Loading...
RES 2011-0817 - Agmt with Union Pacific Railroad Company for reconstruction of W Center Rd at-grade public road crossing near 156th St °N1AHA,NFd • .3-4•,z, / �' Public Works Department s Asi' rfi` ea. Omaha/Douglas Civic Center i� !t f1 �1! June 28, 2011 1819 Farnam Street,Suite GOl o�" =.,ry� Omaha,Nebraska 68183-0601 (402)444-5220 Ao�-l'FD FE130' Fax(402)444-5248 City of Omaha Robert G.Stubbe,P.E. Jim Suttle,Mayor Public Works Director Honorable President and Members of the City Council, Transmitted herewith is a resolution approving a Supplemental Agreement to allow additional funding for the reconstruction and widening of the existing West Center Road at-grade public road crossing at or near 156th Street, at the Union Pacific Railroad Company's (Railroad) Mile Post 24.93 on its Millard Industrial Lead (DOT No. 816-928N). The Public Road Crossing Improvement Agreement between the Railroad and the City of Omaha was approved by City Council Resolution 32 on January 12, 2010 The Railroad originally estimated the cost of this work to be $140,211.00 as detailed in Exhibit "B" of the attached agreement, however, the actual cost of the project is now known to be $240,127.00. The Railroad will perform the work, and the City will reimburse the Railroad for one hundred (100%) of the actual costs. The additional cost of$99,916.00 will be paid from the 2006 Transportation Bond Fund 13182, 2010 Issue Transportation Bond Organization 117115, with 80% of the cost eligible for reimbursement from the Nebraska Department of Roads. The Public Works Department requests your consideration and approval the attached resolution and agreement. Respectfully submitted, Referred to City Council for Consideration: ?;—/fr, -/We/71-tD - 3 I ;a r/it-a9 12-o i lI Robert G. Stubbe, P.E. Date Mayor's Office : Date Public Works Director Approved as to Funding: Pam Spaccarotella Date e..6 Finance Director 1222htp DATE: 4 - /Q - /( (PU LIC ORKS DIRECTOR) 1 ..., .. 1 1'`" '"�" E&A CONSULTING GROUP,INC. �i .m. • o .� e.:a 1 ,.<.,q w' CCM/ i t i SEMEWANDEROSION DE YARD EAGNEERNG.PIN.",R.G.f:E1DSERICES ''''i ..4 m . 0.:-11 f.a(iiaaau+. - CONTROLPLAN o...t¢m< - .f-m e......v 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. ♦ _•. UN OM BUILDING AMERICA' PFrc 11111 UPRR Folder No.: 2587-77 UPRR Audit No.: 92183 SUPPLEMENTAL AGREEMENT THIS SUPPLEMENTAL AGREEMENT is made as of the 4day of , 20#/ , by and between UNION PACIFIC RAILROAD COMPANY, a Delaware corporation,or its predecessor in interest, (hereinafter the"Railroad")and(the)CITY OF OMAHA, a Nebraska municipal corporation with a mailing address at 1819 Farnam Street, Suite 604, Omaha,Nebraska 68183 (hereinafter the "City"). RECITALS: By instrument dated August 15, 1958,the parties hereto or their predecessors in interest(if any), entered into an agreement(herein the "Basic Agreement") identified as Railroad's Audit No. 92183,covering the construction,maintenance and use of the West Center Road at-grade public road crossing,(DOT No. 816-928N),located at Mile Post 24.93 on its Millard Industrial Lead in Omaha, Douglas County,Nebraska(hereinafter the "Roadway"). By Supplemental Agreement dated January 12, 2010, the parties hereto amended the agreement to reconstruct and widen the Roadway. The parties now desire to modify the Supplemental Agreement by adding additional Railroad Cost Estimates. AGREEMENT: NOW,THEREFORE, IT IS AGREED by and between the parties hereto as follows: SECTION 1 - AMENDMENT OF PARAGRAPH A OF SECTION 3 OF THE SUPPLEMENTAL AGREEMENT Effective as of the date herein written, Paragraph A of Section 3 of the Basic Agreement, shall be, and hereby is amended to read as follows: The work to be performed by the Railroad,at the City's sole cost and expense,is described in: • the Railroad's Track&Surface Material Estimate dated April 12,2011,in the amount of$29,892.00, and • the Railroad's Signal Material Estimate dated April 12,2011,in the amount of$210,235.00, collectively marked Exhibit B, attached hereto and hereby made a part hereof(the "Estimate"). 2587-77 City of Omaha,NE Page 1 of 2 April 28,2011 West Center Road E&A CONSULTING GROUP,INC. �i .m. • o .� e.:a 1 ,.<.,q w' CCM/ i t i SEMEWANDEROSION DE YARD EAGNEERNG.PIN.",R.G.f:E1DSERICES ''''i ..4 m . 0.:-11 f.a(iiaaau+. - CONTROLPLAN o...t¢m< - .f-m e......v 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. 1 rY BUILDING AMERIC (1 MCI IC 11111 • SECTION 2 - EFFECTIVE DATE This Supplemental Agreement shall be effective as of the date herein written. SECTION 3- AGREEMENT SUPPLEMENTAL This agreement is supplemental to the Basic Agreement, as herein amended, and nothing herein contained shall be construed as amending or modifying the same except as herein specifically provided. IN WITNESS WHEREOF,the parties hereto have caused this Supplemental Agreement to be executed as of the day and year first hereinabove written. UNION PACIFIC RAILROAD COMPANY 'decal Tax IA #94-6001323) BY: III!Am.A. U G. A" LL en ,r Manage Contracts WITNESS: CITY OF OMAHA 440,1/ x , .ram; 3 / BUST BROWN SUTTLE City Clerk • Mayor APPROVED AS TO FORM: By (110‘ ALAN M. THELEN Deputy City Attorney 2587-77 City of Omaha,NE Page 2 of 2 April 28,2011 West Center Road t dated January 12, 2010, the parties hereto amended the agreement to reconstruct and widen the Roadway. The parties now desire to modify the Supplemental Agreement by adding additional Railroad Cost Estimates. AGREEMENT: NOW,THEREFORE, IT IS AGREED by and between the parties hereto as follows: SECTION 1 - AMENDMENT OF PARAGRAPH A OF SECTION 3 OF THE SUPPLEMENTAL AGREEMENT Effective as of the date herein written, Paragraph A of Section 3 of the Basic Agreement, shall be, and hereby is amended to read as follows: The work to be performed by the Railroad,at the City's sole cost and expense,is described in: • the Railroad's Track&Surface Material Estimate dated April 12,2011,in the amount of$29,892.00, and • the Railroad's Signal Material Estimate dated April 12,2011,in the amount of$210,235.00, collectively marked Exhibit B, attached hereto and hereby made a part hereof(the "Estimate"). 2587-77 City of Omaha,NE Page 1 of 2 April 28,2011 West Center Road E&A CONSULTING GROUP,INC. �i .m. • o .� e.:a 1 ,.<.,q w' CCM/ i t i SEMEWANDEROSION DE YARD EAGNEERNG.PIN.",R.G.f:E1DSERICES ''''i ..4 m . 0.:-11 f.a(iiaaau+. - CONTROLPLAN o...t¢m< - .f-m e......v 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. 1 UN70N • BUILDING AMERICA° I EXHIBIT B RAILROAD ENGINEERING DESIGN REVIEW & FLAGGING ESTIMATE TO SUPPLEMENTAL AGREEMENT DESCRIPTION OF WORK: Perform plan review, engineering inspection, & installation services for City of Omaha Nebraska during the crossing surface extension and new cantilevers signals, Millard Industrial Lead, MP 24.93, USDOT No. 816-928N. Plan Review, Inspection Services and Installation Services will be billed to the City of Omaha, Nebraska on an actual cost basis. LOCATION: Omaha, Douglas County, Nebraska DATE: November 30,2009 DESCRIPTION LABOR MATERIAL AUTHORITY TOTAL INSTALLATION $40,912.00 $87,299.00 $128,211.00 SERVICES ENGINEERING $12,000.00 $12,000.00 REVIEW Labor Additives (65.43%) TOTAL PROJECT $52,912.00 $87,299.00 $140,211.00 TOTAL ESTIMATED COST OF PROJECT LESS CREDITS $140,211.00 THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. IN THE EVENT OF AN INCREASE OR DECREASE IN THE COST OF AMOUNT OF MATERIAL OR LABOR REQUIRED, THE AUTHORITY WILL BE BILLED FOR ACTUAL COST AT THE CURRENT RATES EFFECTIVE THEREOF. Exhibit B Railroad's Engineering Design Review&Flagging Estimate SECTION 1 - AMENDMENT OF PARAGRAPH A OF SECTION 3 OF THE SUPPLEMENTAL AGREEMENT Effective as of the date herein written, Paragraph A of Section 3 of the Basic Agreement, shall be, and hereby is amended to read as follows: The work to be performed by the Railroad,at the City's sole cost and expense,is described in: • the Railroad's Track&Surface Material Estimate dated April 12,2011,in the amount of$29,892.00, and • the Railroad's Signal Material Estimate dated April 12,2011,in the amount of$210,235.00, collectively marked Exhibit B, attached hereto and hereby made a part hereof(the "Estimate"). 2587-77 City of Omaha,NE Page 1 of 2 April 28,2011 West Center Road E&A CONSULTING GROUP,INC. �i .m. • o .� e.:a 1 ,.<.,q w' CCM/ i t i SEMEWANDEROSION DE YARD EAGNEERNG.PIN.",R.G.f:E1DSERICES ''''i ..4 m . 0.:-11 f.a(iiaaau+. - CONTROLPLAN o...t¢m< - .f-m e......v 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. • • DATE: 2011-04-12 FFF� f ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK L I BY THE r UNION PACIFIC RAILROAD • THIS ESTIMATE GOOD FOR 6 MONTHS EXPIRATION DATE IS :2011-10-11 DESCRIPTION OF WORY,: INSTALL 24 FEET OF ROAD CROSSING SURFACE AT 156TH CIRCLE IN OMAHA NE. MP. 24.98 ON THE MILLARD INDUSTRIAL LEAD. CITY OF 01.6ViA.TO PAY FOR 100k OF THE COST USING FEDERAL LABOR ADDITIVES WITH INDIRECT AND OVERHEAD COST OP 2055 PM: 73140 AMOs 08929 MP,SUBDIV: 24.98, MILLARD SERVICE UNIT: 03 CITY: LANE STATES HR • DESCRIPTION - QTY UNIT LABOR MATERIAL RECOLL UPRR TOTAL • ENGINEERING WORK ENGINEERING 1400 1400 1400 LABOR ADDITIVE 205% 2870 2870 2870 (� ' t TOTAL ENGINEERING 4270 4270 4270 TRACK & SURFACE WORK DILL PREP 500 500 500 KNVIRONMITAL — PERMITS 1 1 1 FOREIGN LINE FREIGHT 72 72 72 HOME LINE FREIGHT SOO 500 5O0 LABOR ADDITIVE 205t- 11483 11483 11483 MATE STORE EXPENSE 18 18 18 RDXINO 24.00 TF 7030 3757 1079S 10795 1.... SALES TAX 165 165 165 WELD 1712 376 2088 2088 TOTAL TRACK & SURFACE 20733 4889 25622 25622 1 � LABOR/MATERIAL EXPENSE 25003 488$ -------- --- ^--- RECOLLECTIBLE/UPRR EXPENSE 29892 0 -------- ESTIMATED PROJECT COST 29892 t t EXISTING REUSEADLE MATERIAL CREDIT 0 SALVAGE NONUSEABLE MATERIAL CREDIT 0 Jfk RECOLLECT'IBLE LESS CREDITS THE AROVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO•FLUCZUATION. IN THE EVENT OF _ I .AN INCREASE OR DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED UPRR WELL BILL FOR ACTUAL CONSTRUCTION COSTS-AT THE CURRENT EFFECTIVE RATE. • • in +` 1 l .. Exhibit B Railroad's Track&Surface Material Estimate f:E1DSERICES ''''i ..4 m . 0.:-11 f.a(iiaaau+. - CONTROLPLAN o...t¢m< - .f-m e......v 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. DATE: 2011-04-12 ESTIMATE OF MATERIAL AND FORCE ACCOUNT WORK BY THE UNION PACIFIC RAILROAD THIS ESTIVATE GOOD FOR 6 MONTHS EXPIRA'LION DATE IS :2011-10-11 DESCRIPTION OF WORK: INSTALL NEW 16 BOLT CANTILEVER ON THE NORTH SIDE MD A HEW 4 DOLT CANTILEVER ON THE SOUTH SIDE 3T OMMAHA, NR CENTER ST./HWY 92. M.P. 24.93 ON THE t4ILLARD 1'ND LD DOTY 816928N STORK TO BE PERFORMED BY RAILROAD WITH EXPENSE AS BELOW • SIGNAL - CITY - 100V ESTIMATED USING FEDERAL ADDITIVES WITH INDIRECT AND OVERHEAD CONSTRUCTION COSTS - SIGNAL - 167.762 PIG; 73137 AWO: 00930 IIP,SUBDIV: 24.93, t4ILLARD ' SERVICE UNIT: 03 CITY: LANE STATE; NE DESCRIPTION QTY UNIT LABOR MATERTAL RECOLL UPRR TOTAT, ENGINEERING WORK ENGINEERING 1821 1821. 1821. LABOR ADDITIVE 167.76V 11142 11142 11142 SIG-HNY XHG 4821 4821. 4821 TOTAL ENGINEERING 17784 17784 11784 SIGNAL WORK DILL. PREP 900 900 900. • CANTILEVER (3) 56251 56251 56251 CONTRACT 1071 1071 1071 CRANE OPERATOR 5000 5000 5000 FOUNDATION REMOVAL 6000 6000 6000 LABOR ADDITIVE 161.76V 58320 58320 58320 PERSONAL EXPENSES 11250 17250 17250 ROCK/ORAVEL/FILL 700 700 700 SALES TAX 428 428 428 SIGNAL 34764 10719 45483 45483 TRA,YBP/3D/OB/RCLW CONTR 1047 104? 1047 TOTAL SIGNAL 93984 98466 192450 192450 TRACK G SURFACE WORK ENVIRONMENTAL - PERMITS 1 1 1 TOTAL TRACK 4 SURFACE 1 1 1 LABOR/MATERIAL EXPENSE 111768 98467 RECOLLBCTIBLE/UPRR EXPENSE 210235 0 ESTIMATED PROJECT COST 210235 THE ABOVE FIGURES ARE ESTIMATES ONLY AND SUBJECT TO FLUCTUATION. II7 THE EVENT OF AN INCREASE OR.DECREASE IN THE COST OR QUANTITY OF MATERIAL OR LABOR REQUIRED, ' UPRR WILL HILL FOR ACTUAL CONSTRUCTION COSTS AT THE CURRENT EFFECTIVE RATE. • ( { Ext-ibit B Railroad's Signal Material Estimate 1 l .. Exhibit B Railroad's Track&Surface Material Estimate f:E1DSERICES ''''i ..4 m . 0.:-11 f.a(iiaaau+. - CONTROLPLAN o...t¢m< - .f-m e......v 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. C-25A CITY OF OMAHA • LEGISLATIVE CHAMBER =. Omaha,Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: .., WHEREAS, the City of Omaha (City) is desirous to make improvements :by the reconstruction and widening of the existing West Center Road at-grade public road crossing, at "' or near 156th Street, at Union Pacific Railroad's (Railroad) track and right-of-way Mile Post 24.93 on its Millard Industrial Lead(DOT No. 816-928N); and, :7'; WHEREAS, the City entered into an agreement with the Railroad to perform this work by City Council Resolution 32 on January 12, 2010; and, WHEREAS, the cost of this work, originally estimated to be $140,211.00, is now known to require an additional $99,916.00 for a total project cost of $240,127, as outlined in the attached Supplemental Agreement, which by this reference becomes a part hereof; and, WHEREAS, this additional cost will be paid from the 2006 Transportation Bond Fund 13182, 2010 Issue Transportation Bond Organization 117115, with 80% of the cost eligible for reimbursement from the Nebraska Department of Roads. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, the Supplemental Agreement with Union Pacific Railroad Company (Railroad) for additional costs associated with the Railroad performing reconstruction and widening of the existing West Center Road at-grade public road crossing, at or near 156th Street, at the Railroad's Mile Post 24.93 on its Millard Industrial Lead (DOT No. 816-928N), is hereby approved. BE IT FURTHER RESOLVED: THAT the Finance Department is authorized to pay the additional sum of $99,916.00 from the 2006 Transportation Bond Fund 13182, 2010 Issue Transportation Bond Organization 117115, with 80% of the cost eligible for reimbursement from the Nebraska Department of Roads. 1221 htp APPROVED AS TO FORM: ,• X e_— i , , DEPUTY CITY ATTORNEY DATE By 1• •cilmember Adopted N.2 8:2011 7'0 ,do ovA th--' City. rk Approved ie9,001 ayor Exhibit B Railroad's Track&Surface Material Estimate f:E1DSERICES ''''i ..4 m . 0.:-11 f.a(iiaaau+. - CONTROLPLAN o...t¢m< - .f-m e......v 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. . / . r. O <'n o. F°-h can ?? a c vo (�. FA a ?' sv $ v Q' a, o 0 O a, cn o z a. . o a • •N• P CI P a �, cn % 0 N o 4 o 0 p, H p,'a p, O O o. .. N cn cu 00 o R CO n � r* , eos_wow w ° �' te•a. �'a '•� C7 N '� p N o O r r O cD ` • a, � = •-s n n UQN - c i r. C O O� c, rD a Na AD � pq . p� i-s co ON •—• co rn P- co Q•UQ CM o co n . k E,4 ' I C\ k.