City of Omaha '�at0ti4dui^ Robert G.Stubbe,P.E.
Jim Suttle,Mayor Public Works Director
Honorable President
and Members of the City Council,
Transmitted herewith is a Resolution approving three Change Orders for OPW 51705, being the
West Maple Bioswale Project, located near 166th Street and Maple Street. Resolution No. 1174
on October 20, 2009 approved Thompson Construction as low bidder for this project. These
change orders authorize expenses for additional work needed for the final stabilization of the
embankment and for right-of-way restoration, which were not anticipated and included in the
original bid specifications.
Thompson Construction has agreed to perform these services for an additional total of
$37,319.00. The attached Change Orders contain the details of the additional work. All other
provisions of the original contract shall remain in full force and effect. The costs incurred will
be paid from the 2006 Environment Fund 13122, 2011 Issue Environment Bond Organization
117216.
The Public Works Department requests your consideration and approval of the attached
Resolution and Change Order.
Respectfully submitted, Referred to City Council for Consideration:
/V\ bka.12611
Ro ert G. S ubbe, P.E. Date May is ffice Date
Pu lic Works Director
Approved as to Funding: Approved:
8�l1 <d-v\elA_) U(NQ- 6/l f
t
� Pam Spaccarotella Date• Human Rights and Relations f K..E4_ Date
Finance Director Department
1216htp
.1.17 0 40
THOMPSON P.I. 1i 6 111IY0TIN 11002
PIONS 402-411.4161 - 111 412.411•4144
. /10 CONSTRUCTION INC. WWW.TIINPS11011ST10DT11111/.01N
PROPOSAL
DATE: 4/5/2011
TO: City of Omaha Public Works Department Bid Date: 4/5/2011
1819 Farnam St.
Omaha, Ne 68183 Project: OPW 51705
ATTN:. Geoff Goodwin Location: Omaha,NE
RE: Quotation Re-Design for West Maple Bioswale
West Maple Bioswale
NO. ITEM DESCRIPTION UNIT @ Unit Price EST.QUAN. TOTAL
1 Mobilization LS @ $2,500.00 1 $ 2,500.00
2 Remove Mat&Exposed Pipe LS @ $1,000.00 1 $ 1,000.00
3 Grade &Shape Ditch (Is) LS @ $2,000.00 1 $ 2,000.00
4 Enkamat 7020 Matting SY @ $ 9.00 1910 $17,190.00
5 Flexterra w/Fescue SY @ $ 2.00 1876 $ 3,752.00
6 Fescue Sod SY @ $ 6.00 34 $ 204.00
7 Scour Stop SF @ $ 17.00 304 $ 5,168.00
8 Super Turf II Drilled Seed SY @ $ 0.90 3900 $ 3,510.00
TOTAL $35,324.00
LESS
1 Less Enkamat 7020 provided by supplier $ 1,425.00
2 Less Flexterra FGM provided by supplier $ 480.00
3 Less Scour Stop provided by supplier $ 1,520.00
Sincerely, FINAL COST $31,899.00
1
Kelly Thompson, President
Thompson Construction, Inc.
hange Order.
Respectfully submitted, Referred to City Council for Consideration:
/V\ bka.12611
Ro ert G. S ubbe, P.E. Date May is ffice Date
Pu lic Works Director
Approved as to Funding: Approved:
8�l1 <d-v\elA_) U(NQ- 6/l f
t
� Pam Spaccarotella Date• Human Rights and Relations f K..E4_ Date
Finance Director Department
1216htp
r,~ ...:.• . P.O. Box 640
CONSTRUCTION, INC. Arll1gtoFax402-47a 6-4744
Phone 402-478-4751 • Fax 402-478-4744
www.thomosonconstructioninc.com
•
May 27, 2010
•
• Doug Kellner, P.E. •
TD2
10836 Old Mill Road .
Omaha,Ne 68154
RE: Change Order Request#2
OPW 51705
West Maple Bioswale •
Omaha,Ne
Thompson Construction, Inc.proposes the following cost associated with furnishing and
installing NDOR Type B seed and mulch for the disturbed right of way on the above-
mentioned project.
NDOR Type B Hydro Seeding w/Mulch 2800 sy @ $1.40/sy = $3,920.00
Sincerely,
/Wri3-
Kelly Thompson, resident
Thompson Construction, Inc.
ober
Adopted HA 4 3011
/41.1111111111ww--
,••
- - - City Clerk 5
Mayor
. _ , .....„ , ,, , , ,, _ „,,,T ' P.O. Box 640
, „ Arlington, Nebraska 68002
l CONSTRUCTION, INC. Phone 402-478-4751 • Fax 402-478-4744
www.thompsonconstructioninc.com,
May 27, 2010
Doug Kellner,P.E.
TD2
10836 Old Mill Road
Omaha,Ne 68154
RE: Change Order Request#1
OPW 51705 •
West Maple Bioswale
Omaha,Ne
Thompson Construction, Inc. proposes the following cost associated with removal and
replacement of broken concrete on the slope of the Papio Creek bank for stabilization on
the above-mentioned project. The extra work required the use of an excavator and
operator.
Cat 325 Excavator w/operator 10 hrs @ $150.00/hr = $1,500.00
Sincerely, •
/41-5---ipe
Kelly Thompson,President
Thompson Construction, Inc.
,••
- - - City Clerk 5
Mayor
c-25a CITY OF OMAHA
LEGISLATIVE CHAMBER
Omaha,Nebraska
RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA:
WHEREAS, Thompson Construction was awarded a contract by City Council Resolution
No. 1174 on October 20, 2009, to construct OPW 51705, being the West Maple Bioswale
Project, located near 166th Street and Maple Street; and,
WHEREAS, it is necessary to add items not originally anticipated in the specifications
for the project with regard to final embankment stabilization and right-of-way restoration; and,
WHEREAS, Thompson Construction has agreed to perform the services listed in the
attached Change Order Nos. 1 through 3, which by this reference is made a part hereof, for a
total additional cost of$37,319.00, which will be paid from the 2006 Environment Fund 13122,
2011 Issue Environment Bond Organization 117216.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF OMAHA:
THAT, as recommended by the Mayor, Change Order Nos. 1 through 3 for Thompson
Construction to construct the necessary modifications to OPW 51705 being the West Maple
Bioswale project, located near 166th Street and Maple Street, are hereby approved.
BE IT FURTHER RESOLVED:
THAT, the Finance Department is authorized to pay an additional $37,319.00 for these
changes from the 2006 Environment Fund 13122, 2011 Issue Environment Bond Organization
117216.
1215htp APPROVED AS TO FORM:
ifreivr-44 5-7 2-1(
PUTY CITY ATTORNEY DATE
1.✓.
By.
Councilmenber
Adopted...BAY.
4
�l Ci. Clerks
Approved '=
Mayor
bka.12611
Ro ert G. S ubbe, P.E. Date May is ffice Date
Pu lic Works Director
Approved as to Funding: Approved:
8�l1 <d-v\elA_) U(NQ- 6/l f
t
� Pam Spaccarotella Date• Human Rights and Relations f K..E4_ Date
Finance Director Department
1216htp
0 0 7�
cn PPk) P aj 0 CD I
O• o 0 a 7
Z C]. CD C) '� d CD CD ', ,
Co
' (--) . ,-, -, — 0 0 ,„ (..,..) 7-' \
, ..._... 0
\ 0 it't• :::, p# N N CAD ��
cz
.� Cr
g O O c~n' 0' a g• cD Og +
n CD C( CD � ,AD � CD 0
`C O -t NnO" ' •-t�
.--
CD uL1iiH
•
•
_'r.,, .t , .t
roject. The extra work required the use of an excavator and
operator.
Cat 325 Excavator w/operator 10 hrs @ $150.00/hr = $1,500.00
Sincerely, •
/41-5---ipe
Kelly Thompson,President