RES 2011-0654 - Change orders for Thompson Construction for OPW 51705, West Maple bioswale project '! cONHA,NFe • A( T* R C E! Public Works Department ze ier t! Omaha/Dou las Civic Center ' j1italt-h f !! p b 1819 Farnam Street,Suite 601 ® fi �► � May 24, 2011 1 1 t7 f" o'w y��'; 3� Omaha,Nebraska 68183-0601 i0o,4 ~ (402)444-5220 4TFD FEBR�' ,, f'y� Fax(402)444-5248 City of Omaha '�at0ti4dui^ Robert G.Stubbe,P.E. Jim Suttle,Mayor Public Works Director Honorable President and Members of the City Council, Transmitted herewith is a Resolution approving three Change Orders for OPW 51705, being the West Maple Bioswale Project, located near 166th Street and Maple Street. Resolution No. 1174 on October 20, 2009 approved Thompson Construction as low bidder for this project. These change orders authorize expenses for additional work needed for the final stabilization of the embankment and for right-of-way restoration, which were not anticipated and included in the original bid specifications. Thompson Construction has agreed to perform these services for an additional total of $37,319.00. The attached Change Orders contain the details of the additional work. All other provisions of the original contract shall remain in full force and effect. The costs incurred will be paid from the 2006 Environment Fund 13122, 2011 Issue Environment Bond Organization 117216. The Public Works Department requests your consideration and approval of the attached Resolution and Change Order. Respectfully submitted, Referred to City Council for Consideration: /V\ bka.12611 Ro ert G. S ubbe, P.E. Date May is ffice Date Pu lic Works Director Approved as to Funding: Approved: 8�l1 &ltd-v\elA_) U(NQ- 6/l f t � Pam Spaccarotella Date• Human Rights and Relations f K..E4_ Date Finance Director Department 1216htp .1.17 0 40 THOMPSON P.I. 1i 6 111IY0TIN 11002 PIONS 402-411.4161 - 111 412.411•4144 . /10 CONSTRUCTION INC. WWW.TIINPS11011ST10DT11111/.01N PROPOSAL DATE: 4/5/2011 TO: City of Omaha Public Works Department Bid Date: 4/5/2011 1819 Farnam St. Omaha, Ne 68183 Project: OPW 51705 ATTN:. Geoff Goodwin Location: Omaha,NE RE: Quotation Re-Design for West Maple Bioswale West Maple Bioswale NO. ITEM DESCRIPTION UNIT @ Unit Price EST.QUAN. TOTAL 1 Mobilization LS @ $2,500.00 1 $ 2,500.00 2 Remove Mat&Exposed Pipe LS @ $1,000.00 1 $ 1,000.00 3 Grade &Shape Ditch (Is) LS @ $2,000.00 1 $ 2,000.00 4 Enkamat 7020 Matting SY @ $ 9.00 1910 $17,190.00 5 Flexterra w/Fescue SY @ $ 2.00 1876 $ 3,752.00 6 Fescue Sod SY @ $ 6.00 34 $ 204.00 7 Scour Stop SF @ $ 17.00 304 $ 5,168.00 8 Super Turf II Drilled Seed SY @ $ 0.90 3900 $ 3,510.00 TOTAL $35,324.00 LESS 1 Less Enkamat 7020 provided by supplier $ 1,425.00 2 Less Flexterra FGM provided by supplier $ 480.00 3 Less Scour Stop provided by supplier $ 1,520.00 Sincerely, FINAL COST $31,899.00 1 Kelly Thompson, President Thompson Construction, Inc. hange Order. Respectfully submitted, Referred to City Council for Consideration: /V\ bka.12611 Ro ert G. S ubbe, P.E. Date May is ffice Date Pu lic Works Director Approved as to Funding: Approved: 8�l1 &ltd-v\elA_) U(NQ- 6/l f t � Pam Spaccarotella Date• Human Rights and Relations f K..E4_ Date Finance Director Department 1216htp r,~ ...:.• . P.O. Box 640 CONSTRUCTION, INC. Arll1gtoFax402-47a 6-4744 Phone 402-478-4751 • Fax 402-478-4744 www.thomosonconstructioninc.com • May 27, 2010 • • Doug Kellner, P.E. • TD2 10836 Old Mill Road . Omaha,Ne 68154 RE: Change Order Request#2 OPW 51705 West Maple Bioswale • Omaha,Ne Thompson Construction, Inc.proposes the following cost associated with furnishing and installing NDOR Type B seed and mulch for the disturbed right of way on the above- mentioned project. NDOR Type B Hydro Seeding w/Mulch 2800 sy @ $1.40/sy = $3,920.00 Sincerely, /Wri3- Kelly Thompson, resident Thompson Construction, Inc. ober Adopted HA 4 3011 /41.1111111111ww-- ,•• - - - City Clerk 5 Mayor . _ , .....„ , ,, , , ,, _ „,,,T ' P.O. Box 640 , „ Arlington, Nebraska 68002 l CONSTRUCTION, INC. Phone 402-478-4751 • Fax 402-478-4744 www.thompsonconstructioninc.com, May 27, 2010 Doug Kellner,P.E. TD2 10836 Old Mill Road Omaha,Ne 68154 RE: Change Order Request#1 OPW 51705 • West Maple Bioswale Omaha,Ne Thompson Construction, Inc. proposes the following cost associated with removal and replacement of broken concrete on the slope of the Papio Creek bank for stabilization on the above-mentioned project. The extra work required the use of an excavator and operator. Cat 325 Excavator w/operator 10 hrs @ $150.00/hr = $1,500.00 Sincerely, • /41-5---ipe Kelly Thompson,President Thompson Construction, Inc. ,•• - - - City Clerk 5 Mayor c-25a CITY OF OMAHA LEGISLATIVE CHAMBER Omaha,Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, Thompson Construction was awarded a contract by City Council Resolution No. 1174 on October 20, 2009, to construct OPW 51705, being the West Maple Bioswale Project, located near 166th Street and Maple Street; and, WHEREAS, it is necessary to add items not originally anticipated in the specifications for the project with regard to final embankment stabilization and right-of-way restoration; and, WHEREAS, Thompson Construction has agreed to perform the services listed in the attached Change Order Nos. 1 through 3, which by this reference is made a part hereof, for a total additional cost of$37,319.00, which will be paid from the 2006 Environment Fund 13122, 2011 Issue Environment Bond Organization 117216. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, Change Order Nos. 1 through 3 for Thompson Construction to construct the necessary modifications to OPW 51705 being the West Maple Bioswale project, located near 166th Street and Maple Street, are hereby approved. BE IT FURTHER RESOLVED: THAT, the Finance Department is authorized to pay an additional $37,319.00 for these changes from the 2006 Environment Fund 13122, 2011 Issue Environment Bond Organization 117216. 1215htp APPROVED AS TO FORM: ifreivr-44 5-7 2-1( PUTY CITY ATTORNEY DATE 1.✓. By. Councilmenber Adopted...BAY. 4 �l Ci. Clerks Approved '= Mayor bka.12611 Ro ert G. S ubbe, P.E. Date May is ffice Date Pu lic Works Director Approved as to Funding: Approved: 8�l1 &ltd-v\elA_) U(NQ- 6/l f t � Pam Spaccarotella Date• Human Rights and Relations f K..E4_ Date Finance Director Department 1216htp 0 0 7� cn PPk) P aj 0 CD I O• o 0 a 7 Z C]. CD C) '� d CD CD ', , Co ' (--) . ,-, -, — 0 0 ,„ (..,..) 7-' \ , ..._... 0 \ 0 it't• :::, p# N N CAD �� cz .� Cr g O O c~n' 0' a g• cD Og + n CD C( CD � ,AD � CD 0 `C O -t NnO" ' •-t� .-- CD uL1iiH • • _'r.,, .t , .t roject. The extra work required the use of an excavator and operator. Cat 325 Excavator w/operator 10 hrs @ $150.00/hr = $1,500.00 Sincerely, • /41-5---ipe Kelly Thompson,President Thompson Construction, Inc. ,•• - - - City Clerk 5 Mayor