Loading...
RES 2011-0803 - Subdivision agmt, ND Park /G9 OMAHA,Nye - ` �'P* RECEIVEDPublic Works Department tjtY ➢ nz?:�f-�.Ct►,-'. `s'IFUPn �y Omaha/Douglas Civic Center x '� tj (�' � June 28, 2011 ..�.7lt! ( 1819 Farnam Street,Suite 601 o'E-? r Omaha,Nebraska 68183-0601 0 -k '+,""?,' rg 402 444-5220 ieL 440 r•EaR'�*4 sm ' Fax(402)444-5248 O Mite `s , City of Omaha Robert G.Stubbe,P.E. Jim Suttle,Mayor Public Works Director Honorable President and Members of the City Council, The attached Resolution approves the Subdivision Agreement between Newstreet, LLC and the City of Omaha. This Subdivision Agreement covers the public improvement of N.D. Park (Lots 1-3) a subdivision located southwest of 14th& Cuming Streets. This Subdivision Agreement stipulates which public improvements will be built by Newstreet, LLC. The total cost of improvements will be paid by Newstreet, LLC. The Public Works Department requests your consideration and approval of the attached Resolution and Subdivision Agreement. Respectfully submitted, This action has been reviewed and found to be i e - 'rmance with the Master Plan. Ro ert G. Stubbe, P.E. Date ,� R unningham, eit Date •Public Works Director Tanning Director Approved as to Funding: Referred to C • ncil for Consideration: 644/ WanilS LtAAia, !151 !I Pam Spaccarotella Date Mayor's Office Date Finance Director P:\msp\1225msp.doc T .:s' 'V� _ gt kr �os •F14'.14 ETI ..... e 3 fi.. k rya 4gt;� 9s a947 cli RggAi "°'° °a __ E&A CONSULTING GROUP,INC. eybe--x.O I FINAL PLAT N.D.P ARK •• ENGINEERING•PLANNING•FIELD SERVICED Engineeer's Estimate 480 @ $50.00 per SF $24,000.00 L.G.Roloff Construction Company, Inc. $36.43 per SF $17,486.40 Graham Construction $36.71 per SF $17,620.80 Hawkins Construction Co. $20.87 per SF $10,017.60 . K-2 Construction $40.25 per SF $19,320.00 . Judds Bros Construction Co $35.00 per SF $16,800.00 146 900.146 CONSTRUCT CONCRETE CURB RAMP w/DETECTABLE WARNINGS Engineeer's Estimate 2620 @ $20.00 per SF $52,400.00 L.G.Roloff Construction Company, Inc. $13.47 per SF $35,291.40 Graham Construction $13.60 per SF $35,632.00 Hawkins Construction Co. $9.03 per SF $23,658.60 K-2 Construction $14.95 per SF $39,169.00 Judds Bros Construction Co $15.00 per SF $39,300.00 147 900.147 UNION PACIFIC RAILROAD INSURANCE AND FEES COVERAGE Engineeer's Estimate 1 @ $8,000.00 per LS $8,000.00 L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. SUBDIVISION AGREEMENT N.D. PARK (Lots 1-3) This Subdivision Agreement, made this / /p day of 2011 by and between the NEWSTREET, LLC, a Utah limited liability company (hereinafter referred to as "SUBDIVIDER"), and the CITY OF OMAHA (hereinafter referred to as "CITY"). WHEREAS, Subdivider is the owner of the land included within the proposed plat attached.hereto as Exhibit "A", which parcel of land (hereinafter referred to as the "Area to be Developed") is within the corporate limits of the City; and, WHEREAS, the Subdivider proposes that the Subdivider will build public and private improvements in the area to be developed; and, WHEREAS, the Subdivider will connect to the sewer system of the City of Omaha; and, WHEREAS, the Subdivider and City desire to agree on the method for the installation and allocation of expenses for public improvements to be constructed in the property. NOW, THEREFORE, in consideration of the above the following is agreed between the parties hereto: 1. Public improvements. Attached hereto as Exhibit "B" and incorporated herein by reference are plans showing the public and private improvements to be installed on the property, i.e. storm sewer, and paving of public streets (hereinafter referred to as "IMPROVEMENTS"). All improvements must receive the approval of the Public Works Department of the City prior to construction. 2. Water, gas, and electrical power. The Subdivider agrees to enter into Agreements with Metropolitan Utilities District for gas and water service, and into an Agreement with the Omaha Public Power District for power service. Copies of all Agreements with the Metropolitan Utilities District and the Omaha Public Power District will be provided to the City within four months from the date of this Agreement. 3. Installation of improvements. The Subdivider agrees to commence the timely and orderly followingexecution of this Agreement, pursuant to Section installation of the improvement , 9 53-9 of the Omaha Municipal Code. 4. Payment for improvements. The Subdivider shall pay the cost of all the improvements, as well as all charges by the Metropolitan Utilities District for gas and water line services and charges by the Omaha Public Power District for Underground electrical service or overhead power service. 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. seventy-five percent (75%) of the drainage sub-basin serviced by these erosion control measures are fully developed, and with the written permission of the City Public Works Department authorizing their removal. Sediment removal shall be paid by the Subdivider. 6. Payment of Storm Sewer Fees: The City of Omaha Storm Sewer Fee shall be paid by the Owner/Builder of each lot prior to issuance of a building permit. 7. Interceptor Sewer Fees. Omaha Interceptor Sewer Fees do not apply to the Area-to be Developed as it is situated within the corporate limits of the City of Omaha. 8. Post Construction Stormwater Management: A Post Construction Stormwater Management Plan has been prepared and previously approved by the City of Omaha, a copy of which is attached hereto and incorporated herein as Exhibit "D". The initial construction cost of post construction stormwater facilities shall be paid for privately by the Subdivider. Post Construction facilities shall be owned and maintained by Subdivider, their successors or assigns, including any proposed owners association to be formed. 9. Binding effect. The Subdivision Agreement shall be binding upon the parties, their respective successors, and assigns. m sewer, and paving of public streets (hereinafter referred to as "IMPROVEMENTS"). All improvements must receive the approval of the Public Works Department of the City prior to construction. 2. Water, gas, and electrical power. The Subdivider agrees to enter into Agreements with Metropolitan Utilities District for gas and water service, and into an Agreement with the Omaha Public Power District for power service. Copies of all Agreements with the Metropolitan Utilities District and the Omaha Public Power District will be provided to the City within four months from the date of this Agreement. 3. Installation of improvements. The Subdivider agrees to commence the timely and orderly followingexecution of this Agreement, pursuant to Section installation of the improvement , 9 53-9 of the Omaha Municipal Code. 4. Payment for improvements. The Subdivider shall pay the cost of all the improvements, as well as all charges by the Metropolitan Utilities District for gas and water line services and charges by the Omaha Public Power District for Underground electrical service or overhead power service. 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. • IN WITNESS WHEREOF, we the executing parties, by our respective duly authorized agents, hereby enter into this Agreement, effective on the day and year first above written. ATTEST: CITY OF OMAHA 0 44, _ . / / I Y CLE Dat M /4 R Date • NEWSTREET, LLC, a Utah Limited Liability Company 4 N& _ f 7 i lri IV 51/sIt l Bet :_ ks, S cretary Date APPROVED AS TO FORM , k/y.Z--r C- ) -q ASSISTANT CITY ATTORNEY DATE STATE OF NEBRASKA ) )SS COUNTY OF DOUGLAS ) On this'L3 th day of May, 2011, before me, a Notary Public in and for said County and State, personally appeared Jerry Banks, Secretary of NEWSTREET, LLC, a Utah Limited Liability Company, who executed the above and foregoing easement acknowledged the execution thereof to be his voluntary act and deed. GENERAL NOTARY-State of Nebraska ;r;� tFsue ar�ca Li. c)I_,f-oi.---) �1YQxnm.EKp MaYP3.1d14 OTARY PUBLIC My Commission expires V\ak1 23, 2V-A- . binding upon the parties, their respective successors, and assigns. m sewer, and paving of public streets (hereinafter referred to as "IMPROVEMENTS"). All improvements must receive the approval of the Public Works Department of the City prior to construction. 2. Water, gas, and electrical power. The Subdivider agrees to enter into Agreements with Metropolitan Utilities District for gas and water service, and into an Agreement with the Omaha Public Power District for power service. Copies of all Agreements with the Metropolitan Utilities District and the Omaha Public Power District will be provided to the City within four months from the date of this Agreement. 3. Installation of improvements. The Subdivider agrees to commence the timely and orderly followingexecution of this Agreement, pursuant to Section installation of the improvement , 9 53-9 of the Omaha Municipal Code. 4. Payment for improvements. The Subdivider shall pay the cost of all the improvements, as well as all charges by the Metropolitan Utilities District for gas and water line services and charges by the Omaha Public Power District for Underground electrical service or overhead power service. 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. • • • ii a3 9 K I 1 ' I • 1 I I(' • I Rt h .., 1 �. I Izt I �'1 I I • $8 I .. m e F �• 1 1��1 I 1 clI Im _l A tou.at L ^.',; I.— — — 1 A , amica L___ ____i Imo _ — -. a a 8 N.15TH ST a I f 8 $ 'i g a $ R I F 8 Not°211W IN,653.09 • �n J — 4 — in.sl �g 1 _- --i ; MAT '�' 1 1 co z g 0 _ 138{ � f tl i I ?; i'y�+a '=� i `Le `.':;. �, l��g '','''i .SS 1e J l� — -- MIT S 02`72'48'E,261rT $ 02`5541'E,38t.7 t' N,14TH ST E; § . $ — I� f07.00 ^' I 81~ J ~ � .;�., I I 1 t -—7 I I a o O I 1 " ' '1 €� 9PJ{ a 1 q4144 $ R a pQ 7F7;g il a Ro i A19 i A • i 41 HT '4a' ei"g- 4 Pi III PAR i7`qh g b fvlai' g '' oa 1I ( ' 1111141 `�y a a R 1 uhIi1 y ' 9 q aR iR f ilii 3 u R � loggi gll :: P E&A CONSULTING GROUP,INC. c..r.:a rzr�.. FINAL PLAT N.D.PARK T ENG:P:EERNG•PIAMING•MU)SERVICES EXHIBIT'A . ow,i.trw. :r...neroan•e•v . •ym • .� >,-.xt i�.•e. .ngetv.•y+p,tc..nat-.v�yrpc.exy - - allation of the improvement , 9 53-9 of the Omaha Municipal Code. 4. Payment for improvements. The Subdivider shall pay the cost of all the improvements, as well as all charges by the Metropolitan Utilities District for gas and water line services and charges by the Omaha Public Power District for Underground electrical service or overhead power service. 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. • dil9 4tIh:! � Q a far ,p !Y ■■ aafS1 11.c,i Fln 03n e 0 y mZ . tf 4(1 a 0 Z o , � i I{f it iN � 1'� � I ii AIENI--A611 -‘ -.14v i P t 1 g, ...3. • 1 S 1311416 qWSt1 NSMO`, _ - s:�:- ,,,,,ci,:;1- - - .....!: C*; - ; 4 . d !� i� wIf , , ,, $6 11;rI•4-;- 1:11 , I 1' k• :a I, iI 3. � 1t;"'� i,p a � j 1 11?p :!I I I r I1.1 ei , Oke o 4' :' .:',.\.A. 10.1.1M".....i.w.: . •.- _ _• -in Ir 0 a % anus,uq,ti waou 7. pp 5q' _. • Q II . i • ! 1 1 1Ii eeeeeeee P D a • ifiju 1 • , m'�" ef;a E&A CONSULTING GROUP,INC. 9-1 a�' p ,.. ` ,` RAVING�IMPRO`IMPROVEMENT m� .� I a>m, �+n�+ sib THE YARD ENG?iEERNG.PIAN'ANG.FIELD SERVICES y P(AN anA mow+ a-,•m,>a an r.w V. a rw i"g- 4 Pi III PAR i7`qh g b fvlai' g '' oa 1I ( ' 1111141 `�y a a R 1 uhIi1 y ' 9 q aR iR f ilii 3 u R � loggi gll :: P E&A CONSULTING GROUP,INC. c..r.:a rzr�.. FINAL PLAT N.D.PARK T ENG:P:EERNG•PIAMING•MU)SERVICES EXHIBIT'A . ow,i.trw. :r...neroan•e•v . •ym • .� >,-.xt i�.•e. .ngetv.•y+p,tc..nat-.v�yrpc.exy - - allation of the improvement , 9 53-9 of the Omaha Municipal Code. 4. Payment for improvements. The Subdivider shall pay the cost of all the improvements, as well as all charges by the Metropolitan Utilities District for gas and water line services and charges by the Omaha Public Power District for Underground electrical service or overhead power service. 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. • 1111111 1M IlIgN 41 it Will illigl l H l ilkg i 1 ag I . °fi$g111 1 i1iglIR NI! iii 1f$Q a}8d4I2lG ?-167� A• $. 5 8 8 3g.j!iJiii g RE .g F2; o p aF g i4f��� �5 l 1 f �PI ;111 ail, 1iiligi Al 1 li ip 4 i 4- g a a Al 4i A. C 4 /1 �4R ,ell i ll / s1 is i 1 P? • i . II R i • • �peF� • a� Cnr 0 • a<4`_ o!^• • • .lqt.( u v B7? 1 _ -I • , I • — _ — — — YJ C._--.,ll——._i0--- r• o .�i+--'dM uP--.- _--•_ __i---•�::...,� -.�;--- ma's mg N1tl0.V 4 6 rn - - -i th �. z :�J� - i I. i m 0 L . - .�ro,d I Seri.• • • 1 . 0 1 0 r � ' ' ' J , -1 •I T. ' ` ;' :i : i ' . ; t : � -4p ;a. Il'., . i ' t . a - i- -Im = ., , 1 • • . .2_4" ... \liyilas "tleig411 " ' - , .-Ilirj . 7-t"-- 111 1°•i r-T) — .-.< . • • ' TB • f' kt' ol I: ; ` - v I .it t• I.I. :' I i 4ftH- I , ii moo-; .��it.' Crrm—.�-C777., �"-- 1 I , 4 I. i -._.-,—____ anus wtt w _: . 0 - - i_��_" '-_ ,.a-, __. -.--"-------( --_ �'-i—.: — _,-..- _= - _f _ - q --- , ..r'y_ - -- -- - • • • -- - - . .. �� � z a PE R g a g gl4 . s . dill 10,, 4 S Q . `"'4ca -- 7.: 9I ; .� II llt qpiiiii!iiiii 4 >€ 3 1 R F I ws § • «i.i 1 ..., .. 1 1'`" '"�" E&A CONSULTING GROUP,INC. �i .m. • o .� e.:a 1 ,.<.,q w' CCM/ i t i SEMEWANDEROSION DE YARD EAGNEERNG.PIN.",R.G.f:E1DSERICES ''''i ..4 m . 0.:-11 f.a(iiaaau+. - CONTROLPLAN o...t¢m< - .f-m e......v 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. C-25A CITY OF OMAHA LEGISLATIVE CHAMBER • Omaha,Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, Newstreet, LLC proposes to build a subdivision to be known as N.D. Park(Lots 1-3) which will be located southwest of 14th & Cuming Streets; and, WHEREAS, Newstreet, LLC will build public and private improvements in this subdivision; and, WHEREAS,the parties wish to agree upon the manner and the extent to which funds may be expended in connection with public improvements to be constructed within the area to be developed or serving the area to be developed and the extent to which the contemplated public improvements specifically benefit property in the area to be developed and to what extent the cost of the same shall be specially assessed; and, WHEREAS, a Subdivision Agreement has been prepared setting forth all the provisions mentioned above. NOW,THEREFORE,BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT,the Subdivision Agreement between the City of Omaha and Newstreet,LLC as recommended by the Mayor, providing for the public improvements, is hereby approved. The Subdivision is to be known as N.D. Park (Lots 1-3) and is located southwest of 14th & Cuming Streets. P:\msp\1226msp.doc APPROVED AS TO FORM: r-)-1/ ITY ATTORNEY DATE By Councilme, Adopted JUL 1 g 2011 6 _o - d City Clerk 7/4 Approved d/Q*: Mayor 1 I , 4 I. i -._.-,—____ anus wtt w _: . 0 - - i_��_" '-_ ,.a-, __. -.--"-------( --_ �'-i—.: — _,-..- _= - _f _ - q --- , ..r'y_ - -- -- - • • • -- - - . .. �� � z a PE R g a g gl4 . s . dill 10,, 4 S Q . `"'4ca -- 7.: 9I ; .� II llt qpiiiii!iiiii 4 >€ 3 1 R F I ws § • «i.i 1 ..., .. 1 1'`" '"�" E&A CONSULTING GROUP,INC. �i .m. • o .� e.:a 1 ,.<.,q w' CCM/ i t i SEMEWANDEROSION DE YARD EAGNEERNG.PIN.",R.G.f:E1DSERICES ''''i ..4 m . 0.:-11 f.a(iiaaau+. - CONTROLPLAN o...t¢m< - .f-m e......v 5. Sediment and Erosion Control Plan: A Sediment and Erosion Control Plan has been previously approved and permits issued by the NDEQ, Papio Missouri River Natural Resources District and the City of Omaha a copy of which is attached hereto and incorporated herein as Exhibit "C". The initial construction cost of grading and piping for temporary sediment and erosion control facilities shall be paid for privately by the Subdivider. Removal of said sediment and erosion control measures shall be paid for privately also. All sediment and erosion control measures are to remain in place until L.G. Roloff Construction Company,Inc. $2,788.26 per LS $2,788.26 Graham Construction $2,976.00 per LS $2,976.00 Hawkins Construction Co. $2,572.50 per LS $2,572.50 K-2 Construction $25,270.00 per LS $25,270.00 Judds Bros Construction Co $3,500.00 per LS $3,500.00 Page 24 of 25, 5/25/2011 1:18:51 PM, Bid Tabulation, Generated by:admin for project OPW 51957 admin for project OPW 51957 xtension Page 18 of 25, 5/25/2011 1:18:50 PM, Bid Tabulation, Generated by:admin for project OPW 51957 tion, Generated by:admin for project OPW 51957 specific gravity and Ph levels. The results of both tests will be submitted in a side-by-side analysis. Ca a4 '8 � 0- er n CD tV • p. o uin. 1.2 I o CA Cr 1.0 CD go c-'" . ":1 nC° �Q r � Q 74- O . . . . , ... • . . ,. ,_ . . . • ." ._ . . • , .. ci\ I • T . I r 61 t 88.00 Contract Total $0.00 Total Penalties: $0.00 Total Payments: $0.00 Contractor: Phone#: Fax#: Email address: • • Page 1 of 25, 5/25/2011 1:18:49 PM, Bid Tabulation, Generated by:admin for project OPW 51957