Loading...
RES 2009-1473 - Contract with LG Roloff Construction Co Inc for OPW 50986 (CSO), 42nd and X St area sewer separation project (6r,ANHA,Ar4e � Public Works Department ; i`,� � {i ,r 1 i r, Omaha/Douglas Gvic Center y ,.- �r�'' 1819 Famam Street,Suite 601 �hjint!)'-ik ,. . 1 1 p1 1: Omaha,Nebraska 68183-0601 ,,,•' �,®4' 1 °� ; December 221 200 , 3 (402)444 5220 1i0 _ ro ^ Fax(402)444-5248 41'FD FEBR 01�'A M1:c; City of Omaha ' �' ` J Robert G.Stubbe,P.E. Jim Suttle,Mayor Public Works Director Honorable President and Members of the City Council, The attached Resolution approves the contract with L. G. Roloff Construction Co., Inc. for OPW 50986 (CSO),being 42nd Street and"X" Street Area Sewer Separation Project. The following bids were received on November 4, 2009. A detailed bid tabulation is attached. Contractor Total Bid L.G. ROLOFF CONSTRUCTION CO., INC. $ 970,228.58 (LOW BID) Luxa Construction Co., Inc. $1,134,950.45 Hawkins Construction Co. $1,173,746.53 Cedar Construction $1,191,364.25 Heimes Corp. $1,362,102.07 Anderson Excavating Co. $1,528,955.70 General Excavating $1,573,167.20 K-2 Construction $1,575,625.83 The contractor has on file a current Contract Compliance Report Form (CC-1). As is City policy, the Human Rights and Relations Director will review the contractor to ensure compliance with the Contract Compliance Ordinance. The Finance Depaitinent is authorized to obligate $970,228.58 from the Sewer Revenue Improvement Fund 21124, CSO Control Implementation Organization 116918 with the provision that upon closing of the pending SRF/ARRA loan contract with the Nebraska Department of Environmental Quality the funds will be paid from the ARRA CSO Control Implementation Fund 17117, ARRA OPW 50986 42nd & "X" Street Organization 117752. The Public Works Department recommends the acceptance of the bid from L.G. Roloff Construction Co., Inc., being the lowest and best bid received, and requests your consideration and approval of this Resolution. 6 Res ully submitted, e eferred to ity C cil or Consideration: , _i_, /2 - v-07 ert G. S ubbe, P. Date May ' fic Date ublic Works Director Appro ed as to Funding: Approved: / /109 dst_. y% C`met/l�e•c r Pam.Spaccarotella/ r was Date Human Rights a Relations Date Finance Director sty 1:00 Depat tnientAL) 12. ,14, 122309scp Co m.:',Pc)-3:''Z P.' t81 i.3 REMSIOND — CHARLES DREW CENTER ADDITION '''I ^ r SSg NO._ DESCRIPDON DATE I BY CI i -B` ;;0 FINAL PLAT € . 30TH & GRANT STREETS : o—> OMAHA, NEBRASKA € „° mw — , 1 NDOR Nebraska Paae 8 of 8 • July 2008 Department of Roads d southwest sides is not part of any specific planning project document, however Saddlebrook Park is identified as a future regional park in the Omaha Suburban Parks Master Plan which was developed by the City of Omaha Parks,Recreation&Public Property Department. Selected pages from this document are attached with this application. NDOR Nebraska Panes 7 of R July 2nnR Deoartment of Roads n increase in the number of students attending the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Bid Tabulation • Public Works Department . Omaha, Nebraska Wednesday, November 04, 2009 Project Summary OPW 50986 English Yes Metric: No Description: South 42nd Street and"X"Street Area Sewer Separation Project(CSO) Start Date: Completion Date: Labor Release Date: Field Book Number: Test Core Lengths: Council Resolution: Adoption Date: Percent Reserve Due: 10.0% Percent Complete: 0.0% Percent Time Used: 0.0% Engineer's Total: $1,443,538.80 Contract Total $0.00 Total Penalties: $0.00 Total Payments: $0.00 Contractor: Phone#: Fax#: Email address: • • Page 1 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 ft, Approvei`�`�=' J Mayor p C"uo, � � C or ' Account/Funding Summary Fund Org. Description Engineer Contract Penalties Payments 21124 116918 Sanitary Sewer Improvement(CSO) $1,443,538.80 $0.00 $0.00 $0.00 $1,443,538.80 $0.00 $0.00 $0.00 Page 2 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 Book Number: Test Core Lengths: Council Resolution: Adoption Date: Percent Reserve Due: 10.0% Percent Complete: 0.0% Percent Time Used: 0.0% Engineer's Total: $1,443,538.80 Contract Total $0.00 Total Penalties: $0.00 Total Payments: $0.00 Contractor: Phone#: Fax#: Email address: • • Page 1 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 ft, Approvei`�`�=' J Mayor p C"uo, � � C or Bid Summary(low to high bidder) Contractor Engineer's Estimate: $1,443,538.80 • Diff From Low: $473,310.22 L.G. Roloff Construction Company,Inc. Bid: $970,228.58 10204 South 152nd Street Diff From Low: $0.00 Omaha NE 68138-3866 Luxa Construction Co.,Inc. Bid: $1,134,950.45 925 E. Dixon Rd.,PO Box 105 Diff From Low: $164,721.87 Blair NE 68008- Hawkins Construction Co. Bid: $1,173,746.53 2516 Deer Park Boulevard Diff From Low: $203,517.95 Omaha NE 68105- Cedar Construction Bid: $1,191,364.25'' 13901 "L"ST. Diff From Low: $221,135.67 Omaha NE 68137- Heimes Corp. Bid: $1,362,102.07 9144 S. 147th St. Diff From Low: $391,873.49 Omaha NE 68138- Anderson ExcavatingCo. Bid: $1,528,955.70 1824 S.20th St. Diff From Low: $558,727.12 Omaha NE 68108- General Excavating Bid: $1,573,167.20 6701 Cornhusker Highway Diff From Low: $602,938.62 Lincoln NE 68507- K-2 Construction Bid: $1,575,625.83 %-` 7701 Cornhusker Highway Diff From Low: $605,397.25 Lincoln NE 68507- Number of Bids: 8 Low Bid: $970,228.58 High Bid: $1,575,625.83 Average Bid:: $1,313,767.58 Corrected Total Page 3 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 the pending SRF/ARRA loan contract with the Nebraska Department of Environmental Quality the funds will be paid from the ARRA CSO Control Implementation Fund 17117, ARRA OPW 50986 42nd & "X" Street Organization 117752. The Public Works Department recommends the acceptance of the bid from L.G. Roloff Construction Co., Inc., being the lowest and best bid received, and requests your consideration and approval of this Resolution. 6 Res ully submitted, e eferred to ity C cil or Consideration: , _i_, /2 - v-07 ert G. S ubbe, P. Date May ' fic Date ublic Works Director Appro ed as to Funding: Approved: / /109 dst_. y% C`met/l�e•c r Pam.Spaccarotella/ r was Date Human Rights a Relations Date Finance Director sty 1:00 Depat tnientAL) 12. ,14, 122309scp Co m.:',Pc)-3:''Z P.' t81 i.3 REMSIOND — CHARLES DREW CENTER ADDITION '''I ^ r SSg NO._ DESCRIPDON DATE I BY CI i -B` ;;0 FINAL PLAT € . 30TH & GRANT STREETS : o—> OMAHA, NEBRASKA € „° mw — , 1 NDOR Nebraska Paae 8 of 8 • July 2008 Department of Roads d southwest sides is not part of any specific planning project document, however Saddlebrook Park is identified as a future regional park in the Omaha Suburban Parks Master Plan which was developed by the City of Omaha Parks,Recreation&Public Property Department. Selected pages from this document are attached with this application. NDOR Nebraska Panes 7 of R July 2nnR Deoartment of Roads n increase in the number of students attending the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type . Line# Item # Description Quantity Price Total 1 100.000 CLEARING AND GRUBBING GENERAL • Engineeer's Estimate 1 @ $75,000.00 per LS $75,000.00 L. G. Roloff Construction Company, Inc. $30,000.00 per LS $30,000.00 Luxa Construction Co., Inc. $34,570.00 per LS $34,570.00 I Hawkins Construction Co. $160,531.42 per LS $160,531.42 Cedar Construction • $7,500.00 per LS $7,500.00 Heimes Corp. $12,544.73 per LS $12,544.73 Anderson Excavating Co. $100,000.00 per LS $100,000.00 General Excavating $77,726.00 per LS $77,726.00 K-2 Construction' $16,250.00 per LS $16,250.00 2 101.000 CLEARING AND GRUBBING TREES OVER 9"TO 18"DIAMETER Engineeer's Estimate 88 @ $375.00 EACH $33,000.00 L.G. Roloff Construction Company, Inc. • $55.00 EACH $4,840.00 Luxa Construction Co.; Inc. $211.00 EACH $18,568.00 Hawkins Construction Co. $314.13 EACH $27,643.44 Cedar Construction $330.00 EACH $29,040.00 Heimes Corp. $231.39 EACH $20,362.32 • Anderson Excavating Co. $300.00 EACH $26,400.00 General Excavating $580.00 EACH $51,040.00 K-2 Construction • $172.50 EACH $15,180.00 3 101.001 CLEARING AND GRUBBING TREES OVER 18"TO 27"DIAMETER Engineeer's Estimate 26 @ $560.00 EACH $14,560.00 L.G.Roloff Construction Company,Inc. $65.00 EACH $1,690.00 • Luxa Construction Co., Inc. $424.00 EACH $11,024.00 Hawkins Construction Co. $316.55 EACH $8,230.30 Cedar Construction $385.00 EACH $10,010.00 Heimes Corp. $347.08 EACH $9,024.08 Anderson Excavating Co. $400.00 EACH $10,400.00 General Excavating $668.00 EACH $17,368.00 K-2 Construction $847.50 EACH $22,035.00 4 101.002 CLEARING AND GRUBBING TREES OVER 27"TO 36"DIAMETER Engineeer's Estimate 9 @ $1,000.00 EACH $9,000.00 L.G.Roloff Construction Company,Inc. $110.00 EACH $990.00 Luxa Construction Co., Inc. $861.00 EACH $7,749.00 Hawkins Construction Co. $794.42 EACH $7,149.78 Cedar Construction $740.00 EACH $6,660.00 Heimes Corp. $462.77 EACH $4,164.93 Anderson Excavating Co. $750.00 EACH $6,750.00 General Excavating $1,104.00 EACH $9,936.00 K-2 Construction $1,042.50 EACH $9,382.50 5 101.003 CLEARING AND GRUBBING TREES OVER 36"TO 48"DIAMETER Engineeer's Estimate 2 @ $1,400.00 EACH $2,800.00 L.G. Roloff Construction Company, Inc. $242.00 EACH $484.00 Luxa Construction Co., Inc. $1,500.00 EACH $3,000.00 Hawkins Construction Co. $1,645.24 EACH $3,290.48 Cedar Construction $1,230.00 EACH $2,460.00 Heimes Corp. $578.47 EACH $1,156.9.4 Anderson Excavating Co. • $1,000.00 EACH $2,000.00 General Excavating $1,571.00 EACH $3,142.00 K-2 Construction $1,295.00 EACH $2,590.00 Page 4 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 e number of students attending the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type Line# Item# Description Quantity Price Total 6 101.004 CLEARING AND GRUBBING TREES OVER 48"DIAMETER Engineeer's Estimate 2 @ $2,000.00 EACH $4,000.00 L.G.Roloff Construction Company, Inc. $520.00 EACH $1,040.00 Luxa Construction Co., Inc. $4,260.00 EACH $8,520.00 Hawkins Construction Co. $2,417.10 EACH $4,834.20 Cedar Construction $1,450.00 EACH $2,900.00 Heimes Corp. $809.85 EACH $1,619.70 Anderson Excavating Co. $1,200.00 EACH $2,400.00 General Excavating $2,384.00 EACH $4,768.00 K-2 Construction $1,662.50 EACH $3,325.00 7 104.000 EARTHWORK(EXCAVATION) Engineeer's Estimate 550 @ $5.00 per CY $2,750.00 L. G.Roloff Construction Company, Inc. $13.34 per CY $7,337.00 Luxa Construction Co., Inc. $2.62 per CY $1,441.00 Hawkins Construction Co. $12.00 per CY $6,600.00 Cedar Construction $4.50 per CY $2,475.00 Heimes Corp. $10.18 per CY $5,599.00 Anderson Excavating Co. $8.00 per CY $4,400.00 General Excavating $11.60 per CY $6,380.00 K-2 Construction $9.78 per CY $5,379.00* 8 104.001 EARTHWORK(EMBANKMENT) Engineeer's Estimate 150 @ $5.00 per CY $750.00 L. G.Roloff Construction Company, Inc. $3.76 per CY $564.00 Luxa Construction Co.,Inc. $4.43 per CY $664.50 Hawkins Construction Co. $10.48 per CY $1,572.00 Cedar Construction $11.60 per CY $1,740.00 Heimes Corp. $9.26 per CY $1,389.00 Anderson Excavating Co. $15.00 per CY t $2,250.00 General Excavating $25.70 per CY $3,855.00 K-2 Construction $9.78 per CY $1,467.00 * 9 104.002 EARTHWORK(UNSUITABLE EXCAVATION) Engineeer's Estimate 100 @ $15.00 per CY $1,500.00 L.G.Roloff Construction Company,Inc. $15.77 per CY $1,577.00 Luxa Construction Co., Inc. $20.71 per CY $2,071.00 Hawkins Construction Co. $18.71 per CY $1,871.00 Cedar.Construction $8.00 per CY $800.00 Heimes Corp. $12.45 per CY $1,245.00 Anderson Excavating Co. $10.00 per CY $1,000.00 General Excavating $22.30 per CY $2,230.00 K-2 Construction $17.78 per CY $1,778.00 * 10 105.002 FAULTY SUBGRADE-REMOVE AND REPLACE Engineeer's Estimate 100 @ $18.00 per CY $1,800.00 L. G. Roloff Construction Company, Inc. .$13.39 per CY $1,339.00 Luxa Construction Co.,Inc. $19.84 per CY $1,984.00 Hawkins Construction Co. $33.49 per CY $3,349.00 Cedar Construction $13.40 per CY $1,340.00 Heimes Corp. $16.00 per CY $1,600.00 Anderson Excavating Co. $22.00 per CY $2,200.00 General Excavating $37.30 per CY $3,730.00 K-2 Construction $17.78 per CY $1,778.00 * Corrected Extension Page 5 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 $1,295.00 EACH $2,590.00 Page 4 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 e number of students attending the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type Line# Item # Description Quantity Price Total 11 106.000 REMOVE PAVEMENT Engineeer's Estimate 1007 @ $6.00 per SY $6,042.00 L.G.Roloff Construction Company, Inc. $3.53 per SY $3,554.71 Luxa Construction Co., Inc. $6.00 per SY $6,042.00 Hawkins Construction Co. $4.97 per SY $5,004.79 Cedar Construction $5.60 per SY $5,639.20 Heimes Corp. $4.60 per SY $4,632.20 Anderson Excavating Co. $5.00 per SY $5,035.00 General Excavating $12.80 per SY $12,889.60 K-2 Construction $14.21 per SY . $14,309.47 12 108.000 REMOVE DRIVEWAY Engineeer's Estimate 59 @ $5.50 per SY $324.50 L.G.Roloff Construction Company, Inc. $4.60 per SY $271.40 Luxa Construction Co., Inc. $5.50 per SY $324.50 Hawkins Construction Co. $4.86 per SY $286.74 Cedar Construction $5.60 per SY $330.40 Heimes Corp. $5.52 per SY $325.68 Anderson Excavating Co. $5.00 per SY $295.00 General Excavating $12.80 per SY $755.20 • K-2 Construction $14.21 per SY $838.39 13 108.001 REMOVE SIDEWALK Engineeer's Estimate 5381 @ $0.80 per SF $4,304.80 L.G.Roloff Construction Company, Inc. $0.82 per SF $4,412.42 Luxa Construction Co., Inc. $0.60 per SF $3,228.60 Hawkins Construction Co. $0.53 per SF $2,851.93 Cedar Construction $0.75 per SF $4,035.75 Heimes Corp. $0.92 per SF $4,950.52 Anderson Excavating Co. $0.75 per SF $4,035.75 General Excavating $1.20 per SF $6,457.20 K-2 Construction $2.35 per SF $12,645.35 * 14 109.001 REMOVE COMBINATION CURB AND GUTTER Engineeer's Estimate 48 @ $5.25 per LF $252.00 L.G. Roloff Construction Company, Inc. $3.75 per LF $180.00 Luxa Construction Co., Inc. - $5.00 per LF $240.00 Hawkins Construction Co. $9.26 per LF $444.48 Cedar Construction $5.00 per LF $240.00 Heimes Corp. $6.90 per LF $331.20 Anderson Excavating Co. $5.00 per LF $240.00 General Excavating $7.00 per LF $336.00 K-2 Construction $5.85 per LF $280.80 15 110.021 REMOVE GUARD RAIL . Engineeer's Estimate 25 @ $15.00 per LF $375.00 L.G.Roloff Construction Company, Inc. $10.87 per LF $271.75 Luxa Construction Co., Inc. $11.00 per LF $275.00 Hawkins Construction Co. $10.59 per LF $264.75 Cedar Construction $8.00 per LF $200.00 Heimes Corp. $27.59 per LF $689.75 1 Anderson Excavating Co. $10.00 per LF $250.00 General Excavating $23.10 per LF $577.50 K-2 Construction $1,600.00 per LF $40,000.00 %, Corrected Extension Page 6 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by: admin for project OPW 50986 roject OPW 50986 $1,295.00 EACH $2,590.00 Page 4 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 e number of students attending the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type Line# Item # Description Quantity Price Total 16 111.000 REMOVE FENCE Engineeer's Estimate 1920 @ $6.50 per LF $12,480.00 L.G.Roloff Construction Company, Inc. $2.14 per LF $4,108.80 Luxa Construction Co., Inc. $2.20 per LF $4,224.00 Hawkins Construction Co. $2.12 per LF $4,070.40 Cedar Construction $1.50 per LF $2,880.00 Heimes Corp. $4.60 per LF $8,832.00 Anderson Excavating Co. $5.00 per LF $9,600.00 General Excavating $2.30 per LF $4,416.00 K-2 Construction $11.50 per LF $22,080.00 17 111.001 REMOVE AND REPLACE FENCE Engineeer's Estimate 84 @ $15.00 per LF $1,260.00 L.G. Roloff Construction Company, Inc. $20.77 per LF $1,744.68 • Luxa Construction Co., Inc. $21.40 per LF $1,797.60 Hawkins Construction Co. $20.59 per LF $1,729.56 Cedar Construction $25.00 per LF $2,100.00 Heimes Corp. • $35.90 per LF $3,015.60 Anderson Excavating Co. $25.00 per LF $2,100.00 General Excavating $36.90 per LF $3,099.60 K-2 Construction $35.21 per LF $2,957.64 * 18. 111.002 REMOVE AND REPLACE CHAIN LINK FENCE Engineeer's Estimate 100 @ $18.00 per LF $1,800.00 L.G. Roloff Construction Company, Inc. $26.54 per LF $2,654.00 Luxa Construction Co., Inc. $27.32 per LF $2,732.00 Hawkins Construction Co. $26.30 per LF $2,630.00 Cedar Construction $20.00 per LF $2,000.00 Heimes Corp. $26.82 per LF $2,682.00 Anderson Excavating Co. $25.00 per LF $2,500.00 General Excavating $28.20 per LF $2,820.00 K-2 Construction $26.31 per LF $2,631.00 * 19 111.011 REMOVE RIP-RAP RETAINING WALL Engineeer's Estimate 50 @ $12.00 per SF $600.00 L.G. Roloff Construction Company, Inc. $9.37 per SF $468.50 Luxa Construction Co., Inc. $10.28 per SF $514.00 Hawkins Construction Co. $8.29 per SF $414.50 Cedar Construction $5.00 per SF $250.00 • Heimes Corp. $9.22 per SF $461.00 Anderson Excavating Co. $10.00 per SF $500.00 General Excavating $7.00 per SF $350.00 K-2 Construction $80.00 per SF $4,000.00 20 900.020 CLEAR TRACT Engineeer's Estimate 1 @ $20,000.00 per LS $20,000.00 L.G. Roloff Construction Company, Inc. $5,436.22 per LS $5,436.22 Luxa Construction Co., Inc. $12,000.00 per LS $12,000.00 Hawkins Construction Co. $4,631.14 per LS $4,631.14 Cedar Construction $22,500.00 per LS $22,500.00 Heimes Corp. $5,601.27 per LS $5,601.27 Anderson Excavating Co. $15,000.00 per LS $15,000.00 General Excavating $14,040.00 per LS $14,040.00 K-2 Construction $8,000.00 per LS $8,000.00 . Corrected Extension Page 7 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by: admin for project OPW 50986 I 09 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 e number of students attending the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 1 Type ; Line# Item # Description Quantity Price Total 21 120.012 REMOVE 12"OR SMALLER SEWER PIPE Engineeer's Estimate 40 @ $9.00 per LF $360.00 L.G. Roloff Construction Company, Inc. $7.00 per LF $280.00 Luxa Construction Co., Inc. $14.74 per LF $589.60 Hawkins Construction Co. $27.49 per LF $1,099.60 , Cedar Construction $12.00 per LF $480.00 Heimes Corp. $5.37 per LF $214.80 Anderson Excavating Co. $6.00 per LF $240.00 General Excavating $18.50 per LF $740.00 K-2 Construction $24.00 per LF $960.00 22 120.018 REMOVE 15"TO 18"SEWER PIPE Engineeer's Estimate 48 @ $13.00 per LF $624.00 L.G. Roloff Construction Company, Inc. $8.25 per LF $396.00 Luxa Construction Co., Inc. $17.30 per LF $830.40 Hawkins Construction Co. $27.49 per LF $1,319.52 Cedar Construction $14.00 per LF $672.00 Heimes Corp. $7.16 per LF $343.68 Anderson Excavating Co. $7.00 per LF $336.00 General Excavating $22.00 per LF $1,056.00 K-2 Construction $24.00 per LF $1,152.00 23 130.000 REMOVE MANHOLE Engineeer's Estimate 1 @ $600.00 EACH $600.00 L.G. Roloff Construction Company, Inc. $400.00 EACH $400.00 Luxa Construction Co.,Inc. $775.00 EACH $775.00 Hawkins Construction Co. $211.11 EACH $211.11 Cedar Construction $680.00 EACH $680.00 Heimes Corp. $321.87 EACH $321.87 Anderson Excavating Co. $500.00 EACH $500.00 General Excavating $813.00 EACH $813.00 K-2 Construction $800.00 EACH $800.00 24 131.001 REMOVE CURB INLET Engineeer's Estimate 16 @ $400.00 EACH $6,400.00 L.G. Roloff Construction Company, Inc. $300.00 EACH $4,800.00 Luxa Construction Co., Inc. $120.00 EACH $1,920.00 Hawkins Construction Co. $211.11 EACH $3,377.76 Cedar Construction • $370.00 EACH $5,920.00 Heimes Corp. $279.88 EACH $4,478.08 Anderson Excavating Co. $400.00 EACH $6,400.00 General Excavating $582.00 EACH $9,312.00 K-2 Construction $800.00 EACH $12,800.00 25 131.002 REMOVE AREA INLET Engineeer's Estimate 1 @ $425.00 EACH $425.00 L.G. Roloff Construction Company, Inc. $400.00 EACH $400.00 Luxa Construction Co., Inc. $130.00 EACH $130.00 Hawkins Construction Co. $211.11 EACH $211.11 Cedar Construction $560.00 EACH $560.00 Heimes Corp. $321.87 EACH $321.87 Anderson Excavating Co. $400.00 EACH $400.00 General Excavating $467.00 EACH $467.00 K-2 Construction $800.00 EACH $800.00 Page 8 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by: admin for project OPW 50986 ected Extension Page 7 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by: admin for project OPW 50986 I 09 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 e number of students attending the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 • Type Line# Item # Description Quantity Price Total . 26 190.000 PUBLIC INFORMATION SERVICES Engineeer's Estimate 1 @ $27,000.00 per LS $27,000.00 L.G. Roloff Construction Company, Inc. $1,200.00 per LS $1,200.00 Luxa Construction Co., Inc. • $8,800.00 per LS $8,800.00 Hawkins Construction Co. $5,011.14 per LS $5,011.14 Cedar Construction $4,500.00 per LS $4,500.00 Heimes Corp. $9,379.24 per LS $9,379.24 Anderson Excavating Co. $12,000.00 per LS $12,000.00 General Excavating • $27,900.00 per LS $27,900.00 K-2 Construction $345.00 per LS $345.00 27 200.207 7"CONCRETE PAVEMENT-TYPE L65 Engineeer's Estimate 187 @ $40.00 per SY $7,480.00 L.G.Roloff Construction Company, Inc. $36.00 per SY $6,732.00 Luxa Construction Co., Inc. $55.25 per SY $10,331.75 Hawkins Construction Co. $49.59 per SY $9,273.33 Cedar Construction $42.60 per SY $7,966.20 Heimes Corp. $52.99 per SY $9,909.13 Anderson Excavating Co. $48.00 per SY $8,976.00 General Excavating $51.10 per SY $9,555.70 K-2 Construction $51.98 per SY $9,720.26 ' 28 200.209 9"CONCRETE PAVEMENT-TYPE L65 Engineeer's Estimate 748 @ $45.00 per SY $33,660.00 L.G.Roloff Construction Company, Inc. $41.50 per SY $31,042.00 Luxa Construction Co., Inc. $59.35 per SY $44,393.80 Hawkins Construction Co. $53.18 per SY $39,778.64 Cedar Construction $53.20 per SY $39,793.60 Heimes Corp. $56.97 per SY $42,613.56 Anderson Excavating Co. $52.00 per SY $38,896.00 General Excavating $54.90 per SY $41,065.20 K-2 Construction $55.88 per SY $41,798.24 :: 29 202.005 CONSTRUCT COMBINATION CURB AND GUTTER Engineeer's Estimate, 11 @ $20.00 per LF $220.00 L. G. Roloff Construction Company, Inc. $19.00 per LF $209.00 Luxa Construction Co., Inc. $20.25 per LF $222.75 Hawkins Construction Co. $19.47 per LF $214.17 Cedar Construction $18.90 per LF $207.90 Heimes Corp. • $52.76 per LF $580.36 Anderson Excavating Co. $23.00 per LF $253.00 General Excavating $20.80 per LF $228.80 K-2 Construction $21.15 per LF $232.65 ;: 30 204.000 4"CONCRETE SIDEWALK ' Engineeer's Estimate 3714 @ $3.50 per SF $12,999.00 L.G. Roloff Construction Company, Inc. $3.31 per SF $12,293.34 Luxa Construction Co., Inc. $3.30 per SF $12,256.20 Hawkins Construction Co. $3.20 per SF $11,884.80 Cedar Construction $3.50 per SF $12,999.00 Heimes Corp. $3.87 per SF $14,373.18 Anderson Excavating Co. $3.25 per SF $12,070.50 General Excavating $3.40 per SF • • $12,627.60 K-2 Construction $3.47 per SF $12,887.58 Corrected Extension Page 9 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by: admin for project OPW 50986 ulation, Generated by:admin for project OPW 50986 e number of students attending the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type Line# Item # Description Quantity Price Total 31 300.004 SAW CUT-FULL DEPTH Engineeer's Estimate 1302 @ $4.75 per LF $6,184.50 L.G. Roloff Construction Company, Inc. $3.55 per LF $4,622.10 Luxa Construction Co.,Inc. $4.85 per LF $6,314.70 Hawkins Construction Co. $4.66 per LF $6,067.32 Cedar Construction $4.50 per LF $5,859.00 Heimes Corp. $4.34 per LF $5,650.68 Anderson Excavating Co. $5.00 per LF $6,510.00 General Excavating $5.00 per LF $6,510.00 K-2 Construction $5.06 per LF $6,588.12 * 32 301.251 ASPHALTIC CONCRETE FOR PAVEMENT REPAIR-LARGE AREA,TYPE CMC, PG 64-22 Engineeer's Estimate 33 @ $150.00 per TON $4,950.00 L.G. Roloff Construction Company, Inc. $244.67 per TON $8,074.11 Luxa Construction Co., Inc. $137.50 per TON . $4,537.50 Hawkins Construction Co. $132.34 per TON $4,367.22 Cedar Construction $145.00 per TON $4,785.00 Heimes Corp. $293.10 per TON $9,672.30 Anderson Excavating Co. $65.00 per TON $2,145.00 General Excavating $111.80 per TON $3,689.40 K-2 Construction $143.75 per TON $4,743.75 33 309.000 GRANULAR FOUNDATION COURSE Engineeer's Estimate 61 @ $25.00 per TON $1,525.00 L.G. Roloff Construction Company, Inc. $19.58 per TON $1,194.38 Luxa Construction Co., Inc. $60.00 per TON $3,660.00 Hawkins Construction Co. $32.83 per TON $2,002.63 Cedar Construction $24.30 per TON $1,482.30 Heimes Corp. $25.79 per TON $1,573.19 Anderson Excavating Co. $23.00 per TON $1,403.00 General Excavating $34.40 per TON $2,098.40 K-2 Construction $57.71 per TON $3,520.31 34 309.020 AGGREGATE SUBBASE COURSE Engineeer's Estimate 102 @ $25.00 per TON $2,550.00 L.G. Roloff Construction Company, Inc. $21.61 per TON $2,204.22 Luxa Construction Co., Inc. $27.40 per TON $2,794.80 Hawkins Construction Co. $26.28 per TON $2,680.56 Cedar Construction $21.40 per TON $2,182.80 Heimes Corp. $25.79 per TON $2,630.58 Anderson Excavating Co. $16.00 per TON $1,632.00 General Excavating $30.80 per TON $3,141.60 K-2 Construction $55.12 per TON $5,622.24 * 35 309.400 3"CRUSHED ROCK STABILIZATION BEDDING Engineeer's Estimate 60 @ $24.00 per TON $1,440.00 L.G. Roloff Construction Company, Inc. $17.73 per TON $1,063.80 Luxa Construction Co., Inc. $29.00 per TON $1,740.00 Hawkins Construction Co. $32.83 per TON $1,969.80 Cedar Construction $22.40 per TON $1,344.00 Heimes Corp. $32.83 per TON $1,969.80 Anderson Excavating Co. $20.00 per TON $1,200.00 General Excavating $29.60 per TON $1,776.00 K-2 Construction $56.50 per TON $3,390.00 * • * Corrected Extension Page 10 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 tion, Generated by: admin for project OPW 50986 ulation, Generated by:admin for project OPW 50986 e number of students attending the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 • Type Line# Item # Description Quantity Price Total 36 310.010 AGGREGATE SURFACE COURSE Engineeer's Estimate 468 @ $24.00 per TON $11,232.00 L.G.Roloff Construction Company, Inc. $20.30 per TON $9,500.40 Luxa Construction Co., Inc. $24.00 per TON $11,232.00 Hawkins Construction Co. $20.97 per TON $9,813.96 Cedar Construction $21.60 per TON $10,108.80 Heimes Corp. $25.79 per TON $12,069.72 Anderson Excavating Co. $20.00 per TON $9,360.00 General Excavating $28.20 per TON $13,197.60 K-2 Construction $31.12 per TON $14,564.16 * 37 400.000 AGGREGATE BEDDING Engineeer's Estimate 3523 @ $22.00 per TON $77,506.00 L.G.Roloff Construction Company, Inc. $13.73 per TON $48,370.79 Luxa Construction Co., Inc. $17.40 per TON $61,300.20 Hawkins Construction Co. $16.29 per TON $57,389.67 Cedar Construction $18.50 per TON $65,175.50 Heimes Corp. $25.79 per TON $90,858.17 Anderson Excavating Co. $18.00 per TON $63,414.00 General Excavating $22.40 per TON $78,915.20 K-2 Construction $24.50 per TON $86,313.50 * 38 401.015 CONSTRUCT 15"R.C.P.,CLASS III Engineeer's Estimate 210 @ $42.00 per LF . $8,820.00 L.G. Roloff Construction Company, Inc. $34.18 per LF $7,177.80 Luxa Construction Co., Inc. $35.00 per LF $7,350.00 Hawkins Construction Co. $17.02 per LF $3,574.20 Cedar Construction $26.70 per LF $5,607.00 Heimes Corp. $17.36 per LF $3,645.60 Anderson Excavating Co. $35.00 per LF $7,350.00 I General Excavating $31.30 per LF $6,573.00 K-2 Construction $45.22 per LF $9,496.20 %: 39 401.018 CONSTRUCT 18"R.C.P.,CLASS III Engineeer's Estimate 715 @ $50.00 per LF $35,750.00 L.G. Roloff Construction Company, Inc. $38.46 per LF $27,498.90 Luxa Construction Co., Inc. $33.00 per LF $23,595.00 Hawkins Construction Co. $23.31 per LF $16,666.65 Cedar Construction $33.40 per LF $23,881.00 Heimes Corp. $21.26 per LF $15,200.90 Anderson Excavating Co. $37.00 per LF $26,455.00 General Excavating $35.70 per LF $25,525.50 * K-2 Construction $50.39 per LF $36,028.85 40 401.024 CONSTRUCT 24"R.C.P.,CLASS III Engineeer's Estimate 347 @ $55.00 per LF $19,085.00 L.G. Roloff Construction Company, Inc. $43.44 per LF $15,073.68 Luxa Construction Co., Inc. $36.90 per LF $12,804.30 Hawkins Construction Co. $28.66 per LF $9,945.02 Cedar Construction $42.15 per LF $14,626.05 Heimes Corp. $31.90 per LF $11,069.30 Anderson Excavating Co. $45.00 per LF $15,615.00 1 General Excavating $46.60 per LF $16,170.20 K-2 Construction $62.38 per LF $21,645.86 * * Corrected Extension Page 11 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type Line# Item # Description Quantity Price Total 41 401.030 CONSTRUCT 30"R.C.P.,CLASS III Engineeer's Estimate 146 @ $70.00 per LF $10,220.00 L.G. Roloff Construction Company, Inc. $45.00 per LF $6,570.00 Luxa Construction Co., Inc. $47.00 per LF $6,862.00 Hawkins Construction Co. • $39.79 per LF $5,809.34 Cedar Construction $45.30 per LF $6,613.80 Heimes Corp. $41.95 per LF $6,124.70 Anderson Excavating Co. $61.00 per LF $8,906.00 General Excavating $62.60 per LF $9,139.60 K-2 Construction • $84.74 per LF $12,372.04 42 401.036 CONSTRUCT 36"R.C.P.,D(0.01)= 1,350 Engineeer's Estimate 1183 @ $110.00 per LF $130,130.00 L.G. Roloff Construction Company, Inc. • $51.73 per LF $61,196.59 Luxa Construction Co., Inc. $54.10 per LF $64,000.30 Hawkins Construction Co. $53.98 per LF $63,858.34 Cedar Construction $62.30 per LF $73,700.90 Heimes Corp. $57.48 per LF $67,998.84 Anderson Excavating Co. $80.00 per LF $94,640.00 General Excavating K-2 Construction $83.30 per LF $98,543.90 , $115.06 per LF $136,115.98 %� 43 401.048 CONSTRUCT 48"R.C.P.,D(0.01)= 1,350 Engineeer's Estimate 357 @ $160.00 per LF $57,120.00 ' L.G. Roloff Construction Company, Inc. $71.53 per LF $25,536.21 Luxa Construction Co., Inc. $87.55 per LF $31,255.35 Hawkins Construction Co. $69.07 per LF $24,657.99 Cedar Construction $113.20 per LF $40,412.40 Heimes Corp. $100.29 per LF $35,803.53 Anderson Excavating Co. $175.00 per LF $62,475.00 General Excavating $138.90 per LF $49,587.30 * K-2 Construction $157.85 per LF $56,352.45 44 401.060 .CONSTRUCT 60"R.C.P.,D(0.01)= 1,350 Engineeer's Estimate 260 @ $250.00 per LF $65,000.00 L.G. Roloff Construction Company, Inc. $134.03 per LF $34,847.80 Luxa Construction Co., Inc. $160.67 per LF $41,774.20 • Hawkins Construction Co. $98.51 per LF $25,612.60 Cedar Construction $151.20 per LF $39,312.00 Heimes Corp. $140.83 per LF $36,615.80 Anderson Excavating Co. $220.00 per LF $57,200.00 General Excavating $189.40 per LF $49,244.00 K-2 Construction $236.71 per LF $61,544.60 k 45 900.045 BORE AND JACK 36"R.C.P., D(0.01)=2,000 Engineeer's Estimate 483 @ $475.00 per LF $229,425.00 L.G. Roloff Construction Company, Inc. $396.52 per LF $191,519.16 Luxa Construction Co., Inc. $418.20 per LF $201,990.60 Hawkins Construction Co. $407.07 per LF $196,614.81 Cedar Construction $490.00 per LF $236,670.00 Heimes Corp. $700.54 per LF $338,360.82 Anderson Excavating Co. $600.00 per LF $289,800.00 General Excavating $600.70 per LF $290,138.10 K-2 Construction $479.94 per LF $231,811.02 * * Corrected Extension Page 12 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type Line# Item # Description Quantity Price Total 46 900.046 BORE AND JACK 42"R.C.P.,D(0.01)=2,000 Engineeer's Estimate 153 @ $500.00 per LF $76,500.00 L.G. Roloff Construction Company, Inc. $513.00 per LF $78,489.00 Luxa Construction Co., Inc. $552.70 per LF $84,563.10 Hawkins Construction Co. $531.74 per LF $81,356.22 Cedar Construction $596.00 per LF $91,188.00 Heimes Corp. $762.12 per LF $116,604.36 Anderson Excavating Co. $700.00 per LF $107,100.00 General Excavating $748.80 per LF $114,566.40 K-2 Construction $620.93 per LF $95,002.29 47 415.054 CONSTRUCT 54"I.D.MANHOLE Engineeer's Estimate 48 @ $325.00 per VF p $15,600.00 L.G.Roloff Construction Company, Inc. $252.46 per VF $12,118.08 Luxa Construction Co., Inc. $345.00 per VF $16,560.00 Hawkins Construction Co. $231.99 per VF $11,135.52 Cedar Construction $301.00 per VF $14,448.00 Heimes Corp. $277.78 per VF $13,333.44 Anderson Excavating Co. $350.00 per VF $16,800.00 General Excavating $401.30 per VF p $19,262.40 K-2 Construction $512.19 pet VF $24,585.12 48 415.060 CONSTRUCT 60"I.D.MANHOLE Engineeer's Estimate 41 @ $400.00 per VF $16,400.00 L.G. Roloff Construction Company, Inc. $270.00 per VF $11,070.00 Luxa Construction Co., Inc. $351.00 per VF $14,391.00 Hawkins Construction Co. $273.99 per VF $11,233.59 Cedar Construction $352.00 per VF $14,432.00 Heimes Corp. $298.86 per VF $12,253.26 Anderson Excavating Co. $450.00 per VF $18,450.00 General Excavating $395.90 per VF p $16,231.90 K-2 Construction $581.77 per VF $23,852.57 49 415.072 CONSTRUCT 72"I.D. MANHOLE Engineeer's,Estimate 23 @ $500.00 per VF $11,500.00 L.G. Roloff Construction Company, Inc. $337.63 per VF $7,765.49 Luxa Construction Co., Inc. $374.00 per VF $8,602.00 Hawkins Construction Co. $371.33 per VF $8,540.59 Cedar Construction $490.00 per VF $11,270.00 Heimes Corp. $557.33 per VF p $12,818.59 Anderson Excavating Co. $550.00 per VF $12,650.00 General Excavating $537.80 per VF $12,369.40 K-2 Construction $765.74 per VF $17,612.02 50 415.084 CONSTRUCT 84"I.D.MANHOLE Engineeer's Estimate 53 @ $710.00 per VF $37,630.00 L.G. Roloff Construction Company, Inc. $509.64 per VF p $27,010.92 • Luxa Construction Co., Inc. $479.00 per VF $25,387.00 Hawkins Construction Co. $526.19 per VF $27,888.07 Cedar Construction $655.00 per VF $34,715.00 Heimes Corp. $692.13 per VF $36,682.89 Anderson Excavating Co. $625.00 per VF $33,125.00 General Excavating $789.10 per VF $41,822.30 K-2 Construction $996.61 per VF $52,820.33 * Corrected Extension Page 13 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type , Line# Item# Description Quantity Price Total 51 417.020 EXTERNAL FRAME SEAL Engineeer's Estimate 3 @ $475.00 EACH $1,425.00 L.G. Roloff Construction Company, Inc. $270.62 EACH $811.86 Luxa Construction Co., Inc. $250.00 EACH $750.00 Hawkins Construction Co. $556.89 EACH $1,670.67 Cedar Construction $340.00 EACH $1,020.00 Heimes Corp. $346.54 EACH $1,039.62 Anderson Excavating Co. $500.00 EACH $1,500.00 . General Excavating $437.40 EACH $1,312.20 K-2 Construction $1,063.35 EACH $3,190.05 52 421.001 CONSTRUCT TYPE"A"INLET Engineeer's Estimate 2 @ $2,200.00 EACH $4,400.00 L.G. Roloff Construction Company, Inc. $2,243.68 EACH $4,487.36 Luxa Construction Co., Inc. $2,310.00 EACH $4,620.00 Hawkins Construction Co. $2,223.33 EACH $4,446.66 Cedar Construction $2,550.00 EACH $5,100.00 Heimes Corp. • $2,749.29 EACH $5,498.58 Anderson Excavating Co. $1,800.00 EACH $3,600.00 General Excavating $2,429.50 EACH $4,859.00 K-2 Construction $4,700.00 EACH $9,400.00 53 421.002 CONSTRUCT TYPE"A-A"INLET Engineeer's Estimate 12 @ $3,500.00 EACH $42,000.00 L.G. Roloff Construction Company, Inc. $2,777.89 EACH $33,334.68 Luxa Construction Co., Inc. $2,860.00 EACH $34,320.00 Hawkins Construction Co. $2,752.69 EACH $33,032.28 Cedar Construction $3,100.00 EACH $37,200.00 Heimes Corp. $4,285.14 EACH $51,421.68 Anderson Excavating Co. $3,200.00 EACH $38,400.00 • General Excavating $4,039.80 EACH $48,477.60 K-2 Construction $5,629.20 EACH $67,550.40 54 425.000 CONSTRUCT TYPE"C"INLET Engineeer's Estimate 2 @ $3,000.00 EACH $6,000.00 L. G. Roloff Construction Company, Inc. $2,243.68 EACH % $4,487.36 • Luxa Construction Co., Inc. $2,310.00 EACH $4,620.00 Hawkins Construction Co. $2,223.33 EACH $4,446.66 Cedar Construction $2,550.00 EACH $5,100.00 Heimes Corp. $3,921.70 EACH $7,843.40 Anderson Excavating Co. $1,900.00 EACH $3,800.00 General Excavating $3,633.00 EACH $7,266.00 K-2 Construction $4,953.00 EACH $9,906.00 55 429.018 CONSTRUCT 18"R.C. FLARED END SECTION Engineeer's Estimate 1 @ $400.00 EACH $400.00 L.G. Roloff Construction Company, Inc. $292.38 EACH $292.38 Luxa Construction Co., Inc. $705.00 EACH $705.00 Hawkins Construction Co. $268.36 EACH $268.36 Cedar Construction $385.00 EACH $385.00 Heimes Corp. $576.87 EACH . $576.87 Anderson Excavating Co. $400.00 EACH $400.00 General Excavating $710.00 EACH $710.00 K-2 Construction $945.00 EACH $945.00 Page 14 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 $52,820.33 * Corrected Extension Page 13 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type _ Line# Item # Description Quantity Price Total 56 500.006 CONSTRUCT 6"SANITARY SEWER PIPE • Engineeer's Estimate 50 @ $40.00 per LF $2,000.00 L.G. Roloff Construction Company, Inc. $36.14 per LF $1,807.00 Luxa Construction Co., Inc. $22.15 per LF $1,107.50 Hawkins Construction Co. $49.93 per LF $2,496.50 Cedar Construction $55.00 per LF $2,750.00 Heimes Corp. $21.37 per LF $1,068.50 • Anderson Excavating Co. $75.00 per LF $3,750.00 General Excavating $101.00 per LF $5,050.00 . K-2 Construction $53.59 per LF $2,679.50 57 525.012 CONSTRUCT 12"PIPE PLUG Engineeer's Estimate 8 @ $100.00 EACH $800.00 L.G. Roloff Construction Company, Inc. $67.47 EACH $539.76 Luxa Construction Co., Inc. $90.00 EACH $720.00 Hawkins Construction Co. $172.54 EACH $1,380.32 Cedar Construction $88.00 EACH $704.00 Heimes Corp. $87.93 EACH $703.44 Anderson Excavating Co. $150.00 EACH $1,200.00 General Excavating $176.00 EACH $1,408.00 K-2 Construction $481.55 EACH $3,852.40 * 58 525.015 CONSTRUCT 15"PIPE PLUG Engineeer's Estimate 13 @ $150.00 EACH $1,950.00 L.G. Roloff Construction Company, Inc. $80.96 EACH $1,052.48 Luxa Construction Co., Inc. $94.00 EACH $1,222.00 Hawkins Construction Co. $184.15 EACH $2,393.95 Cedar Construction $125.00 EACH $1,625.00 Heimes Corp. $117.24 EACH $1,524.12 Anderson Excavating Co. $175.00 EACH $2,275.00 I General Excavating $234.00 EACH $3,042.00 i K-2 Construction $481.55 EACH $6,260.15 * 59 . 525.018 CONSTRUCT 18"PIPE PLUG Engineeer's Estimate 5 @ $225.00 EACH $1,125.00 L.G.Roloff Construction Company,Inc. $115.95 EACH $579.75 Luxa Construction Co., Inc. $98.00 EACH $490.00 Hawkins Construction Co. $197.69 EACH $988.45 Cedar Construction $155.00 EACH $775.00 Heimes Corp. $146.55 EACH $732.75 Anderson Excavating Co. $200.00 EACH $1,000.00 General Excavating $293.00 EACH $1,465.00 K-2 Construction $481.55 EACH $2,407.75 * 60 525.024 CONSTRUCT 24"PIPE PLUG Engineeer's Estimate 1 @ $250.00 EACH $250.00 L.G. Roloff Construction Company, Inc. $131.95 EACH $131.95 Luxa Construction Co., Inc. $124.00 EACH $124.00 Hawkins Construction Co. $222.84 EACH $222.84 Cedar Construction $220.00 EACH $220.00 Heimes Corp. $175.86 EACH $175.86 Anderson Excavating Co. $250.00 EACH • $250.00 General Excavating $323.00 EACH $323.00 K-2 Construction $481.55 EACH $481.55 ** Corrected Extension Page 15 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 • xtension Page 13 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type Line# Item # Description Quantity Price Total 61 525.036 CONSTRUCT 36"PIPE PLUG Engineeer's Estimate 1 @ $300.00 EACH $300.00 L.G. Roloff Construction Company, Inc. $150.82 EACH $150.82 Luxa Construction Co., Inc. $169.00 EACH $169.00 Hawkins Construction Co. $338.12 EACH $338.12 Cedar Construction $295.00 EACH $295.00 Heimes Corp. $234.48 EACH $234.48 Anderson Excavating Co. $400.00 EACH $400.00 General Excavating $762.00 EACH $762.00 K-2 Construction $1,041.20 EACH $1,041.20 62 540.000 GEOTEXTILE FABRIC Engineeer's Estimate 2150 @ $3.25 per SY $6,987.50 L.G. Roloff Construction Company,Inc. $2.64 per SY $5,676.00 Luxa Construction Co., Inc. $1.33 per SY • $2,859.50 Hawkins Construction Co. $1.34 per SY $2,881.00 Cedar Construction $4.55 per SY $9,782.50. Heimes Corp. $2.44 per SY $5,246.00 Anderson Excavating Co. $3.50 per SY $7,525.00 General Excavating $2.70 per SY $5,805.00 • K-2 Construction $2.59 per SY $5,568.50 63 550.000 SILT FENCE Engineeer's Estimate 417 @ $3.00 per LF $1,251.00 L.G. Roloff Construction Company, Inc. $2.40 per LF $1,000.80 Luxa Construction Co., Inc. $2.20 per LF $917.40 Hawkins Construction Co. $2.12 per LF $884.04 Cedar Construction $2.80 per LF $1,167.60 Heimes Corp. $3.52 per LF $1,467.84 Anderson Excavating Co. $3.50 per LF $1,459.50 General Excavating $2.30 per LF $959.10 K-2 Construction $3.45 per LF $1,438.65 64 550.310 CURB INLET T PROTECTION •• Engineeer's Estimate 18 @ $150.00 EACH $2,700.00 L.G.Roloff Construction Company, Inc. $145.00 EACH $2,610.00 Luxa Construction Co., Inc. $159.50 EACH $2,871.00 Hawkins Construction Co. $153.52 EACH $2,763.36 Cedar Construction $200.00 EACH $3,600.00 Heimes Corp. $105.52 EACH $1,899.36 Anderson Excavating Co. $150.00 EACH $2,700.00 General Excavating $164.00 EACH $2,952.00 K-2 Construction $103.50 EACH $1,863.00 65 601.002 CONSTRUCT ROCK RIP-RAP-TYPE"B" Engineeer's Estimate 541 @ $30.00 per TON $16,230.00 L.G. Roloff Construction Company, Inc. $34.00 per TON $18,394.00 Luxa Construction Co., Inc. $32.25 per TON $17,447.25 Hawkins Construction Co. $37.46 per TON $20,265.86 Cedar Construction $36.50 per TON $19,746.50 Heimes Corp. $23.86 per TON $12,908.26 Anderson Excavating Co. $60.00 per TON $32,460.00 General Excavating $37.40 per TON $20,233.40 K-2 Construction $48.09 per TON $26,016.69 Corrected Extension Page 16 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 Bid Tabulation, Generated by:admin for project OPW 50986 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type • Line# Item # Description Quantity Price Total 66 601.003 CONSTRUCT ROCK RIP-RAP-TYPE"C" • Engineeer's Estimate 680 @ $35.00 per TON z $23,800.00 L.G. Roloff Construction Company, Inc. $43.00 per TON $29,240.00 Luxa Construction Co., Inc. $42.52 per TON $28,913.60 Hawkins Construction Co. $43.01 per TON $29,246.80 Cedar Construction $35.80 per TON $24,344.00 Heimes Corp. $25.62 per TON $17,421.60 Anderson Excavating Co. $60.00 per TON $40,800.00 General Excavating $39.70 per TON $26,996.00 K-2 Construction $48.09 per TON $32,701.20 * 67 604.001 CONSTRUCT STONE RETAINING WALL Engineeer's Estimate 50 @ $65.00 per SF $3,250.00 L.G.Roloff Construction Company, Inc. $26.71 per SF $1,335.50 Luxa Construction Co., Inc. $24.20 per SF $1,210.00 Hawkins Construction Co. $23.29 per SF $1,164.50 Cedar Construction $30.00 per SF $1,500.00 Heimes Corp. $29.78 per SF $1,489.00 Anderson Excavating Co. $25.00 per SF $1,250.00 General Excavating $24.90 per SF $1,245.00 K-2 Construction $25.30 per SF $1,265.00 68 605.000 SODDING Engineeer's Estimate 44 @ $5.00 per SY $220.00 L.G. Roloff Construction Company, Inc. $6.15 per SY $270.60 Luxa Construction Co., Inc. $8.30 per SY $365.20 Hawkins Construction Co. $4.82 per SY $212.08 Cedar Construction $5.00 per SY $220.00 Heimes Corp. $9.38 per SY $412.72 Anderson Excavating Co. $10.00 per SY $440.00 General Excavating $2.80 per SY $123.20 K-2 Construction $9.20 per SY $404.80 69 606.001 SEEDING-TYPE"A" Engineeer's Estimate 1104 @ $1.35 per SY $1,490.40 L.G. Roloff Construction Company, Inc. $0.48 per SY $529.92 Luxa Construction Co., Inc. $0.50 per SY $552.00 Hawkins Construction Co. $1.50 per SY $1,656.00 Cedar Construction $0.60 per SY $662.40 Heimes Corp. $0.84 per SY $927.36 Anderson Excavating Co. $0.95 per SY $1,048.80 General Excavating $0.50 per SY $552.00 K-2 Construction $0.83 per SY $916.32 * 70 606.002 SEEDING-TYPE"B" Engineeer's Estimate 10771 @ $1.10 per SY $11,848.10 L.G.Roloff Construction Company, Inc. $0.27 per SY $2,908.17 Luxa Construction Co., Inc. $0.30 per SY $3,231.30 Hawkins Construction Co. $1.31 per SY $14,110.01 Cedar Construction $0.45 per SY $4,846.95 Heimes Corp. $0.53 per SY $5,708.63 Anderson Excavating Co. $0.65 per SY $7,001.15 General Excavating $0.30 per SY $3,231.30 K-2 Construction $0.52 per SY $5,600.92 ;; Corrected Extension Page 17 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 ject OPW 50986 Bid Tabulation, Generated by:admin for project OPW 50986 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type , Line# Item# Description Quantity Price Total 71 607.010 ROLLED EROSION CONTROL,TYPE I Engineeer's Estimate 2220 @ $2.50 per SY $5,550.00 L.G.Roloff Construction Company, Inc. $1.50 per SY $3,330.00 Luxa Construction Co., Inc. $1.27 per SY $2,819.40 Hawkins Construction Co. $1.22 per SY $2,708.40 Cedar Construction $1.55 per SY $3,441.00 Heimes Corp. $1.23 per SY $2,730.60 Anderson Excavating Co. $2.00 per SY $4,440.00 General Excavating $1.30 per SY $2,886.00 K-2 Construction $1.21 per SY $2,686.20 72 703.000 SHEET PILE • Engineeer's Estimate 1 @ $44,000.00 per LS $44,000.00 L.G. Roloff Construction Company, Inc. $44,000.00 per LS $44,000.00 Luxa Construction Co., Inc. $64,625.00 per LS $64,625.00 Hawkins Construction Co. $36,052.42 per LS $36,052.42 Cedar Construction $65,875.00 per LS $65,875.00 Heimes Corp. $70,344.28 per LS $70,344.28 Anderson Excavating Co. $68,000.00 per LS $68,000.00 General Excavating $55,935.00 per LS $55,935.00 K-2 Construction $65,250.00 per LS $65,250.00 73 740.072 CONSTRUCT 72"CHAIN LINK FENCE Engineeer's Estimate 35 @ $28.00 per LF $980.00 L.G. Roloff Construction Company, Inc. $41.48 per LF $1,451.80 Luxa Construction Co., Inc. $42.70 per LF $1,494.50 Hawkins Construction Co. $41.10 per LF $1,438.50 Cedar Construction $40.00 per LF $1,400.00 Heimes Corp. $44.55 per LF $1,559.25 Anderson Excavating Co. $50.00 per LF $1,750.00 General Excavating $42.90 per LF $1,501.50 K-2 Construction $43.70 per LF $1,529.50 74 741.072 CONSTRUCT 72"CHAIN LINK FENCE GATE Engineeer's Estimate 1 @ $750.00 EACH $750.00 L.G. Roloff Construction Company, Inc. $413.48 EACH $413.48 Luxa Construction Co., Inc. $425.70 EACH $425.70 Hawkins Construction Co. $409.73 EACH $409.73 Cedar Construction $400.00 EACH $400.00 Heimes Corp. $361.10 EACH $361.10 Anderson Excavating Co. $2,000.00 EACH $2,000.00 General Excavating $348.00 EACH $348.00 K-2 Construction $354.20 EACH $354.20 75 742.000 CONSTRUCT WIRE FENCE Engineeer's Estimate 205 @ $15.00 per LF $3,075.00 L.G. Roloff Construction Company, Inc. $6.30 per LF $1,291.50 Luxa Construction Co., Inc. $6.49 per LF $1,330.45 Hawkins Construction Co. $6.25 per LF $1,281.25 Cedar Construction $4.50 per LF $922.50 Heimes Corp. $10.36 per LF $2,123.80 Anderson Excavating Co. • $25.00 per LF $5,125.00 General Excavating $10.00 per LF $2,050.00 K-2 Construction $31.97 per LF $6,553.85 * ,c Corrected Extension Page 18 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by: admin for project OPW 50986 Bid Tabulation, Generated by:admin for project OPW 50986 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type , Line# Item # Description Quantity Price Total 76 742.001 CONSTRUCT WOVEN WIRE FENCE Engineeer's Estimate 570 @ $18.00 per LF $10,260.00 L.G. Roloff Construction Company, Inc. $4.93 per LF $2,810.10 Luxa Construction Co., Inc. $5.07 per LF $2,889.90 Hawkins Construction Co. $4.88 per LF $2,781.60 Cedar Construction $4.90 per LF $2,793.00 Heimes Corp. $5.44 per LF $3,100.80 . Anderson Excavating Co. $30.00 per LF $17,100.00 General Excavating $5.20 per LF $2,964.00 K-2 Construction $5.34 per LF $3,043.80 • 77 742.002 PROVIDE SECURITY FENCING Engineeer's Estimate 1 @ $12,000.00 per LS $12,000.00 L.G.Roloff Construction Company, Inc. $1,359.00 per LS $1,359.00 Luxa Construction Co., Inc. $6,550.00 per LS $6,550.00 Hawkins Construction Co. $7,931.47 per LS $7,931.47 Cedar Construction $5,500.00 per LS $5,500.00 • Heimes Corp. $20,981.14 per LS $20,981.14 Anderson Excavating Co. $20,000.00 per LS $20,000.00 General Excavating $20,180.90 per LS $20,180.90 K-2 Construction $7,239.25 per LS $7,239.25 78 760.000 ADJUST MANHOLE TO GRADE Engineeer's Estimate 2 @ $225.00 EACH $450.00 L.G. Roloff Construction Company,Inc. $150.00 EACH $300.00 Luxa Construction Co., Inc. $185.00 EACH $370.00 Hawkins Construction Co. $435.06 EACH $870.12 Cedar Construction $220.00 EACH $440.00 Heimes Corp. $139.47 EACH $278.94 Anderson Excavating Co. $400.00 EACH $800.00 General Excavating $291.00 EACH $582.00 K-2 Construction $909.25 EACH $1,818.50 79 780.000 ADJUST GAS VALVE TO GRADE Engineeer's Estimate 2 @ $150.00 EACH $300.00 L.G. Roloff Construction Company, Inc. $120.00 EACH $240.00 Luxa Construction Co., Inc. $157.00 EACH $314.00 • Hawkins Construction Co. $138.05 EACH $276.10 Cedar Construction $220.00 EACH $440.00 Heimes Corp. $139.47 EACH $278.94 Anderson Excavating Co. $175.00 EACH $350.00 General Excavating $233.30 EACH $466.60 K-2 Construction $909.25 EACH $1,818.50 80 780.001 ADJUST WATER VALVE TO GRADE Engineeer's Estimate 2 @ $150.00 EACH $300.00 L.G. Roloff Construction Company,Inc. • $120.00 EACH $240.00 Luxa Construction Co., Inc. $157.00 EACH $314.00 Hawkins Construction Co. $138.05 EACH $276.10 Cedar Construction $220.00 EACH $440.00 Heimes Corp. $139.47 EACH $278.94 Anderson Excavating Co. $175.00 EACH $350.00 General Excavating $233.30 EACH $466.60 K-2 Construction $909.25 EACH $1,818.50 Corrected Extension Page 19 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 ct OPW 50986 Bid Tabulation, Generated by:admin for project OPW 50986 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type , Line# Item # Description Quantity Price Total 81 785.001 INSTALL COPPER PIPE (OPEN CUT)3/4"-TYPE"K" Engineeer's Estimate 50 @ $22.00 per LF $1,100.00 L. G.Roloff Construction Company, Inc. $22.50 per LF $1,125.00 Luxa Construction Co., Inc. $29.15 per LF $1,457.50 Hawkins Construction Co. $40.76 per LF $2,038.00 Cedar Construction $21.00 per LF $1,050.00 Heimes Corp. $26.58 per LF $1,329.00 Anderson Excavating Co. $25.00 per LF $1,250.00 General Excavating $26.70 per LF $1,335.00 K-2 Construction $22.21 per LF $1,110.50 82 785.002 INSTALL COPPER PIPE(PUSH)3/4"-TYPE"K" Engineeer's Estimate 50 @ $30.00 per LF $1,500.00 L.G.Roloff Construction Company, Inc. $28.00 per LF $1,400.00 Luxa Construction Co., Inc. $29.15 per LF $1,457.50 Hawkins Construction Co. $40.76 per LF $2,038.00 Cedar Construction $35.00 per LF $1,750.00 Heimes Corp. $34.94 per LF $1,747.00 Anderson Excavating Co. $34.00 per LF $1,700.00 General Excavating $32.50 per LF $1,625.00 K-2 Construction $27.39 per LF $1,369.50* 83 785.003 INSTALL COPPER PIPE(OPEN CUT) 1"-TYPE"K" Engineeer's Estimate 50 @ $25.00 per LF $1,250.00 L.G. Roloff Construction Company, Inc. $26.50 per LF $1,325.00 Luxa Construction Co.,Inc. $29.70 per LF $1,485.00 Hawkins Construction Co. $44.47 per LF $2,223.50 Cedar Construction $25.50 per LF $1,275.00 Heimes Corp. $23.95 per LF $1,197.50 Anderson Excavating Co. . $30.00 per LF $1,500.00 General Excavating $29.10 per LF $1,455.00 K-2 Construction $22.74 per LF $1,137.00" 84 785.004 INSTALL COPPER PIPE(PUSH) 1"-TYPE"K" Engineeer's Estimate 50 @ $40.00 per LF $2,000.00 L.G. Roloff Construction Company, Inc. $30.00 per LF $1,500.00 Luxa Construction Co.,Inc. $29.70 per LF $1,485.00 Hawkins Construction Co. $44.47 per LF $2,223.50 Cedar Construction $38.00 per LF $1,900.00 Heimes Corp. $36.46 per LF $1,823.00 Anderson Excavating Co. $35.00 per LF $1,750.00 General Excavating $34.90 per LF $1,745.00 K-2 Construction $27.92 per LF $1,396.00 • 85 786.000 INSTALL NEW CURB COCK AND NEW CURB BOX Engineeer's Estimate 2 @ $325.00 EACH $650.00 L. G.Roloff Construction Company, Inc. $233.82 EACH $467.64 Luxa Construction Co., Inc. $440.00 EACH $880.00 Hawkins Construction Co. $518.78 EACH $1,037.56 Cedar Construction $245.00 EACH $490.00 Heimes Corp. $416.48 EACH $832.96 Anderson Excavating Co. $325.00 EACH $650.00 General Excavating $471.00 EACH $942.00 K-2 Construction $558.09 EACH $1,116.18 Corrected Extension Page 20 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 dmin for project OPW 50986 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type , Line# Item # Description Quantity Price Total 86 786.001 INSTALL NEW CURB COCK AND EXISTING CURB BOX Engineeer's Estimate 2 @ $310.00 EACH $620.00 L.G.Roloff Construction Company, Inc. $195.61 EACH $391.22 Luxa Construction Co., Inc. $440.00 EACH $880.00 Hawkins Construction Co. $518.78 EACH $1,037.56 Cedar Construction $188.00 EACH $376.00 Heimes Corp. $393.03 EACH $786.06 Anderson Excavating Co. $300.00 EACH $600.00 General Excavating $406.50 EACH $813.00 K-2 Construction $574.53 EACH $1,149.06 87 787.000 CONSTRUCT 3/4"TAP TO M.U.D. MAIN ' Engineeer's Estimate 2 @ $650.00 EACH $1,300.00 L.G.Roloff Construction Company, Inc. $500.00 EACH $1,000.00 Luxa Construction Co., Inc. $632.50 EACH $1,265.00 Hawkins Construction Co. $365.26 EACH $730.52 Cedar Construction $580.00 EACH $1,160.00 Heimes Corp. $1,152.16 EACH $2,304.32 Anderson Excavating Co. $550.00 EACH $1,100.00 General Excavating $642.00 EACH $1,284.00 K-2 Construction $3,675.00 EACH $7,350.00 88 787.001 CONSTRUCT 1"TAP TO M.U.D. MAIN Engineeer's Estimate 2 @ $675.00 EACH $1,350.00 L.G.Roloff Construction Company, Inc. $560.00 EACH $1,120.00 Luxa Construction Co., Inc. $660.00 EACH $1,320.00 Hawkins Construction Co. $467.96 EACH $935.92 Cedar Construction $640.00 EACH $1,280.00 1 Heimes Corp. $1,152.16 EACH $2,304.32 Anderson Excavating Co. $625.00 EACH $1,250.00 General Excavating $672.00 EACH $1,344.00 K-2 Construction $3,675.00 EACH $7,350.00 89 900.089 REMOVE TEMPORARY ACCESS ROAD AND CREEK CROSSING Engineeer's Estimate 1 @ $6,000.00 per LS $6,000.00 L.G. Roloff Construction Company, Inc. $5,000.00 per LS . $5,000.00 Luxa Construction Co., Inc. $6,360.00 per LS $6,360.00 Hawkins Construction Co. $5,486.11 per LS $5,486.11 Cedar Construction $3,200.00 per LS $3,200.00 Heimes Corp. $13,793.61 per LS $13,793.61 Anderson Excavating Co. $5,000.00 per LS $5,000.00 General Excavating $11,640.00 per LS $11,640.00 K-2 Construction $4,000.00 per LS $4,000.00 90 900.090 RED OAK TREE Engineeer's Estimate 3 @ $600.00 EACH $1,800.00 L.G. Roloff Construction Company, Inc. $576.95 EACH $1,730.85 Luxa Construction Co., Inc. $385.00 EACH $1,155.00 Hawkins Construction Co. $370.55 EACH $1,111.65 Cedar Construction $420.00 EACH $1,260.00 Heimes Corp. $633.10 EACH $1,899.30 Anderson Excavating Co. $650.00 EACH $1,950.00 General Excavating $396.00 EACH • $1,188.00 K-2 Construction $1,030.00 EACH $3,090.00 Page 21 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 :55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 dmin for project OPW 50986 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type , Line# Item # Description Quantity Price Total 91 900.091 SYCAMORE TREE • Engineeer's Estimate 3 @ $600.00 EACH $1,800.00 L.G.Roloff Construction Company, Inc. $544.89 EACH $1,634.67 Luxa Construction Co., Inc. $385.00 EACH $1,155.00 Hawkins Construction Co. $370.55 EACH $1,111.65 Cedar Construction $420.00 EACH $1,260.00 Heimes Corp. $597.93 EACH $1,793.79 Anderson Excavating Co. $650.00 EACH $1,950.00 General Excavating . $396.00 EACH $1,188.00 K-2 Construction $1,030.00 EACH $3,090.00 92 900.092 INSTALL SOLID COVERS Engineeer's Estimate 11 @ $400.00 EACH $4,400.00 L.G. Roloff Construction Company, Inc. $200.00 EACH $2,200.00 Luxa Construction Co., Inc. $201.00 EACH $2,211.00 Hawkins Construction Co. $246.95 EACH $2,716.45 Cedar Construction $220.00 EACH $2,420.00 Heimes Corp. $186.13 EACH $2,047.43 Anderson Excavating Co. $225.00 EACH $2,475.00 General Excavating $270.00 EACH $2,970.00 K-2 Construction $239.85 EACH $2,638.35 93 900.093 RAILROAD INSURANCE COVERAGE AND SAFETY TRAINING Engineeer's Estimate 1 @ $5,000.00 per LS $5,000.00 L.G.Roloff Construction Company, Inc. $3,900.00 per LS $3,900.00 Luxa Construction Co., Inc. $2,145.00 per LS $2,145.00 Hawkins Construction Co. $2,165.94 per LS $2,165.94 Cedar Construction $10,000.00 per LS $10,000.00 Heimes Corp. $5,275.82 per LS $5,275.82 Anderson Excavating Co. $5,000.00 per LS $5,000.00 General Excavating $12,330.00 per LS $12,330.00 K-2 Construction $1,725.00 per LS $1,725.00 94 900.094 TRAFFIC CONTROL AND SITE PROTECTION Engineeer's Estimate 1 @ $25,000.00 per LS $25,000.00 L.G. Roloff Construction Company, Inc. $6,500.00 per LS $6,500.00 Luxa Construction Co., Inc. $7,700.00 per LS $7,700.00 Hawkins Construction Co. $7,514.63 per LS $7,514.63 Cedar Construction $7,760.00 per LS $7,760.00 Heimes Corp. $8,206.83 per LS $8,206.83 Anderson Excavating Co. $30,000.00 per LS $30,000.00 General Excavating $10,664.00 per LS $10,664.00 K-2 Construction $8,047.47 per LS $8,047.47 95 900.095 PROJECT SIGNS Engineeer's Estimate 1 @ $2,500.00 per LS $2,500.00 L. G.Roloff Construction Company, Inc. $475.00 per LS $475.00 Luxa Construction Co., Inc. $1,150.00 per LS $1,150.00 Hawkins Construction Co. $1,524.57 per LS $1,524.57 Cedar Construction $2,000.00 per LS $2,000.00 Heimes Corp. $393.93 per LS $393.93 Anderson Excavating Co. $800.00 per LS $800.00 General Excavating $3,335.00 per LS $3,335.00 K-2 Construction $386.40 per LS $386.40 Page 22 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 r project OPW 50986 :55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 dmin for project OPW 50986 PM, Bid Tabulation, Generated by:admin for project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type . Line# Item # Description Quantity Price Total 96 900.096 FLOW MONITOR AND RAIN GAUGE Engineeer's Estimate 1 @ $25,000.00 per LS $25,000.00 L.G. Roloff Construction Company, Inc. $18,650.00 per LS $18,650.00 Luxa Construction Co., Inc. $19,350.00 per LS $19,350.00 Hawkins Construction Co. $17,077.87 per LS $17,077.87 Cedar Construction $20,850.00 per LS $20,850.00 Heimes Corp. $23,530.54 per LS $23,530.54 Anderson Excavating Co. $18,600.00 per LS $18,600.00 General Excavating $28,573.00 per LS $28,573.00 K-2 Construction $19,208.57 per LS $19,208.57 97 900.097 CONSTRUCT VEGETATED FILTER STRIP Engineeer's Estimate 1 @ $1,800.00 per LS $1,800.00 L.G.Roloff Construction Company, Inc. $1,092.00 per LS $1,092.00 Luxa Construction Co., Inc. $300.00 per LS $300.00 Hawkins Construction Co. $857.09 per LS $857.09 Cedar Construction $980.00 per LS $980.00 Heimes Corp. $4,689.62 per LS $4,689.62 Anderson Excavating Co. $1,500.00 per LS $1,500.00 General Excavating $4,924.00 per LS $4,924.00 K-2 Construction $1,600.00 per LS • • $1,600.00 98 900.098 DETENTION BASIN OUTLET STRUCTURE(OUTLET WORKS) Engineeer's Estimate 1 @ $2,500.00 per LS $2,500.00 L.G.Roloff Construction Company, Inc. $4,656.00 per LS $4,656.00 Luxa Construction Co., Inc. $5,500.00 per LS $5,500.00 Hawkins Construction Co. $2,796.00 per LS $2,796.00 Cedar Construction $3,500.00 per LS $3,500.00 Heimes Corp. $6,213.74 per LS $6,213.74 Anderson Excavating Co. $12,000.00 per LS $12,000.00 General Excavating $7,620.00 per LS $7,620.00 K-2 Construction $1,324.52 per LS $1,324.52 99 900.099 CONSTRUCT CONCRETE ARCH Engineeer's Estimate 1 @ $1,000.00 per LS $1,000.00 L.G. Roloff Construction Company, Inc. $776.00 per LS $776.00 Luxa Construction Co., Inc. $1,925.00 per LS $1,925.00 Hawkins Construction Co. $585.26 per LS $585.26 Cedar Construction $980.00 'per LS $980.00 Heimes Corp. $1,172.40 per LS $1,172.40 Anderson Excavating Co. $2,500.00 per LS $2,500.00 General Excavating $2,333.00 per LS $2,333.00 K-2 Construction $915.00 per LS $915.00 100 900.100 IMPRINTING CONCRETE SURFACE w/COBBLESTONE FORM Engineeer's Estimate 326 @ $9.50 per SF $3,097.00 L.G.Roloff Construction Company, Inc. $8.55 per SF $2,787.30 Luxa Construction Co., Inc. $13.35 per SF $4,352.10 Hawkins Construction Co. $12.86 per SF $4,192.36 Cedar Construction $9.00 per SF $2,934.00 Heimes Corp. $20.34 per SF $6,630.84 Anderson Excavating Co. $13.50 per SF $4,401.00 General Excavating $13.70 per SF $4,466.20 K-2 Construction $13.97 per SF $4,554.22 :: %; Corrected Extension Page 23 of 25, 11/4/2009 1:55:12 PM, Bid Tabulation, Generated by:admin for project OPW 50986 r project OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type , Line# Item # Description Quantity Price Total 101 900.101 CONSTRUCT REINFORCED CONCRETE CURB WALL , Engineeer's Estimate 50 @ $30.00 per SF $1,500.00 L. G. Roloff Construction Company,Inc: $37.39 per SF $1,869.50 Luxa Construction Co., Inc. $25.63 per SF $1,281.50 Hawkins Construction Co. $24.67 per SF $1,233.50 Cedar Construction $38.00 per SF $1,900.00 • Heimes Corp. $40.57 per SF $2,028.50 Anderson Excavating Co. $27.00 per SF $1,350.00 General Excavating • $26.30 per SF $1,315.00 K-2 Construction $26.80 per SF $1,340.00* 102 900.102 CONSTRUCT CONCRETE CURB RAMP w/DETECTABLE WARNINGS Engineeer's Estimate 1784 @ $9.00 per SF $16,056.00 L. G. Roloff Construction Company, Inc. $9.07 per SF $16,180.88 Luxa Construction Co., Inc. $15.60 per SF $27,830.40 Hawkins Construction Co. $15.03 per SF $26,813.52 Cedar Construction $9.30 per SF p $16,591.20 Heimes Corp. $16.82 per SF $30,006.88 Anderson Excavating Co. $15.75 per SF $28,098.00 General Excavating $16.00 per SF $28,544.00 K-2 Construction $16.33 per SF _ $29,132.72 103 900.103 REMOVE ABANDONED UTILITY PIPE Engineeer's Estimate 100 @ $12.00 per LF $1,200.00 L.G. Roloff Construction Company, Inc. $7.00 per LF $700.00 Luxa Construction Co., Inc. $9.56 per LF $956.00 Hawkins Construction Co. $12.05 per LF $1,205.00 Cedar Construction $11.00 per LF $1,100.00 Heimes Corp. $10.73 per LF $1,073.00 Anderson Excavating Co. $7.50 per LF $750.00 General Excavating $19.70 per LF $1,970.00 K-2 Construction $32.00 per LF $3,200.00 104 900.104 RECONNECT SANITARY SERVICE TO EXISTING SEWER Engineeer's Estimate 2 @ $550.00 EACH $1,100.00 L.G. Roloff Construction Company, Inc. $633.00 EACH $1,266.00 Luxa Construction Co., Inc. $935.00 EACH $1,870.00 Hawkins Construction Co. $771.91 EACH $1,543.82 Cedar Construction $780.00 EACH $1,560.00 Heimes Corp. $689.50 EACH $1,379.00 Anderson Excavating Co. $750.00 EACH $1,500.00 General Excavating $873.00 EACH $1,746.00 K-2 Construction • $1,715.00 EACH $3,430.00 105 900.105 TAP EXISTING SEWER AND RECONNECT SANITARY SERVICE Engineeer's Estimate 2 @ $620.00 EACH $1,240.00 L.G. Roloff Construction Company, Inc. $934.00 EACH $1,868.00 Luxa Construction Co., Inc. $1,080.00 EACH $2,160.00 Hawkins Construction Co. $917.78 EACH $1,835.56 I Cedar Construction $860.00 EACH $1,720.00 Heimes Corp. $1,379.00 EACH $2,758.00 Anderson Excavating Co. $1,000.00 EACH $2,000.00 General Excavating $1,455.00 EACH $2,910.00 K-2 Construction $1,715.00 EACH $3,430.00 %; Corrected Extension Page 24 of 25, 11/4/2009 1:55:13 PM, Bid Tabulation, Generated by:admin for project OPW 50986 OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 Type , Line# Item # Description Quantity Price Total 106 900.106 REBUILD EXISTING MANHOLE FOR EXTERNAL FRAME SEAL INSTALLATION • Engineeer's Estimate 14 @ $1,300.00 EACH $18,200.00 L. G. Roloff Construction Company, Inc. $846.00 EACH $11,844.00 Luxa Construction Co., Inc. $1,050.00 EACH $14,700.00 Hawkins Construction Co. $582.30 EACH $8,152.20 Cedar Construction $1,420.00 EACH $19,880.00 Heimes Corp. $644.82 EACH $9,027.48 • • Anderson Excavating Co. $625.00 EACH $8,750.00 General Excavating $1,059.00 EACH $14,826.00 K-2 Construction $632.50 EACH $8,855.00 107 900.107 LOAD,HAUL AND PLACE ASPHALT MILLINGS Engineeer's Estimate 100 @ $30.00 per TON $3,000.00 L. G. Roloff Construction Company, Inc. $10.00 per TON $1,000.00 Luxa Construction Co., Inc. $9.75 per TON $975.00 Hawkins Construction Co. $16.61 per TON $1,661.00 Cedar Construction $10.00 per TON $1,000.00 • Heimes Corp. $15.34 per TON $1,534.00 Anderson Excavating Co. $15.00 per TON $1,500.00 • • General Excavating $23.10 per TON $2,310.00 K-2 Construction $11.39 per TON $1,139.00* 108 900.108 CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE Engineeer's Estimate 1 @ $3,500.00 per LS $3,500.00 L.G. Roloff Construction Company, Inc. $603.00 per LS $603.00 Luxa Construction Co., Inc. $1,115.00 per LS $1,115.00 Hawkins Construction Co. $1,036.30 per LS $1,036.30 Cedar Construction $1,275.00 per LS $1,275.00 Heimes Corp. $1,055.16 per LS $1,055.16 Anderson Excavating Co. $3,000.00 per LS $3,000.00 General Excavating $3,510.00 per LS $3,510.00 K-2 Construction $1,810.67 per LS $1,810.67 109 900.109 CONSTRUCT CONCRETE MANHOLE RING COLLAR Engineeer's Estimate 3 @ $350.00 EACH $1,050.00 L.G. Roloff Construction Company, Inc. $157.00 EACH $471.00 Luxa Construction Co., Inc. $83.00 EACH $249.00 Hawkins Construction Co. $334.05 EACH $1,002.15 Cedar Construction $175.00 EACH $525.00 Heimes Corp. $410.34 EACH $1,231.02 Anderson Excavating Co. $400.00 EACH $1,200.00 General Excavating $642.00 EACH $1,926.00 K-2 Construction $915.00 EACH $2,745.00 (LINES 1 Through 109 INCLUSIVE) * Corrected Extension Bid Tabulation, generated y a min on 1/4/2 09 1:55:13 PM for project OPW 50986 CERTIFIED BY: /y., --Aie i' ,. ' DATE: I ��1�0 J Page 25 of 25, 11/4/2009 1:55:13 PM, Bid Tabulation, Generated by:admin for project OPW 50986 . dar Construction $860.00 EACH $1,720.00 Heimes Corp. $1,379.00 EACH $2,758.00 Anderson Excavating Co. $1,000.00 EACH $2,000.00 General Excavating $1,455.00 EACH $2,910.00 K-2 Construction $1,715.00 EACH $3,430.00 %; Corrected Extension Page 24 of 25, 11/4/2009 1:55:13 PM, Bid Tabulation, Generated by:admin for project OPW 50986 OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 C-asa CITY OF OMAHA LEGISLATIVE CHAMBER Omaha,Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, bids were submitted on November 4, 2009 for OPW 50986-(CSO), being 42" Street and"X" Street Area Sewer Separation Project; and, • WHEREAS, L.G. Roloff Construction Co., Inc. submitted a bid of $970;228.58, being the lowest and best bid received for OPW 50986 (CSO). NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, the contract with L.G. Roloff Construction Co., Inc. for OPW 50986 (CSO), being 42"d Street and "X" Street Area Sewer Separation Project in the amount of$970,228.58 is hereby approved; and that the Finance Department is authorized to obligate $970,228.58 from the Sewer Revenue Improvement Fund 21124, CSO Control Implementation Organization 116918 with the provision that upon closing of the pending SRF/ARRA loan contract with the Nebraska Department of Environmental Quality the funds will be paid from the ARRA CSO Control Implementation Fund 17117, ARRA OPW 50986 42"d & "X" Street Organization 117752. 122409scp APPROVED AS TO FORM: ---‘.0,- /2-2-a7 —CITY ATTORNEY DATE By i'Vaelet7'C4%44,14444 Councilmember Adopted /1::: 2 2009 �0 c ity Clerks./dt/Y G— ` Approved. .,.. Mayor 900.108 CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE Engineeer's Estimate 1 @ $3,500.00 per LS $3,500.00 L.G. Roloff Construction Company, Inc. $603.00 per LS $603.00 Luxa Construction Co., Inc. $1,115.00 per LS $1,115.00 Hawkins Construction Co. $1,036.30 per LS $1,036.30 Cedar Construction $1,275.00 per LS $1,275.00 Heimes Corp. $1,055.16 per LS $1,055.16 Anderson Excavating Co. $3,000.00 per LS $3,000.00 General Excavating $3,510.00 per LS $3,510.00 K-2 Construction $1,810.67 per LS $1,810.67 109 900.109 CONSTRUCT CONCRETE MANHOLE RING COLLAR Engineeer's Estimate 3 @ $350.00 EACH $1,050.00 L.G. Roloff Construction Company, Inc. $157.00 EACH $471.00 Luxa Construction Co., Inc. $83.00 EACH $249.00 Hawkins Construction Co. $334.05 EACH $1,002.15 Cedar Construction $175.00 EACH $525.00 Heimes Corp. $410.34 EACH $1,231.02 Anderson Excavating Co. $400.00 EACH $1,200.00 General Excavating $642.00 EACH $1,926.00 K-2 Construction $915.00 EACH $2,745.00 (LINES 1 Through 109 INCLUSIVE) * Corrected Extension Bid Tabulation, generated y a min on 1/4/2 09 1:55:13 PM for project OPW 50986 CERTIFIED BY: /y., --Aie i' ,. ' DATE: I ��1�0 J Page 25 of 25, 11/4/2009 1:55:13 PM, Bid Tabulation, Generated by:admin for project OPW 50986 . dar Construction $860.00 EACH $1,720.00 Heimes Corp. $1,379.00 EACH $2,758.00 Anderson Excavating Co. $1,000.00 EACH $2,000.00 General Excavating $1,455.00 EACH $2,910.00 K-2 Construction $1,715.00 EACH $3,430.00 %; Corrected Extension Page 24 of 25, 11/4/2009 1:55:13 PM, Bid Tabulation, Generated by:admin for project OPW 50986 OPW 50986 or project OPW 50986 nding the school from these areas and therefore an increase in the number of students walking and riding their bikes. NDOR Nebraska o.,..,,a a st r„r,,')nno rlen�M neM ni Gnode 988 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR CITY OF OMAHA, NEBRASKA REPRESENTATIVES Omaha/Douglas Civic Center AUTH ago REPRESENTATIVE Omaha NE 68183 I�KQ ACORD 25(2009/01) ©1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Services website at www.das.state.ne.us 2) If the Contractor indicates on such attestation form that he or she Building Construction C-3 10/2009 • N - CD " 5 C CD _. a n o � N." � 6.� o ib. 00 .n N CD � ,,••' � O - 6 5, cu 1 ' & O c a t : 1. !`' III1uuIIIIIIH '< �-! UQc. p 0 C� 0 ..• NO �. b (7 • C/- t1 CD , O (D �O c CD E.UQ ".3 CD cc) `-C ,pr CDCD . • • 1 d: 0.0% Engineer's Total: $1,443,538.80 Contract Total $0.00 Total Penalties: $0.00 Total Payments: $0.00 Contractor: Phone#: Fax#: Email address: • • Page 1 of 25, 11/4/2009 1:55:11 PM, Bid Tabulation, Generated by:admin for project OPW 50986 ft, Approvei`�`�=' J Mayor p C"uo, � � C or