RES 2020-0970 - PSA with Jacobs Engineering Group for OPW 53943 - MO Avenue Storm Sewer Outfall Improvements   PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT ​is hereby made and entered into this____ day of ___________, _______, by and between the City of Omaha, a municipal corporation located in Douglas County, Nebraska (hereinafter referred to as the “City”), and Jacobs Engineering Group Inc. (hereinafter referred to as the “Provider”), on the terms, conditions and provisions as set forth herein below and as appended through the incorporation of Exhibit “D”. All references to “Contractor” shall mean “Provider”. I.PROJECT NAME AND DESCRIPTION OPW 53943, Missouri Avenue Storm Sewer Outfall Improvements, This project includes an assessment of the current stormwater flow conditions in the combined sewer line upstream of CSO 117 and conceptual design services to identify alternatives that will reduce or eliminate surcharging of the line and subsequent flooding in the immediate area. II.DUTIES OF PROVIDER A.Provider agrees to perform professional services, as set out and more fully described in the Proposal attached hereto, for the City, relative to the above-referenced project which is illustrated in Exhibit “B” attached hereto. Such services shall be completed within a 250 calendar day period after receipt of a purchase order from the City. B.Provider designates Emily Holtzclaw, whose business address and phone number is 222 South 15th Street, Suite 1408-S, Omaha, Nebraska 68102, 402-609-7510 as its project manager and contact person for this project. C.Provider agrees to maintain records and accounts, including personnel, financial and property records, sufficient to identify and account for all costs pertaining to the project and certain other records as may be required by the City to assure a proper accounting for all project funds. These records shall be made available to the City for audit purposes and shall be retained for a period of five (5) years after the expiration of this Agreement. D.Provider agrees to prepare a schedule of compensation, detailing hourly rates for all compensated providers, employees, and subcontractors. E.Provider agrees to complete, within 250 calendar days of receipt of a purchase order from the City, the necessary services. The City recognizes that completion within this deadline is contingent upon timely response from utilities and City input. F.Provider agrees to have a current Contract Compliance Form (CC-1) on file with the City’s Human Rights and Relations Department prior to signing the agreement. III.DUTIES OF CITY City designates Noma Borde, whose business address and phone number are 1819 Farnam Street, Suite 600, Omaha, Nebraska 68183, 402-444-7948 as its contact person for this project, who shall provide a notice to proceed and such other written authorizations as are necessary to commence or proceed with the project and various aspects of it. <<Summary>> IV.C​OMPENSATION AND PAYMENT A.The cost of services as specified in the Scope of Service, shall be performed on an hourly basis, but in no event shall it exceed $99,736.56. Detailed breakdown of costs shall be shown in Exhibit “C”. B.Reimbursable expenses shall be billed to the City by the Provider. C.INCREASE OF FEES The parties hereto acknowledge that, as of the date of the execution of the Agreement, Section 10-142 of the Omaha Municipal Code provides as follows: Any amendment to contracts or purchases which taken alone increase the original fee as awarded (a) by ten percent, if the original fee is one hundred fifty thousand dollars ($150,000) or more, or (b) by seventy-five thousand dollars ($75,000) or more, shall be approved by the City Council in advance of the acceptance of any purchase in excess of such limits. However, neither contract nor purchase amendments will be split to avoid advance approval of the City Council. The originally approved scope and primary features of a contract or purchase will not be significantly revised as a result of amendments not approved in advance by the City Council. The provisions of this section will be quoted in all future City contracts. Nothing in this section is intended to alter the authority of the Mayor under section 5.16 of the Charter to approve immediate purchases. V.OWNERSHIP OF INSTRUMENTS OF SERVICE The City acknowledges the Provider’s documents, including electronic files, as instruments of professional service. Nevertheless, upon completion of the services and payment in full of all monies due to the Provider, the final documents prepared under this Agreement shall become the property of the City. The City shall not reuse on another Project or make any modifications to the documents without prior written authorization of the Provider. The City agrees, to the fullest extent permitted by law, to indemnify and hold harmless the Provider, its officers, directors, employees and subconsultants (collectively, Provider) against any damages, liabilities or costs, including reasonable attorneys’ fees and defense costs, arising from or in any way connected with the unauthorized reuse or modification of the documents by the City, regardless of whether such reuse or modification is for use on this Project or another Project. VI.ADDITIONAL SERVICES In the event additional services for the aforementioned Project not covered under this Agreement are required, the Provider agrees to provide such services at a mutually agreed upon cost. VII.INSURANCE REQUIREMENTS The Provider shall carry professional liability insurance in the minimum amount of one half million dollars and shall carry workers’ compensation insurance in accordance with the statutory requirements of the State of Nebraska. VIII.INDEMNIFICATION The Provider agrees, to the fullest extent permitted by law, to indemnify, defend and hold harmless the City, its officers, directors and employees (collectively, City) against all damages, liabilities or costs, including reasonable attorney’s fees and defense costs, to the extent caused by the Provider’s negligent performance of professional services under this Agreement and that of its subconsultants or anyone for whom the Provider is legally liable; provided, that with respect solely to the said duty to defend, such duty of the Provider to defend shall arise only if, and to the extent, such duty is covered by Provider’s liability insurance. The City agrees, to the fullest extent permitted by law, to indemnify and hold harmless the Provider, its officers, directors, employees and subconsultants (collectively, Provider) against all damages, liabilities or costs, including reasonable attorney’s fees and defense costs in connection with the Project, to the extent caused by the City’s negligent acts or the negligent acts of anyone for whom the City is legally liable. Neither the City nor the Provider shall be obligated to indemnify the other party in any matter whatsoever for the other party’s own negligence. IX.TERMINATION OF AGREEMENT This Agreement may be terminated by the City upon written notice to the Provider of such termination and specifying the effective date at least seven (7) days prior to the effective date of such termination. In the event of termination, the Provider shall be entitled to just and equitable payment for services rendered to the date of termination, and all finished or unfinished documents, data surveys, studies, drawings, maps, models, reports or photographs shall become, at the City’s option, its property. X.GENERAL CONDITIONS A.Non-discrimination​. Provider shall not, in the performance of this Agreement, discriminate or permit discrimination in violation of federal or state laws or local ordinances because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, age, or disability as recognized under 42 USCS 12101 et seq. and Omaha Municipal Code section 13-89, race, color, creed, religion, sex, marital status, sexual orientation, gender identity, national origin, age, or disability. B.Captions​. Captions used in this Agreement are for convenience and are not used in the construction of this Agreement. C.Applicable Laws​. Parties to this Agreement shall conform with all existing and applicable City ordinances, resolutions, state laws, federal laws, and existing and applicable rules and regulations. Nebraska law will govern the terms and the performance under this Agreement. D.Interest of the City​. Pursuant to Section 8.05 of the Home Rule Charter, no elected official or any officer or employee of the City shall have a financial interest, direct or indirect, in any City Agreement. Any violation of this section with the knowledge of the person or corporation contracting with the City shall render the Agreement voidable by the Mayor or Council. E.Interest of the Provider​. The Provider covenants that he presently has no interest and shall not acquire any interest, direct or indirect, which would conflict with the performance of services required to be performed under this Agreement; he further covenants that in the performance of this Agreement, no person having any such interest shall be employed. F.Merger​. This Agreement shall not be merged into any other oral or written agreement, lease, or deed of any type. This is the complete and full Agreement of the parties. G.Modification​. This Agreement contains the entire Agreement of the parties. No representations were made or relied upon by either party other than those that are expressly set forth herein. No agent, employee, or other representative of either party is empowered to alter any of the terms hereof unless done in writing and signed by an authorized officer of the respective parties. H.Assignment​. The Provider may not assign its rights under this Agreement without the express prior written consent of the City. I.Strict Compliance​. All provisions of this Agreement and each and every document that shall be attached shall be strictly complied with as written, and no substitution or change shall be made except upon written direction from authorized representative. J.LB 403 Contract Provisions​.​-​NEW EMPLOYEE WORK ELIGIBILITY STATUS -The Contractor is required and hereby agrees to use a federal immigration verification system to determine the work eligibility status of new employees physically performing service within the State of Nebraska. A federal immigration verification system means the electronic verification of the work authorization program authorized by the Illegal Immigration Reform and Immigrant Responsibility Act of 1996, 8 U.S.C. 1324a, known as the E-Verify Program, or an equivalent federal program designated by the United States Department of Homeland Security or other federal agency authorized to verify the work eligibility status of a newly hired employee. If the Contractor is an individual or sole proprietorship, the following applies: 1. The Contractor must complete the United States Citizenship Attestation Form, available on the Department of Administrative Services website at ​www.das.state.ne.us 2. If the Contractor indicates on such attestation form that he or she is a qualified alien, the Contractor agrees to provide the US Citizenship and Immigration Services documentation required to verify the Contractor’s lawful presence in the United States using the Systematic Alien Verification for Entitlements (SAVE) Program. 3. The Contractor understands and agrees that lawful presence in the United States is required and the Contractor may be disqualified or the contract terminated if such lawful presence cannot be verified as required by Neb. Rev. Stat. §4-108. K.Certificate of Authorization​. If this Agreement contemplates the performance of professional architecture or engineering work by the Provider, the Provider shall provide to the City, and maintain in good standing, a current Certificate of Authorization from the State of Nebraska as required by Neb. Rev. Stat. section 81-3436. L.Debarment or suspension by any federal agency. (This section applies if any part of this Agreement is funded by a federal agency.) Office of Management and Budget (OMB) guidelines require that any individual or entity that has been placed on the Excluded Parties List System (“EPLS” - available for review through ​www.sam.gov​) may not be a participant in a federal agency transaction that is a covered transaction or act as a principal of a person participating in one of those covered transactions. These guidelines apply to covered transactions under a grant from any federal agency for which a recipient expects to receive reimbursement for expenditures incurred or an advance on future expenditures. The Contractor providing goods and/or services to the City of Omaha certifies, by acceptance and execution of this Agreement, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. The Contractor further agrees, by accepting and executing this Agreement, that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts. Where the Contractor or any lower tier participant is unable to certify this statement, it shall attach an explanation to this Agreement. M.Contract Compliance Ordinance No. 35344, Section 10-192 Equal Employment Opportunity Clause During the performance of this contract, the Contractor agrees as follows: 1)The Contractor shall not discriminate against any employee or applicant for employment because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, national origin, age, or disability. The Contractor shall ensure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, marital status, sexual orientation, gender identity, national origin, age, or disability. As used herein, the word “treated” shall mean and include, without limitation, the following: recruited, whether by advertising or by other means; compensated; selected for training, including apprenticeship; promoted; upgraded; demoted; downgraded; transferred; laid off; and terminated. The Contractor agrees to and shall post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officers setting forth the provisions of this nondiscrimination clause. 2)The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, creed, religion, sex, marital status, sexual orientation, gender identity, national origin, age, or disability. 3)The Contractor shall send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding a notice advising the labor union or worker’s representative of the Contractor’s commitments under the Equal Employment Opportunity Clause of the City and shall post copies of the notice in conspicuous places available to employees and applications for employment. 4)The Contractor shall furnish to the Human Rights and Relations Director all Federal forms containing the information and reports required by the Federal government for Federal contracts under Federal rules and regulations, and including the information required by Sections 10-192 to 10-194, inclusive, and shall permit reasonable access to his records. Records accessible to the Human Rights and Relations Director shall be those which are related to Paragraphs (1) through (7) of this subsection and only after reasonable notice is given the Contractor. The purpose for this provision is to provide for investigation to ascertain compliance with the program provided for herein. 5)The Contractor shall take such actions with respect to any subcontractor as the City may direct as a means of enforcing provisions of Paragraphs (1) through (7) herein, including penalties and sanctions for noncompliance; however, in the event the Contractor becomes involved in or is threatened with litigation as the result of such directions by the City, the City will enter into such litigation as necessary to protect the interests of the City and to effectuate the provisions of this division; and in the case of contracts receiving Federal assistance, the Contractor or the City may request the United States to enter into such litigation to protect the interests of the United States. 6)The Contractor shall file and shall cause his subcontractors, if any, to file compliance reports with the Contractor in the same form and to the same extent as required by the Federal government for Federal contracts under Federal rules and regulations. Such compliance reports shall be filed with the Human Rights and Relations Director. Compliance reports filed at such times as directed shall contain information as to the employment practices, policies, programs and statistics of the Contractor and his subcontractors. 7)The Contractor shall include the provisions of Paragraphs (1) through (7) of this Section, “Equal Employment Opportunity Clause”, and Section 10-193 in every subcontract or purchase order so that such provisions will be binding upon each subcontractor or vendor. N.Conflict. In the event of any conflict between this Agreement and any of the exhibits attached hereto, the terms of this Agreement shall take precedence. EXHIBIT “A” RESERVED EXHIBIT “B” SCOPE OF SERVICES 1 Exhibit “B” SCOPE OF SERVICES Missouri Avenue Storm Sewer Outfall (OPW 53943) This Scope of Services is Exbibit B of the Standard Agreement for Professional Services between Jacobs Engineering Group Inc. (Provider), and the City of Omaha Public Works Department (City) for a project generally described as OPW 53943 Missouri Avenue Storm Sewer Outfall (Project). Project Understanding: The City has requested the Provider perform professional services to assist the City with evaluation of existing conditions and preparation of alternatives for improvements to the Missouri Avenue storm sewer from approximately Gibson Road to the outfall at the Missouri River. Provider will prepare a conceptual design for the recommended alternative. This sewer currently has a Consequence of Failure (COF) risk score of 4 out of 5, (with 5 being the highest consequence), Likelihood of Failure (LOF) structural score of 2 out of 5, and LOF maintenance score of 4 out of 5. The high COF score is mainly due to the sewer’s large size and close proximity to a railroad and levee (the sewer crosses both). The LOF scores are based on National Association of Sewer Companies (NASSCO) Pipeline Assessment Certification Program (PACP) scores from 2016 closed circuit television (CCTV) pipeline inspection data. The Missouri Avenue storm sewer outfall is equipped with a bulkhead gate (FACILITY ID 0527003) located near the Missouri River south levee station SL-676+00 and a flap gate (0527004F) located at the Missouri Avenue storm sewer outfall. Currently, the Missouri Avenue storm sewer is a combined sewer connected to the Missouri Avenue lift station at the combined sewer overflow (CSO) 117 diversion. The OPW 51997b Missouri Avenue/Spring Lake Phase 2 project will complete the sewer separation in the CSO 117 drainage area and disconnect the Missouri Avenue combined from the Missouri Avenue sanitary lift station at the CSO 117 diversion, making this sewer a separate storm sewer. The OPW 51997b project is scheduled to be complete by the end of 2020. The Packaging Corporation of America (PCA) private business is located within the project area and during normal Missouri River levels, drain their storm runoff and sanitary sewage to the Missouri Avenue storm and sanitary sewers, respectively. The PCA site is also equipped with both storm and sanitary lift stations, which discharge into the Missouri Avenue storm and sanitary sewer, respectively. During normal river levels, the bulkhead gate is open and local stormwater is discharged into the river through the Missouri Avenue storm sewer outfall. During high river levels, the low-lying area between Gibson Road and the river are subject to inundation during local storm events. The existing flap gate does not seal properly and during high river conditions, flows can surcharge the storm sewer. The bulkhead gate is manually operated and during high river levels and locally dry conditions the bulkhead gate is closed to prevent the storm sewer from surcharging. When local rainfall is anticipated, the bulkhead is manually opened to allow PCA storm water pumps to discharge to the river via the Missouri Avenue storm sewer outfall. When the river is high for an extended period of time (requiring the bulkhead gate to be closed) and local rainfall occurs the project area is susceptible to localized flooding until the bulkhead gate can be manually opened 2 and the PCA storm sewer lift station is operated. Improvements to seal the flap gate will be performed as part of OPW 51997b, however it is anticipated these improvements will be temporary until permanent improvements such as replacement of the flap gate are implemented. ARTICLE 1 - Scope of Services: The Provider shall provide professional services to the City to complete the Project scope described below. It is understood that Ms. Noma Bordé will serve as the City’s representative throughout Project execution. Emily Holtzclaw will serve as the Provider’s Project Manager. The Provider will provide the following services: Task 1: Project Management and Data Review 1.1 Project Administration Provider will perform contracting, invoicing, and management of Project team, budget, and schedule. Provider will develop and implement a Health and Safety Plan and a Quality Control (QC) Plan specific to the Project work. Provider will facilitate periodic progress meetings and provide monthly progress reports and invoices in a format acceptable to the City. QC efforts will be incorporated into the budget of individual tasks. 1.2 Kick Off Meeting Provider will facilitate one 2-hour kick-off meeting with the City staff to discuss goals, scope and schedule for the Project. Up to three (3) Provider team members will attend the Kick-Off Meeting. Provider will prepare the meeting agenda with input from the City, will prepare and distribute draft meeting summary for review and comment by the attendees, and will prepare and distribute final meeting minutes. 1.3 Coordination Meetings Provider will facilitate one 1-hour coordination meeting with the City staff, PCA staff, and others as requested by the City to identify PCA concerns and discuss PCA facility operations within the Project area. Provider will prepare the meeting agenda with input from the City, will prepare and distribute draft meeting summary for review and comment by the attendees, and will prepare and distribute final meeting minutes. Provider will facilitate one 1-hour coordination meeting with the City staff, US Army Corps of Engineers (USACE) levee program staff, and others as requested by City to coordinate with USACE regarding the purpose of the Project and to identify USACE permitting requirements. Based on input from the City, the preliminary assumption is that future replacement of the flap gate or bulkhead gate would be an operations and maintenance (O&M) submittal to the USACE and an amendment to the City’s levee O&M Manual. City staff indicated that the bulkhead gate well has a hatch with open grates that can be removed to replace this gate. In general, future excavation on or within the levee critical area will likely require more extensive coordination and Technical Review submittals to the USACE, which are not included in this scope. Provider will prepare the meeting agenda with input from the City, will prepare and distribute draft meeting 3 summary for review and comment by the attendees, and will prepare and distribute final meeting minutes. Provider will facilitate one 1-hour coordination meeting with the BNSF Railroad staff if recommended alternative includes work on BNSF property or within BNSF right-of-way. Provider will prepare the meeting agenda with input from the City, will prepare and distribute draft meeting summary for review and comment by the attendees, and will prepare and distribute final meeting minutes. Provider will facilitate up to six (6) additional periodic coordination meetings with the City as needed to facilitate coordination between the Provider, the City, and other stakeholders. 1.4 Data Gathering and Review Provider will gather and review as-built drawings, inspection data, and survey data to support the Hydrologic and Hydraulic (H&H) evaluation (Task 3 below) and other analyses to support the development of the Conceptual/Preliminary Design Report (Task 4 below). Known data needs at this time include the following: •Existing CCTV pipeline inspection data (videos and reports) in the project area provided by the City o 2011 o 2012 o 2016 o 2019/2020 •As-built plans for existing combined sewer (being converted to storm sewer in 2020 by OPW 51997b Spring Lake Phase 2 sewer separation project) for suitability for pressure conditions. These plans included but are not limited to: o SOS 2182 (1962) o CSDS 510 (1920) o CSDS 512 (1915) o OPW 51997 CSO 117 Missouri Ave/Spring Lake Park Phase 1 (2015) o OPW 51997b CSO 117 Missouri Ave/Spring Lake Park Phase 2 (2020) •City’s levee O&M Manual components relevant to the project areas. •Survey data from the OPW 51997 and OPW 51997b projects. This includes information regarding the closure of CSO 117 (Missouri Ave) diversion and repairs to the outfall flap gate included in the OPW 51997b project. •PCA storm sewer as-built plans and proposed improvements. •As-built or other plans for the Missouri Avenue storm sewer outfall bulkhead gate, and proposed improvements related to the ongoing Missouri River levee recertification. Task 2 - Field Work 2.1 Field Investigation 4 Provider will coordinate with City’s field services contractor (TREKK Design Group, LLC) to scope the performance of a field investigation of the Missouri Ave storm sewer and project components including the inlets, bulkhead gate, vaults, and flap gate. Provider will develop the field investigation scope in coordination with City staff. This scope is expected to include at least the following items: inspections of storm sewer structures and connectivity within the project area (including 360 degree imagery of specific structures) and CCTV pipeline investigation per City field inspection standards. It is assumed that TREEK is a NASSCO certified contractor. While CCTV data are available from 2016, Provider recommends that the City conduct a new CCTV pipeline investigation to assess the current condition of the pipe in the project area after the 2019 Missouri River flood event, during which this sewer was surcharged for an extended period. Provider will coordinate with City staff to identify issues and concerns with the project area and walk the parcels to the south of the project site to evaluate feasibility of alternatives. Costs of field services completed by TREKK are not included in this scope of work and are assumed to be covered under one of the City’s existing field services contracts with TREKK. Survey of the project area is assumed to be performed by City survey staff and is assumed to generally include survey of structure rim and invert elevations of the Project components. 2.2 Condition Assessment Provider will perform a condition assessment on the Missouri Ave storm sewer from South 12th Street to the Missouri River. Provider will review available as-built information, assess the “sacrificial” concrete lining on the Missouri Ave storm sewer, and determine potential recommended corrosion protection. Condition assessment shall consist of review of CCTV pipeline inspection video and reports, including review of the NASSCO PACP scores. Provider will review and interpret results of the CCTV inspection. Once the new CCTV inspection is complete, if needed, Provider’s structural engineer will visit the site and perform additional inspection of the Missouri Ave storm sewer to determine suitability for the pipe to be pressurized. Results of the field investigation and onsite condition assessment will be summarized in the Conceptual Design Report as described in Task 4. Task 3 - H&H Evaluation 3.1 Model Update Provider will use the City’s CSO Program InfoWorks ICM hydraulic model to evaluate the H&H of the Missouri Avenue storm sewer in the Project area. Provider will refine the stormwater subcatchments in the Project area for more resolution and accuracy regarding flows that drain to the Missouri Avenue storm sewer. Provider will update elevations of pipe inverts, manhole rim elevations, and inlet elevations in the model as needed from survey and as-built data. 3.2 Model Analysis 5 Provider will perform an analysis of the existing hydraulic grade line (HGL) conditions in the Missouri Avenue storm sewer to serve as a baseline for which to compare alternatives. The proposed alternatives identified in Task 4 will be evaluated with downstream boundary conditions on the Missouri River of USACE Construction Reference Plan (CRP) (typical navigation season river level), the elevation when the Missouri Avenue bulkhead gate is normally closed (29 feet at the I-480 bridge), and the 100-yr flood (34 ft at the Interstate-480 bridge) flood stage. Simulations for each alternative will be based on modeling of local design storms to the Missouri Avenue storm sewer in combination with the Missouri River downstream boundary conditions noted above. The provider will show the HGLs of the Missouri Ave stormwater system with Missouri River levels correlated to ground elevations near the Project area. City staff have indicated that at the minor flood stage, the City closes the Missouri Ave storm sewer bulkhead gate. The moderate flood stage is assumed to be 32 feet at the I-480 bridge. Results of the model update and analysis will be presented at the periodic progress meetings described in Task 1.1 Task 4 – Conceptual Design 4.1 Conceptual Design Report Provider will prepare a Conceptual Design Report that describes and summarizes the existing data used to develop the conceptual design. The conceptual design report will provide the results from the H&H alternatives analysis including figures showing the HGL at each flood stage for the identified alternatives. The condition of the Missouri Ave storm sewer will be summarized along with findings from the CCTV inspection to be performed by others under separate contract with the City. Provider will assess whether the pipe is structurally able to accommodate pressurized flow based on the condition of the RCP. Provider will identify up to four alternatives to mitigate stormwater surcharge. Feasibility and fatal flaw analyses of each alternative will be performed. Alternatives are expected to include, at least, provisions for surcharging the Missouri Avenue storm sewer and temporary by-pass pumping connections for the City to use during high river conditions. For the alternatives analysis it is assumed CSO 117 diversion to the Missouri Avenue lift station is closed and the 60- inch x 60-inch Missouri Avenue storm sewer is separated. Provider will coordinate with the City’s Construction Manager for status of completion for OPW 51997b Spring Lake Phase 2 Project including the closure of CSO 117 diversion and the repairs to the flap gate at the outfall. As part of the alternatives analysis a conceptual cost estimate will be provided for each alternative. Provider will, with the City’s input, recommend an alternative. Conceptual plans and figures for the recommended alternative will be developed and included in the conceptual design report. 6 Project Assumptions The following assumptions are included in this scope of work. •In addition to the limited additional survey described above, it is assumed that the Provider will primarily utilize the City’s www.dogis.org website to obtain one foot topographic and City utility information. •This Scope of Services does not include subcontractor agreements, developing construction documents and specifications, requests for proposal (RFP), or services during construction (SDC). •In the event there is a reasonable assessment as to the safety or health of personnel because of the COVID-19 or related virus, Provider reserves the right to revise pricing, resourcing or schedule accordingly. Additionally, in the event travel is required the pricing and schedule set out in the scope assumes there are no travel restrictions. Provider would directly coordinate with the City to mitigate and minimize any delays, costs and other impacts. Project Deliverables The following deliverables will be provided as part of this Scope of Services. •Final meeting minutes for listed coordination and progress meetings. •Draft and final versions of Conceptual Design report in PDF format. ARTICLE 2 - Schedule The estimated Project schedule is based upon a Notice to Proceed from the City of (September 30, 2020). The project will be completed within 250 calendar days after the Notice to Proceed. ARTICLE 3 - Compensation Compensation by City to Provider for the proposed services described above will be as described in attached Exhibit C. EXHIBIT “C” BREAKDOWN OF COSTS 1 Exhibit “C” COMPENSATION Missouri Avenue Storm Sewer Outfall (OPW 53943) Compensation by City of Omaha (City) to Jacobs Engineering Group Inc. (Provider for the proposed services described in Exhibit B, Scope of Services will be as follows: A. COST REIMBURSABLE-MULTIPLIER (TIME AND EXPENSE) For services enumerated in the Scope of Services above, Provider’s Salary Costs multiplied by a factor of 2.13 Salary Cost Multiplier, plus Direct Expenses, plus a service charge of 10 percent on Direct Expenses and 10 percent of subcontracts and outside services, plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. B. BUDGET The maximum cost for this Project, as defined by services described in the Scope of Services outlined in Exhibit B is Ninety-Nine Thousand, Seven Hundred and Thirty-Six Dollars and Fifty-Six Cents ($99,736.56), which will be billed on a time and materials basis. Provider may utilize the compensation between individual tasks requested by the City but shall not exceed the maximum amount of $99,736.56 unless approved in writing by the City through a contract amendment to this agreement. Provider is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is City obligated to pay Provider beyond these limits. When budget has been increased, Provider’s excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. C. DIRECT EXPENSES Direct Expenses are those necessary costs and charges incurred for the Project including, but not limited to: (1) the direct costs of transportation and equipment and supplies; (2) Provider’s current standard rate charges for direct use of Provider’s vehicles, laboratory test and analysis, and certain field equipment; and (3) Provider’s standard project charges for computing systems, and special health and safety requirements of OSHA. Compensation by City to Provider will be for professional services provided on a “time and materials” basis on hourly rates for all labor with other direct costs, such as printing, reimbursed at a rate of 1.1 times actual cost. A summary of labor hours per task and Provider’s standard hourly billing rates is included in Table C-1 below. 2 TABLE C-1 Schedule of Hourly Rates, 2020* Missouri Avenue Storm Sewer Staff Name Role Hours Hourly Rate Price Task 1 Project Mgt and Data Review Emily Holtzclaw Senior Project Manager 30 $ 259.25 $ 7,777.57 Aaron Smith Task Lead 40 $ 172.81 $ 6,912.27 Nick Sutko Project Engineer 42 $ 193.42 $ 8,123.74 Tim Petty Lead Structural Engineer 8 $ 222.15 $ 1,777.17 Alex Sutherland Structural Engineer 4 $ 126.01 $ 504.05 Carla Arsenault Administrative/Accounting 4 $ 92.70 $ 370.78 Task 1 Total Labor 128 $ 25,465.58 Task 2 Field Work Emily Holtzclaw Senior Project Manager 8 $ 259.25 $ 2,074.02 Aaron Smith Task Lead 32 $ 172.81 $ 5,529.81 Nick Sutko Project Engineer 32 $ 193.42 $ 6,189.52 John Bergin Condition Assessment Engineer 4 $ 222.23 $ 888.91 Ron Root Condition Assessment Engineer 20 $ 148.64 $ 2,972.84 Tim Petty Lead Structural Engineer 8 $ 222.15 $ 1,777.17 Alex Sutherland Structural Engineer 20 $ 126.01 $ 2,520.27 Task 2 Total Labor 124 $ 21,952.53 Task 3 H&H Evaluation Emily Holtzclaw Senior Project Manager 1 $ 259.25 $ 259.25 Robert Magallon H&H Model Team 20 $ 103.19 $ 2,063.77 Task 3 Total Labor 21 $ 2,323.02 Task 4 Conceptual Design Emily Holtzclaw Senior Project Manager 20 $ 259.25 $ 5,185.04 Dan Hegwald Quality Manager 6 $ 256.46 $ 1,538.77 Aaron Smith Task Lead 48 $ 172.81 $ 8,294.72 Robert Magallon H&H Model Team 24 $ 103.19 $ 2,476.53 Nick Sutko Project Engineer 54 $ 193.42 $ 10,444.81 John Bergin Condition Assessment Engineer 4 $ 222.23 $ 888.91 Ron Root Condition Assessment Engineer 6 $ 148.64 $ 891.85 3 Staff Name Role Hours Hourly Rate Price Tim Petty Lead Structural Engineer 6 $ 222.15 $ 1,332.87 Alex Sutherland Structural Engineer 24 $ 126.01 $ 3,024.32 Stephanie Miller Technician 56 $ 96.38 $ 5,397.26 Ed Meyer Constructability/Estimating 17 $ 273.50 $ 4,649.54 Carla Arsenault Administrative/Accounting 4 $ 92.70 $ 370.78 Task 4 Total Labor 269 $ 44,495.43 Total Labor 542 $ 94,236.56 Expenses $ 5,500.00 Total Project Cost $ 99,736.56 *Note: Hourly billing rates apply to all “Time and Materials” contracts, effective January 1, 2020. Labor rates are based on a 2.13 Salary Cost Multiplier and may deviate from the values listed in the table based on individuals actually performing the work and their actual raw labor rate at the time the services are performed. Non-Labor Rate Items Mileage Rate Current IRS audit rate at time of service Actual + 10 percent Actual + 10 percent Actual + 10 percent Actual + 10 percent Actual + 10 percent Other related consumable supplies (field equipment and supplies, etc.) Postage, freight Travel costs (airfare, hotel, care rental, meals, etc.) Subcontractors and Outside Services EXHIBIT "D" SUPPLEMENTAL PROVISIONS EXHIBIT “D” SUPPLEMENTAL PROVISIONS Missouri Avenue Storm Sewer Outfall ARTICLE 1. SCOPE OF SERVICES Provider will perform the Scope of Services set forth in Exhibit “B”. ARTICLE 2. COMPENSATION City will compensate Provider as set forth in Exhibit C. Work performed under this AGREEMENT may be performed using labor from affiliated companies of Provider. Such labor will be billed to City under the same billing terms applicable to Provider’s employees. ARTICLE 3. TERMS OF PAYMENT City will pay Provider as follows: 3.1 Invoices and Time of Payment Provider will issue monthly invoices pursuant to Exhibit “C”. Invoices are due and payable within 30 days of receipt. 3.2 Interest 3.2.1 City will be charged interest at the rate of 1- 1/2% per month, or that permitted by law if lesser, on all past-due amounts starting 30 days after receipt of invoice. Payments will first be credited to interest and then to principal. 3.2.2 In the event of a disputed billing, only the disputed portion will be withheld from payment, and City shall pay the undisputed portion. City will exercise reasonableness in disputing any bill or portion thereof. No interest will accrue on any disputed portion of the billing until mutually resolved. 3.2.3 If City fails to make payment in full within 30 days of the date due for any undisputed billing, Provider may, after giving 7 days' written notice to City, suspend services under this AGREEMENT until paid in full, including interest. In the event of suspension of services, Provider will have no liability to City for delays or damages caused by City because of such suspension. ARTICLE 4. OBLIGATIONS OF Provider 4.1 Standard of Care The standard of care applicable to Provider's Services will be the degree of skill and diligence normally employed by professional engineers or consultants performing the same or similar Services at the time said services are performed. Provider will reperform any services not meeting this standard without additional compensation. 4.2 Subsurface Investigations In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of Provider. 4.3 Provider's Personnel at Construction Site 4.3.1 The presence or duties of Provider's personnel at a construction site, whether as onsite representatives or otherwise, do not make Provider or Provider's personnel in any way responsible for those duties that belong to City and/or the construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the construction Contract Documents and any health or safety precautions required by such construction work. 4.3.2 Provider and Provider's personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions and have no duty for inspecting, noting, observing, correcting, or reporting on health or safety deficiencies of the construction contractor(s) or other entity or any other persons at the site except Provider's own personnel. 4.3.3 The presence of Provider's personnel at a construction site is for the purpose of providing to City a greater degree of confidence that the completed construction work will conform generally to the construction documents and that the integrity of the design concept as reflected in the construction documents has been implemented and preserved by the construction contractor(s). Provider neither guarantees the performance of the construction contractor(s) nor assumes responsibility for construction contractor's failure to perform work in accordance with the construction documents. For this AGREEMENT only, construction sites include places of manufacture for materials incorporated into the construction work, and construction contractors include manufacturers of materials incorporated into the construction work. 4.4 Opinions of Cost, Financial Considerations, and Schedules In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, Provider has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, Provider makes no warranty that City's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from Provider's opinions, analyses, projections, or estimates. If City wishes greater assurance as to any element of PROJECT cost, feasibility, or schedule, City will employ an independent cost estimator, contractor, or other appropriate advisor. 4.5 Construction Progress Payments Recommendations by Provider to City for periodic construction progress payments to the construction contractor(s) will be based on Provider's knowledge, information, and belief from selective sampling that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by Provider to ascertain that the construction contractor(s) have completed the work in exact accordance with the construction documents; that the final work will be acceptable in all respects; that Provider has made an examination to ascertain how or for what purpose the construction contractor(s) have used the moneys paid; that title to any of the work, materials, or equipment has passed to City free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between City and the construction contractors that affect the amount that should be paid. 4.6 Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. Provider is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. 4.7 Access to Provider's Accounting RecordsReserved Provider will maintain accounting records, in accordance with generally accepted accounting principles. These records will be available to City during Provider's normal business hours for a period of 1 year after Provider's final invoice for examination to the extent required to verify the direct costs (excluding established or standard allowances and rates) incurred hereunder. City may only audit accounting records applicable to a cost-reimbursable type compensation. 4.8 Provider's Insurance Provider will maintain throughout this AGREEMENT the following insurance: (a) Worker's compensation and employer's liability insurance as required by the state where the work is performed. (b) Comprehensive automobile and vehicle liability insurance covering claims for injuries to members of the public and/or damages to property of others arising from use of motor vehicles, including onsite and offsite operations, and owned, nonowned, or hired vehicles, with $1,000,000 combined single limits. (c) Commercial general liability insurance covering claims for injuries to members of the public or damage to property of others arising out of any covered negligent act or omission of Provider or of any of its employees, agents, or subcontractors, with $1,000,000 per occurrence and in the aggregate. (d) Professional liability insurance of $1,000,000 per occurrence and in the aggregate. (e) City will be named as an additional insured with respect to Provider's liabilities hereunder in insurance coverages identified in items (b) and (c) and Provider waives subrogation against City as to said policies. ARTICLE 5. OBLIGATIONS OF City 5.1 City-Furnished Data City will provide to Provider all data in City's possession relating to Provider's services on the PROJECT. Provider will reasonably rely upon the accuracy, timeliness, and completeness of the information provided by City. 5.2 Access to Facilities and Property City will make its facilities accessible to Provider as required for Provider's performance of its services and will provide labor and safety equipment as required by Provider for such access. City will perform, at no cost to Provider, such tests of equipment, machinery, pipelines, and other components of City's facilities as may be required in connection with Provider's services. 5.3 Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, City will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights-of-way, and access necessary for Provider's services or PROJECT construction. 5.4 Timely Review City will examine Provider's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as City deems appropriate; and render in writing decisions required by City in a timely manner. 5.5 Prompt Notice City will give prompt written notice to Provider whenever City observes or becomes aware of any development that affects the scope or timing of Provider's Services, or of any defect in the work of Provider or construction contractors. 5.6 Asbestos or Hazardous Substances 5.6.1 If asbestos or hazardous substances in any form are encountered or suspected, Provider will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. 5.6.2 If asbestos is suspected, Provider will, if requested, manage the asbestos remediation activities using a qualified subcontractor at an additional fee and contract terms to be negotiated. 5.6.3 If hazardous substances other than asbestos are suspected, Provider will, if requested, conduct tests to determine the extent of the problem and will perform the necessary studies and recommend the necessary remedial measures at an additional fee and contract terms to be negotiated. 5.6.4 Client recognizes that Provider assumes no risk and/or liability for a waste or hazardous waste site originated by other than Provider. 5.7 Contractor Indemnification and ClaimsReserved 5.7.1 City agrees to include in all construction contracts the provisions of Article 4.3, Provider's Personnel at Construction Site, and provisions providing contractor indemnification of City and Provider for contractor's negligence. 5.7.2 City shall require construction contractor(s) to name City and Provider as additional insureds on the contractor’s general liability insurance policy. 5.7.3 City agrees to include the following clause in all contracts with construction contractors, and equipment or materials suppliers: “Contractors, subcontractors, and equipment and material suppliers on the PROJECT, or their sureties, shall maintain no direct action against Provider, Provider's officers, employees, affiliated corporations, and subcontractors for any claim arising out of, in connection with, or resulting from the engineering services performed. City will be the only beneficiary of any undertaking by Provider." 5.8 City's InsuranceReserved 5.8.1 City will maintain property insurance on all pre- existing physical facilities associated in any way with the PROJECT. 5.8.2 City will provide for a waiver of subrogation as to all City-carried property damage insurance, during construction and thereafter, in favor of Provider, Provider's officers, employees, affiliates, and subcontractors. 5.8.3 City will provide (or have the construction contractor(s) provide) a Builders Risk All Risk insurance policy for the full replacement value of all PROJECT work including the value of all onsite City-furnished equipment and/or materials associated with Provider's services. Such policy will include coverage for loss due to defects in materials and workmanship and errors in design, and will provide a waiver of subrogation as to Provider and the construction contractor(s) (or City), and their respective officers, employees, agents, affiliates, and subcontractors. City will provide Provider a copy of such policy. 5.9 Litigation Assistance The Scope of Services does not include costs of Provider for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by City. All such Services required or requested of Provider by City, except for suits or claims between the parties to this AGREEMENT, will be reimbursed as mutually agreed. 5.10 Changes City may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect Provider's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT. ARTICLE 6. GENERAL LEGAL PROVISIONS 6.1 Authorization to Proceed Execution of this AGREEMENT by City will be authorization for Provider to proceed with the work, unless otherwise provided for in this AGREEMENT. 6.2 Reuse of PROJECT Documents All reports, drawings, specifications, documents, and other deliverables of Provider, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. City agrees to indemnify Provider and Provider's officers, employees, subcontractors, and affiliated corporations from all claims, damages, losses, and costs, including, but not limited to, litigation expenses and attorney's fees arising out of or related to the unauthorized reuse, change or alteration of these PROJECT documents. 6.3 Force Majeure Provider is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of Provider. In any such event, Provider’s contract price and schedule shall be equitably adjusted. 6.4 Limitation of Liability 6.4.1 To the maximum extent permitted by law, Provider's liability for City's damages will not, in the aggregate, exceed $100,000. 6.4.2 This article takes precedence over any conflicting article of this AGREEMENT or any document incorporated into it or referenced by it. 6.4.36.4.2 This limitation of liability will apply whether Provider’s liability arises under breach of contract or warranty; tort; including negligence; strict liability; statutory liability; or any other cause of action, and shall include Provider’s officers, affiliated corporations, employees, and subcontractors. 6.5 Termination 6.5.1 This AGREEMENT may be terminated for convenience on 30 days' written notice, or for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance within 5 days of written notice and diligently complete the correction thereafter. 6.5.2 On termination, Provider will be paid for all authorized services performed up to the termination date plus termination expenses, such as, but not limited to, reassignment of personnel, subcontract termination costs, and related closeout costs. 6.6 Suspension, Delay, or Interruption of Work City may suspend, delay, or interrupt the Services of Provider for the convenience of City. In such event, Provider's contract price and schedule shall be equitably adjusted. 6.7 No Third-Party Beneficiaries This AGREEMENT gives no rights or benefits to anyone other than City and Provider and has no third- party beneficiaries. 6.8 IndemnificationReserved 6.8.1 Provider agrees to indemnify City for any claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation costs, arising out of claims by third parties for property damage or bodily injury, including death, to the proportionate extent caused by the negligence or willful misconduct of Provider, Provider's employees, affiliated corporations, and subcontractors in connection with the PROJECT. 6.8.2 City agrees to indemnify Provider from any claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation costs, arising out of claims by third parties for property damage or bodily injury, including death, to the proportionate extent caused by the negligence or willful misconduct of City, or its employees or contractors in connection with the PROJECT. 6.9 Assignment This is a bilateral personal Services AGREEMENT. Neither party shall have the power to or will assign any of the duties or rights or any claim arising out of or related to this AGREEMENT, whether arising in tort, contract or otherwise, without the written consent of the other party. Any unauthorized assignment is void and unenforceable. The parties further agree that Provider may novate this AGREEMENT to an affiliate in the case of normal corporate restructuring, provided any such novation does not adversely affect its ability to perform this AGREEMENT. These conditions and the entire AGREEMENT are binding on the heirs, successors, and assigns of the parties hereto. 6.10 Consequential DamagesReserved To the maximum extent permitted by law, Provider and Provider's affiliated corporations, officers, employees, and any of their subcontractors, shall not be liable to forthe other City’s for any special, indirect, or consequential damages, whether such damages arise out of breach of contract or warranty, tort including negligence, strict or statutory liability, or any other cause of action. In order to protect Provider against indirect liability or third-party proceedings, City will indemnify Provider for any such damages. 6.11 WaiverReserved City waives all claims against Provider, including those for latent defects, that are not brought within 2 years of substantial completion of the facility designed or final payment to Provider, whichever is earlier. 6.12 Jurisdiction The substantive law of the state of the PROJECT site shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. 6.13 Severability and Survival 6.13.1 If any of the Provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable, the enforceability of the remaining provisions shall not be impaired thereby. 6.13.2 Limitations of liability, indemnities, and other express representations shall survive termination of this AGREEMENT for any cause. 6.14 Materials and Samples Any items, substances, materials, or samples removed from the PROJECT site for testing, analysis, or other evaluation will be returned to the PROJECT site within 60 days of PROJECT close-out unless agreed to otherwise. City recognizes and agrees that Provider is acting as a bailee and at no time assumes title to said items, substances, materials, or samples. 6.15 Engineer’s Deliverables Engineer’s deliverables, including record drawings, are limited to the sealed and signed hard copies. Computer- generated drawing files furnished by Provider are for City or others' convenience. Any conclusions or information derived or obtained from these files will be at user's sole risk. 6.16 Dispute Resolution The parties will use their best efforts to resolve amicably any dispute, including use of alternative dispute resolution options. 6.17 Ownership of Work Product and InventionsReserved All of the work product of the Provider in executing this PROJECT shall remain the property of Provider. City shall receive a perpetual, royalty- free, non- transferable, non-exclusive license to use the deliverables for the purpose for which they were intended. Any inventions, patents, copyrights, computer software, or other intellectual property developed during the course of, or as a result of, the PROJECT shall remain the property of the Provider. 6.18 Intellectual Property City acknowledges and agrees that in the performance of the development service, Provider may utilize its proprietary data, concepts, methods, techniques, processes, protocols, ideas, inventions, know-how, trade secrets, algorithm, software, works of authorship, software and hardware architecture, databases, tools, other background technologies and standards of judgment that Provider developed or licensed from third parties prior to the Effective Date (the “Pre-Existing Technology”). Subject to the terms and conditions of this AGREEMENT, Provider hereby grants to City a non-exclusive, non-transferable, royalty-free license under Provider’s Intellectual Property Rights to utilize the Pre-Existing Technology for the purpose of the City Project. City shall not, and shall not allow any third party to: (i) modify or otherwise create derivative works of the Pre-Existing Technology; (ii) use the Pre- Existing Technology for any other purpose, other than the City Project; (iii) make, have made, use, reproduce, license, display, perform, distribute, sell, offer for sale, service, support, or import any product that incorporates, embodies and/or is based upon the Pre-Existing Technology; (iv) sublicense, distribute or otherwise transfer to a third party any of the Pre-Existing Technology by itself or as incorporated into software or hardware; or (v) reverse engineer, disassemble, decompile or attempt to derive the source code or underlying ideas or algorithms of the Pre-Existing Technology. Any additional use of the Pre-Existing Technology shall require a separate written license agreement.