RES 2020-0992 - Vistancia - Preliminary Plat (Lots 513-523)LEGAL DESCRIPTION
ENGINEER
VICINITY MAP
PROJECT
SITE
VISTANCIA
LOTS 513 THROUGH 523
DOUGLAS COUNTY, NEBRASKA
LEGEND
NOTES
SUBDIVIDER
Exhibit A
Vistancia Phase 3
Woodsonia Real
Estate
Preliminary Plat
------
------
------
------
------
------
------
------
------
------
------
------
------
------
------
------
------
------
------
------
Project Name
Professional Seal
Revision Dates
Sheet Title
No.Description MM-DD-YY
Client Name
Sheet Number
thompson, dreessen & dorn er, inc.
10836 Old Mill Rd
Omaha, NE 68154
p.402.330.8860 www.td2co.com
Drawn By: Reviewed By:
Job No.: Date:
RTM SRL
2069-115 08/13/20
0'25'50'
Exhibit “B”
Conditions:
1. Coordinate with Douglas County Engineer’s Office site grade cross sections for the
southern boundary of the plat, adjacent to Fort Street.
2. Coordinate with Douglas County Engineer’s Office for any necessary permits for the
street connection to Fort Street.
3. Coordinate with Douglas County Engineer’s Office on storm sewer design plans
along the development boundary adjacent to Fort Street.
4. Coordinate with the City of Omaha Public Works on an acceptable G.O. paving plan.
5. Provide a 16 foot inbound land, a 4 foot paved median, and two 12 foot outbound
lanes, and dedicate right-of-way as needed to accommodate on the 208th Street
approach to Fort Street.
6. Remove the temporary connection to Fort Street south of 208th Avenue and Ogden
Street.
7. Provide a right-of-way dedication on the northeast corner of 207th and Ogden
Streets to accommodate the corner curb ramps.
8. Coordinate with the Planning and Public Works Departments on the Complete
Streets Design Guide Design Checklists.
9. Submit the 30% design report for the sanitary sewer to the Public Works Design
Division per Section 2.14 of the City’s Wastewater Collection System Design
Manual.
10. Provide a note on the plat stating direct access to Fort Street from all adjacent lots
or outlots will not be permitted.
11. Compliance with all applicable stormwater regulations including no net increase in
stormwater runoff and treat the first 1/2” of stormwater for water quality.
12. Coordination with city staff and submittal of an acceptable tree mitigation planting
plan regarding on-site of off-site locations.
Pln1089rf