.00
Daedalus Construction Company $42.00 per SY $21,000.00
8 307.409 CONCRETE PAVEMENT REPAIR-TYPE L85-FULL DEPTH-9"
Engineeer's Estimate 3500 @ $58.00 per SY $203,000.00
R&B Excavating, Inc. $44.20 per SY $154,700.00
Navarro Enterprise Construction, Inc. $49.50 per SY $173,250.00
Swain Construction, Inc. $48.56 per SY $169,960.00
Daedalus Construction Company ' $54.00 per SY $189,000.00
Page 4 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by:admin for project OPW 51776
Finance,Legal,Design and Project Administration. Revised 7-26-01
Note(7)This money shall reimbursed by the City to the SID,but only if monies become available in the Community Park Fund.
certified costs and letter submitted to the Public Works Department. Such refund shall
be paid within thirty (30) days. The fee shall be paid for all District contracts issued for
public improvements.
N. One hundred percent (100%) of the entire cost of all improvements associated with the
Post Construction Stormwater Management shall be paid privately or by special
assessment against the property benefited within the area to be developed, provided,
5
O
N y m
c co
& d C c6 i/1 N co
2 co oc .c
N
(n
L
ea g E 0 1— 0 _C C Q E �''_
c Y T co co
c y m § Y 0 ' C m m "O
0. m Y g d . E m c y Z. W t m m
Ea a ; o m a co
y d d >
o d o y t m d rn y a c
C.) z m . m a 0 m 2 Z m` < -J a M CD
•
1
e
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
dings and equipment or appreciably
prolong their intended life shall be treated as capital expenditures (see paragraph 15).
28.Materials and supplies costs.
a. Costs incurred for materials. suoolies. and fabricated oarts necessary to carry out a Federal award are
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
s
performed in each building on the basis of usable square feet of space,excluding common areas,
such as hallways, stairwells,and restrooms.
(c) Depreciation or use allowances on buildings, capital improvements and equipment related space
(e.g., individual rooms, and laboratories) used jointly by more than one function(as determined by the
a—....a—J L.-11...,,- TL,. -• L. :..:•.a1........J
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
Type Line# Item# Description Quantity Price Total
• 9 307.411 CONCRETE PAVEMENT REPAIR-TYPE L85-FULL DEPTH-11"
Engineeer's Estimate 200 @ $60.00 per SY $12,000.00
R&B Excavating, Inc. $49.20 per SY $9,840.00
Navarro Enterprise Construction, Inc. $54.00 per SY $10,800.00
Swain Construction, Inc. $50.87 per SY $10,174.00.
Daedalus Construction Company $56.00 per SY $11,200.00
10 605.000 SODDING
Engineeer's Estimate 225 @ $6.50 per SY $1,462.50
R&B Excavating, Inc. $6.00 per SY • $1,350.00
Navarro Enterprise Construction, Inc. $5.00 per SY $1,125.00
•
Swain Construction, Inc. $3.70 per SY $832.50
Daedalus Construction Company $5.00 per SY $1,125.00
11 701.100 CONSTRUCT SEGMENTAL RETAINING WALL
Engineeer's Estimate 500 @ $25.00 per SF $12,500.00
R&B Excavating, Inc. $17.10 per SF $8,550.00
Navarro Enterprise Construction, Inc. $13.00 per SF $6,500.00
Swain Construction, Inc. $19.00 per SF $9,500.00
Daedalus Construction Company $21.00 per SF $10,500.00
12 900.012 STREET BRICK REPAIR
Engineeer's Estimate 500 @ $47.50 per SY $23,750.00
R&B Excavating, Inc. $22.00 per SY $11,000.00
Navarro Enterprise Construction, Inc. $38.00 •per SY $19,000.00
Swain Construction,Inc. $40.00 per SY $20,000.00
Daedalus Construction Company $55.00 per SY $27,500.00
13 900.013 STREET BRICK SUBGRADE REPAIR
Engineeer's Estimate 500 @ $60.00 per SY $30,000.00
R•&B Excavating, Inc. $1.20 per SY $600.00
Navarro Enterprise Construction, Inc. . $45.00 per SY $22,500.00
Swain Construction, Inc. $55.50 per SY $27,750.00
Daedalus Construction Company $45.00 per SY $22,500.00
14 900.014 PRECAST INSERT PANELS
I Engineeer's Estimate 20 @ $165.00 EACH $3,300.00
R&B Excavating, Inc. $100.00 EACH $2,000.00
Navarro Enterprise Construction, Inc. $150.00 EACH $3,000.00
Swain Construction, Inc. $148.00 EACH $2,960.00
Daedalus Construction Company $230.00 EACH $4,600.00
15 900.015 COBBLESTONE STAMPED CONCRETE
• Engineeer's Estimate 1000 @ $5.25 per SF $5,250.00
R&B Excavating, Inc. $4.60 per SF $4,600.00
Navarro Enterprise Construction, Inc. $4.50 per SF $4,500.00
Swain Construction, Inc. $5.63 per SF $5,630.00
Daedalus Construction Company $7.00 per SF $7,000.00
16 900.016 UTILITY ADJUSTMENT
Engineeer's Estimate 25 @ $250.00 EACH $6,250.00
R&B Excavating, Inc. $150.00 EACH $3,750.00
Navarro Enterprise Construction, Inc. $75100 EACH $1,875.00
•
Swain Construction, Inc. $95.00 EACH $2,375.00
Daedalus Construction Company $200.00 EACH $5,000.00
Page 5 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by: admin for project OPW 51776
$189,000.00
Page 4 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by:admin for project OPW 51776
Finance,Legal,Design and Project Administration. Revised 7-26-01
Note(7)This money shall reimbursed by the City to the SID,but only if monies become available in the Community Park Fund.
certified costs and letter submitted to the Public Works Department. Such refund shall
be paid within thirty (30) days. The fee shall be paid for all District contracts issued for
public improvements.
N. One hundred percent (100%) of the entire cost of all improvements associated with the
Post Construction Stormwater Management shall be paid privately or by special
assessment against the property benefited within the area to be developed, provided,
5
O
N y m
c co
& d C c6 i/1 N co
2 co oc .c
N
(n
L
ea g E 0 1— 0 _C C Q E �''_
c Y T co co
c y m § Y 0 ' C m m "O
0. m Y g d . E m c y Z. W t m m
Ea a ; o m a co
y d d >
o d o y t m d rn y a c
C.) z m . m a 0 m 2 Z m` < -J a M CD
•
1
e
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
dings and equipment or appreciably
prolong their intended life shall be treated as capital expenditures (see paragraph 15).
28.Materials and supplies costs.
a. Costs incurred for materials. suoolies. and fabricated oarts necessary to carry out a Federal award are
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
s
performed in each building on the basis of usable square feet of space,excluding common areas,
such as hallways, stairwells,and restrooms.
(c) Depreciation or use allowances on buildings, capital improvements and equipment related space
(e.g., individual rooms, and laboratories) used jointly by more than one function(as determined by the
a—....a—J L.-11...,,- TL,. -• L. :..:•.a1........J
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
Type Line# Item # Description Quantity . Price Total
(LINES 1 Through 16 INCLUSIVE)
Bid Tabulation, generated dmi n 8/ 2 9 11:23:40 AM for project OPW 51776
p
CERTIFIED BY: '/J DATE: D (/
<1/
•
•
Page 6 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by:admin for project OPW 51776
W 51776
e Lengths:
Council Resolution: Adoption Date:
Percent Reserve Due: 10.0%
Percent Complete: 0.0% Percent Time Used: 0.0%
Engineer's Total: $381,937.50
Contract Total $0.00
Total Penalties: $0.00
Total Payments: $0.00
Contractor:
Phone#:
•
Fax#:
Email address:
•
Page 1 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by:admin for project OPW 51776
Approve . . .
ACTING Mayor
.
-4-
C-25A ,
- '- - CITY OF OMAHA
,.. ,,,__ • LEGISLATIVE CHAMBER
Omaha,Nebraska
RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA:
WHEREAS, bids were submitted on August 5, 2009 for OPW 51776, being Emerkency
_ .
Concrete Pavement Repair at Various Locations; and,
• ,
WHEREAS, Navarro Enterprise Construction, Inc. submitted a bid',of$308,600.00, being
the lowest and best bid received for OPW 51776.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF OMAHA:
THAT, as recommended by the Mayor, the contract with Navarro Enterprise
Construction, Inc. for OPW 51776, being Emergency Concrete Pavement Repair at Various
Locations in the amount of$308,600.00 is hereby approved; and that the Finance Department is
authorized to pay this cost from the Capital Special Assessments Fund 13573, Special
Assessments Organization 116168, year 2009 expenditures.
114609scp APPROVED AS TO FORM:
CITY ATTORNEY DATE
%<:7•
i
ByA7,,,VI WeiLstwirtar.
Councilmember
Adopted P 2 2 2°99-
ceilly*
Mayor
Daedalus Construction Company $21.00 per SF $10,500.00
12 900.012 STREET BRICK REPAIR
Engineeer's Estimate 500 @ $47.50 per SY $23,750.00
R&B Excavating, Inc. $22.00 per SY $11,000.00
Navarro Enterprise Construction, Inc. $38.00 •per SY $19,000.00
Swain Construction,Inc. $40.00 per SY $20,000.00
Daedalus Construction Company $55.00 per SY $27,500.00
13 900.013 STREET BRICK SUBGRADE REPAIR
Engineeer's Estimate 500 @ $60.00 per SY $30,000.00
R•&B Excavating, Inc. $1.20 per SY $600.00
Navarro Enterprise Construction, Inc. . $45.00 per SY $22,500.00
Swain Construction, Inc. $55.50 per SY $27,750.00
Daedalus Construction Company $45.00 per SY $22,500.00
14 900.014 PRECAST INSERT PANELS
I Engineeer's Estimate 20 @ $165.00 EACH $3,300.00
R&B Excavating, Inc. $100.00 EACH $2,000.00
Navarro Enterprise Construction, Inc. $150.00 EACH $3,000.00
Swain Construction, Inc. $148.00 EACH $2,960.00
Daedalus Construction Company $230.00 EACH $4,600.00
15 900.015 COBBLESTONE STAMPED CONCRETE
• Engineeer's Estimate 1000 @ $5.25 per SF $5,250.00
R&B Excavating, Inc. $4.60 per SF $4,600.00
Navarro Enterprise Construction, Inc. $4.50 per SF $4,500.00
Swain Construction, Inc. $5.63 per SF $5,630.00
Daedalus Construction Company $7.00 per SF $7,000.00
16 900.016 UTILITY ADJUSTMENT
Engineeer's Estimate 25 @ $250.00 EACH $6,250.00
R&B Excavating, Inc. $150.00 EACH $3,750.00
Navarro Enterprise Construction, Inc. $75100 EACH $1,875.00
•
Swain Construction, Inc. $95.00 EACH $2,375.00
Daedalus Construction Company $200.00 EACH $5,000.00
Page 5 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by: admin for project OPW 51776
$189,000.00
Page 4 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by:admin for project OPW 51776
Finance,Legal,Design and Project Administration. Revised 7-26-01
Note(7)This money shall reimbursed by the City to the SID,but only if monies become available in the Community Park Fund.
certified costs and letter submitted to the Public Works Department. Such refund shall
be paid within thirty (30) days. The fee shall be paid for all District contracts issued for
public improvements.
N. One hundred percent (100%) of the entire cost of all improvements associated with the
Post Construction Stormwater Management shall be paid privately or by special
assessment against the property benefited within the area to be developed, provided,
5
O
N y m
c co
& d C c6 i/1 N co
2 co oc .c
N
(n
L
ea g E 0 1— 0 _C C Q E �''_
c Y T co co
c y m § Y 0 ' C m m "O
0. m Y g d . E m c y Z. W t m m
Ea a ; o m a co
y d d >
o d o y t m d rn y a c
C.) z m . m a 0 m 2 Z m` < -J a M CD
•
1
e
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
dings and equipment or appreciably
prolong their intended life shall be treated as capital expenditures (see paragraph 15).
28.Materials and supplies costs.
a. Costs incurred for materials. suoolies. and fabricated oarts necessary to carry out a Federal award are
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
s
performed in each building on the basis of usable square feet of space,excluding common areas,
such as hallways, stairwells,and restrooms.
(c) Depreciation or use allowances on buildings, capital improvements and equipment related space
(e.g., individual rooms, and laboratories) used jointly by more than one function(as determined by the
a—....a—J L.-11...,,- TL,. -• L. :..:•.a1........J
http://www.whitehouse.gov/omb/circulars/a122/a 122_2004.html 7/19/2006
1
k.
+NcnCDp �N O O
^=
o ° �a a
CO `MI 64 vl cA' ,-• ° El '* O
� - , c00 . va NI CD
0 0 0 < a'' () g ,g 03 '\...
- CND p 0 LA x
llID ' i. i
I CD
pr
l
z
t, :t
- •• . - a - - �� -
0.0% Percent Time Used: 0.0%
Engineer's Total: $381,937.50
Contract Total $0.00
Total Penalties: $0.00
Total Payments: $0.00
Contractor:
Phone#:
•
Fax#:
Email address:
•
Page 1 of 6, 8/5/2009 11:23:40 AM, Bid Tabulation, Generated by:admin for project OPW 51776