RES 2011-0688 - Lease of property adjacent to 1015 Farnam St for outdoor eating or drinking area to Lance Wang s
Planning Department
v`,;A`, �t N El/ Omaha/Douglas Civic Center
��IvC�'kV n r 1819 Farnam Street,Suite 1100
�®, t {I i a �y 1,33 Omaha,Nebraska 68183
o,. • .�.. t 1 1A Z5 (402)444 5150
Ao �ti. COO
.,g �• :; Telefax(402)444-6140
4,TFDFEB". rnt v� Lek xik4
.'1 1 k ;. fay R.E.Cunningham,RA,F.SAME
City of Omaha VI 4; , Director
Jim Suttle,Mayor
June 7, 2011
Honorable President
and Members of the City Council,
Re: 1015 Farnam Street
Attached is a request of Lance Wang for permission to install wrought iron fence for outdoor
dining area located at 1015 Farnam Street.
This request has been reviewed and the recommendations of the Departments are as follows:
The City Planning Department and Public Works Department do recommend the request.
A plot plan showing the location of the proposed outdoor dining area is attached.
LEGAL DESCRIPTION: See attached.
Respectfully submitted,
Its.;.///7/ali 1i 41201
R. Cunnin irr, RA;F.'A Date
..• 'lanning Dir:- o
Referred to City Council for Consideration:
//-f/ 22V
Ro ert G. Stubbe, P.E. Date M r Office Date
Public Works Director
Pin 1043 d1h
ed.
BE IT FURTHER RESOLVED:
THAT, the City Council hereby authorizes the Mayor and City Clerk to sign the attached
Agreement on behalf of the City of Omaha.
1213htp
APPROVED AS TO FORM:
$ 3 ,//-
DEPUTY CITY ATTORNEY DATE
By
Exhibit"A" '
C u ilmember
Adopted JUN 7 20.1 -O
Approved /; '
�. , Mayor
Public Roads Classifications and Standards.
4. Safety Inspection of In-Service Bridges, 2004
5. Fracture Critical Techniques for Steel Bridges, 2006
6. Bridge Inspection Program Manual, 2010
7. Coding Guide for Structure Inventory and Appraisal, published by the State, March 2002.
8. AASHTO LRFD Bridge Design Specifications, 4th Edition, 2007
SECTION 5. The total cost of this work is currently estimated to be $15,626.16, with the City's
twenty (20) percent share being $3,125.23. Both parties recognize this is a preliminary estimate
and the final costs may well be higher or lower. Costs incurred by the State with respect to the
entire project shall be considered as a part of the total cost of the project to be paid out of City
and Federal funds. It is also understood that the costs incurred by the State attributable to this
project, will not include any administrative cost or expenses of State administrative officials.
Project No. BR-NBIS(91) - 2 -
Control No. 00840
Fracture Critical Bridge Inspections
.70
Insp 2- Inspector 2 Technologist II Salisbury,Tracy $21.10
Insp 2- Inspector 2 Technologist II Schrader, Sean $17.00
CM Insp 2 - Inspector 2 Field/Lab Tech III Wells, Brant $15.20
* Denotes Certified Erosion and Sediment Control Inspector EXHIBIT"B" 1
Page 3 of 4
and bridge
Insp 1-Inspector 1 construction sites. Completes related reports documenting tests performed,
prepare/deliver samples to testing laboratory.
Competency in all Field Technician tasks,conduct on-site inspections of construction
Insp 2-Inspector 2 methods and materials including soil placement and compaction,concrete quality,
placement,and reinforcing steel,and masonry. Documents inspection results in
SiteManager. Communicate test results to construction site management.
EXHIBIT"B"
Page 1 of 4
tan
Utilities District (MUD) and allow water from no other source to be discharged to the sanitary sewer
system. Charges for sewer service for all structures at the YOUTH CAMP shall be based upon water
consumption. MUD will direct bill sewer charges as now and hereafter established in the Omaha
Municipal Code, currently Section 31, Article IV, on each water account on OMAHA's behalf.
UI I T yr vivir111r1
PLANNING DEPARTMENT
PERMITS & INSPECTION DIVISION
• 1 ` LEASE APPLICATION
• (See Reverse Side for Additional Information) •
F L In addition to completing this form, the applicant must provide the following: • .
1. A dimensioned drawing of the land to be used. This drawing must include all existing improyements of
city property, i.e. curb, sign, posts, fire hydrants, etc., and the location of the property line. Show the are,
(length and.width) of City property to be leased. .
2. Any other information requested by the Planning Department, and/or the Public Works Departmen
necessary to evaluate the proposed use. .
3. Application fee of$100.00. (Fee not refundable.) •
4. Bond (if required - see back)
Street Address of private property adjacent to leased property lO I S FAiu 1Jt4 *5r
Legal Description of the private property leEST URA3T '4' Sty 4 •
Private Property Owner helkicE (✓/\W,- /V/„$ FARMMT V2Sc 72 '
(Name) (Address) (Phone)
Applicant . •
(If not property owner) (Name) (Address) • (Daytime Phone)
•
Description of Intended Use 57-pF &FA) k' CA. Fit— Ad /zrro 44.4 S :'
xl � ` •
If application is for Radio/Phone Tower complete the following:. • •
Replacement of existing pole Y N If replacement, height of existing pole
. .Ground space required if greater than 3 Sq. Ft. Pole height to top of antenna
y / / •
Date • Appnature
•
Date Adjacent Private Property Owner Signature
FOR OFFICE USE ONLY
( frrAPPROVED7F . ( APPROVED.
( IE ( )) DENIED
f
. • hi ;2$4
Pla ing it for - - D e . Public Works Director ate
CITY CO NCIL APPR AL REQUIRED Y N . (
APPROV D
CITY CO ESOLUTION # ( ) DENIED
DATE PASSED
ANNUAL LEASE FEE $
DATE LEASE ESTABLISHED Other Applicable Director . Date
BY • . (FINANCE DEPT.) • .
ECTION 5. The total cost of this work is currently estimated to be $15,626.16, with the City's
twenty (20) percent share being $3,125.23. Both parties recognize this is a preliminary estimate
and the final costs may well be higher or lower. Costs incurred by the State with respect to the
entire project shall be considered as a part of the total cost of the project to be paid out of City
and Federal funds. It is also understood that the costs incurred by the State attributable to this
project, will not include any administrative cost or expenses of State administrative officials.
Project No. BR-NBIS(91) - 2 -
Control No. 00840
Fracture Critical Bridge Inspections
.70
Insp 2- Inspector 2 Technologist II Salisbury,Tracy $21.10
Insp 2- Inspector 2 Technologist II Schrader, Sean $17.00
CM Insp 2 - Inspector 2 Field/Lab Tech III Wells, Brant $15.20
* Denotes Certified Erosion and Sediment Control Inspector EXHIBIT"B" 1
Page 3 of 4
and bridge
Insp 1-Inspector 1 construction sites. Completes related reports documenting tests performed,
prepare/deliver samples to testing laboratory.
Competency in all Field Technician tasks,conduct on-site inspections of construction
Insp 2-Inspector 2 methods and materials including soil placement and compaction,concrete quality,
placement,and reinforcing steel,and masonry. Documents inspection results in
SiteManager. Communicate test results to construction site management.
EXHIBIT"B"
Page 1 of 4
tan
Utilities District (MUD) and allow water from no other source to be discharged to the sanitary sewer
system. Charges for sewer service for all structures at the YOUTH CAMP shall be based upon water
consumption. MUD will direct bill sewer charges as now and hereafter established in the Omaha
Municipal Code, currently Section 31, Article IV, on each water account on OMAHA's behalf.
•
•
•
.113
•
. -Y :
•
•
..� _ • is .. .. • ..
•
•
•
.. •
A .
r.
I'0j5'::: 4P , '/ ' •
. , 4
.
a lx
•
N9 • kk
3 /9
f
t
•
•
•
F IM�i• 1 .�`� ,k t
f
rt3 fi rx
4 4
(1àI14i' *J A#Le-
from
authorized representative.
.•„,-
•
•
• • •
. .
. • V.
•
•
•
•
4/26/2011
C-25A CITY OF OMAHA
LEGISLATIVE CHAMBER
Omaha,Nebraska June 7, 2011
RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA:
WHEREAS, Lance Wang has applied for a lease of City property adjacent to 1015
,,, Farnam Street, Omaha,Nebraska for purposes of an outdoor eating or drinking area and fence, as
described on the attached application; and,
WHEREAS,the application of Lance Wang has been examined and approved by the
City Planning and Public Works Departments,and otherwise found to be in compliance with all City
regulations.
NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF OMAHA:
THAT, the application of Lance Wang for a lease of City property adjacent to 1015
Farnam Street, Omaha, Nebraska for purposes of an outdoor eating or drinking area and fence, as
described on the application,be and hereby is approved,contingent upon continued compliance with
all requirements made and provided by law;and the Finance Department is directed to issue a billing
statement and a lease form to the applicant for execution and return.
APPROVED AS TO FORM:
MTY ATTORNEY DATE
Pln 1044d1h
• By...
u cilmember
Adopted � JUN 0 7 20 1 . ----0
4,
_- ._ ` .City Clerk !&
Approved
Mayor
4,ecet
/Phone Tower complete the following:. • •
Replacement of existing pole Y N If replacement, height of existing pole
. .Ground space required if greater than 3 Sq. Ft. Pole height to top of antenna
y / / •
Date • Appnature
•
Date Adjacent Private Property Owner Signature
FOR OFFICE USE ONLY
( frrAPPROVED7F . ( APPROVED.
( IE ( )) DENIED
f
. • hi ;2$4
Pla ing it for - - D e . Public Works Director ate
CITY CO NCIL APPR AL REQUIRED Y N . (
APPROV D
CITY CO ESOLUTION # ( ) DENIED
DATE PASSED
ANNUAL LEASE FEE $
DATE LEASE ESTABLISHED Other Applicable Director . Date
BY • . (FINANCE DEPT.) • .
ECTION 5. The total cost of this work is currently estimated to be $15,626.16, with the City's
twenty (20) percent share being $3,125.23. Both parties recognize this is a preliminary estimate
and the final costs may well be higher or lower. Costs incurred by the State with respect to the
entire project shall be considered as a part of the total cost of the project to be paid out of City
and Federal funds. It is also understood that the costs incurred by the State attributable to this
project, will not include any administrative cost or expenses of State administrative officials.
Project No. BR-NBIS(91) - 2 -
Control No. 00840
Fracture Critical Bridge Inspections
.70
Insp 2- Inspector 2 Technologist II Salisbury,Tracy $21.10
Insp 2- Inspector 2 Technologist II Schrader, Sean $17.00
CM Insp 2 - Inspector 2 Field/Lab Tech III Wells, Brant $15.20
* Denotes Certified Erosion and Sediment Control Inspector EXHIBIT"B" 1
Page 3 of 4
and bridge
Insp 1-Inspector 1 construction sites. Completes related reports documenting tests performed,
prepare/deliver samples to testing laboratory.
Competency in all Field Technician tasks,conduct on-site inspections of construction
Insp 2-Inspector 2 methods and materials including soil placement and compaction,concrete quality,
placement,and reinforcing steel,and masonry. Documents inspection results in
SiteManager. Communicate test results to construction site management.
EXHIBIT"B"
Page 1 of 4
tan
Utilities District (MUD) and allow water from no other source to be discharged to the sanitary sewer
system. Charges for sewer service for all structures at the YOUTH CAMP shall be based upon water
consumption. MUD will direct bill sewer charges as now and hereafter established in the Omaha
Municipal Code, currently Section 31, Article IV, on each water account on OMAHA's behalf.
'�7 r CD C4. tj 0 r o "r1 N
A � N •CA 'p C ' d CD r
E . F o M
0. CD Q17t O. 0 CA
�. P- �• o n O rr
,tip
Dts. _ cn
` r? . p 'CS' 6' CD O
c t.
P. . 'C cofPTj
"6 r:LCD . " 0• et 't "'•
CD"
t.
n' n a� v CD o
03
OD \
cm
A) CT) " N It' 0
Sr°n O. EE CrCr0) 4
U4 CCDD vsi 0 A. a. in" VI p
•
r�
r•.�` ,
` �
•
•
•
•
4/26/2011