RES 2012-1471 - Contract with Neuvirth Construction Inc for OPW 52305, Burt-Izard pumping station junction box repair y 7� RECEIVED
40
Public Works Department
Omaha/Douglas Civic Center
{fir
12 Q C T 26 1111'It: Q G 1819 Farnam Street,Suite 601
November 6
, _s y _ � 2012 Omaha,Nebraska 68183-0601
5; '^ Po • 4ro (402)444-5220
41WD FESt°' CITY CLERK Fax(402)444-5248
City of Omaha 0 M A H A. N E B R A S K A Robert G.Stubbe,P.E.
Jim Suttle,Mayor Public Works Director
Honorable President
and Members of the City Council,
The attached Resolution approves the contract with Neuvirth Construction, Inc. for OPW 52305,
being Burt-Izard Pumping Station Junction Box Repair.
The following bids were received on October 17, 2012. A detailed bid tabulation is attached.
Contractor Total Bid
NEUVIRTH CONSTRUCTION, INC. $187,254.06 (LOW BID)
L. G. Roloff Construction Co., Inc. $247,224.88
Judds Brothers Construction Co. $274,668.00
The contractor has a current Contract Compliance Report Form (CC-1) on file. As is City
policy, the Human Rights and Relations Department will review the contractor to ensure
compliance with the Contract Compliance Ordinance.
The Finance Department is authorized to pay the cost of OPW 52305 from the FEMA Fund
12122, Operation Grants—Other Public Services Organization 132038, year 2012 expenditures.
The Public Works Department recommends the acceptance of the bid from Neuvirth
Construction, Inc. in the amount of $187,254.06, being the lowest and best bid received, and
requests your consideration and approval of this Resolution.
Respectfully submitted, Referred to City Council for Consideration:
jo -i9-, z. /s. 2 ? •C /Z
Ro ert G. Stubbe, P.E. Date Mayor's Of ice Date
Public Works Director
Approved as to Funding: App . -a.
•
Pam Spaccarotella Date Human ' igh s and Relations Date
Finance Director Department
200112scp
TAB Construction Company $2.40 per SY $960.00
K-2 Construction $1.55 per SY $620.00
Prudent Technologies $4.25 per SY $1,700.00
13 590.000 PERFORM TELEVISION INSPECTION
Engineeer's Estimate 156 @ $3.00 per LF $468.00
Judds Bros Construction Co $4.00 per LF $624.00
Heimes Corp. $6.80 per LF $1,060.80
TAB Construction Company $3.00 per LF $468.00
K-2 Construction $2.30 per LF $358.80
Prudent Technologies $7.25 per LF $1,131.00
14 111.001 REMOVE AND REPLACE FENCE
Engineeer's Estimate 50 @ $20.00 per LF $1,000.00
Judds Bros Construction Co $12.00 per LF $600.00
Heimes Corp. $61.00 per LF $3,050.00
TAB Construction Company $42.00 per LF $2,100.00
K-2 Construction $50.00 per LF $2,500.00
Prudent Technologies $67.50 per LF $3,375.00
Page 5 of 6, 9/27/2012 10:09:44 AM, Bid Tabulation, Generated by:guygerhard for project OPW 52295
CO
F a • ar U S. oo U ►, 8s,
con> w VI C 3 5: O " ' 'c COa a c 2 a p w 0p c o? do oo 06 ° .° 0 C c o n c -0 0I
O iA O C la. CIO
O C C LI < CZ
7 CO ...I) 5 o cc .. N =o CO o al .. COa O p. Q O
F �, d a; QU dQ SQd Z ZdU ;; i
w .Zct
cn
mended contribution rate. An asset valuation method is used to smooth the
1
LOTS 1 AND 2
.__ EXHIBIT "D" _.. ...............
90,tausf969t969MVWM69016961M69696969 MO16969699M �° � d d
,^ C NNNNNNNNNNNNNNNNNNNNNNNNNNIN < Hr
NNNNNNNNNNNNNNNNNNNNNNNNNNN
C C d E
W • • • I nhnrrnnrnrnt`rnNINNI `nrNnr nrti n 0 u v .
a C
jd d i ..... .r r r r r.--r.--r r r r r r r I V' J° W C, C
W 0 C
N'- a 101.N C .
•"1 69 69 V9 Vi 69 69 69 69(a(a 69 E9 f9 69 69 E9 6 69 69 69 f9 M M fa 69 69 M 69 E9 69 8(.32 c
0)O)0) O) 0) O) O)0)O) 0) O) O) O) O) O) O)0)0) 0) O)O)O)O) 0) 0) 0) I V'
v v a v v v v v v v v v v v v v v v v v v v v v v v t n
W • ' ' • N N N N N N N N N N N N N N N N N N N N N N N N N N CY
x C ( ' N N N N N N N N N N N N N N N(N N NN N N N N N N N 106 '
N0 W n n n n n n n N n n N n n n n n n n n N n n N n n N n�
0 01
m N
69 69 69 V96969 69E9400 6969 69 N 69 69 69 69 69 69 69 69 69 69 V,6969696969 69
n n n n n n n n n nn n n n nn n n n n n n n n n n n n n n •
Co O)O) 0)Ol O)O)O)O)O)Ol Ol O)O)o Ol 01 Ol 00 O)O)Ol O)O)O1 0)Ol O)O)o
vttY avvtCYav ,IMLLY,1-0 r<r ,1ThCYCYt
Co 0o ao 0o 0o Co Co 0o m m m Co m Co m oo m ao eo 0o Co m m Co m oo m oo m oo
00 I N N N N N N.N N N N N N N N N N N N N N N N N N N N N N N N
12 J I N N N N N N N N N N N N N N N N N N N N N N N N N N N tW N N m
... E
mP,
y
D NnlD Nn .
d0)N d3
t0 OmO i0t0mt0 o _cm
.w yyF- O
W C ' lNDlnONnnNNNnNnnNNnNNNnN
0OMtOMMt0000M000OMMW 024 ,40
LL mml NNNNNNNNNNNNNNNNNNNNNNNNNN CCdV
p x 7 I O o O O O O o O O o O o O O O O O O O O O o O o o O N 0, ( d
• F; 11 ul U1 U1 vi ui to to ul ul U1 u1 U,ul uj u1 N u7 u1 ui ul U1 u1 ui vi to t. 10 i0 y d•O
o C C C .-I o o Co o Co.t.-I c-1 C Co o o .-i -I o o C .-I-C.-1 o Ct
• N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N C O;C 0 '
000000000000000000000000000000 E~ > E
C IA—A O W d
d II y.� 0 >
d 0.0 � I (0 d,p y 0
oa I Of" Edda
J >• m I d y .y
O I d i y• C d
° Eo `°w12
to to to to to to to t0 to to to to to to to tc to to to to to to'to to to to 2 E c
N N N N N N N N N N N N N N N N N N N N N N N N N N Ox A Y a
"'
W C ' ' ' ' t0 t0 t0 M O M t0 t0 t0 t0 t0 m m O t0 t0 tO t0 O t0 t0 m tO t0 W M CID'. to 0
tD tD t0 t0 tO t0 UI U7 t0 t0 t0 t0 t0 lD t0 t0 O tD tD 60 tD tO tD t0 to t0 I .A C
y O x c0 00000000000000000000000000 0 O
N- m— Ui Ui tri Ui Ui vi 69 vi U,vi ui vi ui vi vi ui tri vi ui C.vi ui vi vi vi vi 000 Ia▪ A
H> N Co .-I...i e-1 Co C o Co.-I .-I Co o Co Co C Co o.i C Co.i .i C Co A O O > (9 r
LLN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N o w g10, d C C
0 to N vl N ul M Ul Ct U)to u)t0 U)N M CO U Ol to o ul H U)N ul M N V O ul C d y a E d o .-1 N M IA V tlJ n Di Oi~O .i,4 Co Co•1"'t N ''"I.a-•1'"t 'y Q,m d
W M
W .0 I • t d c j0 LL
0.
`t= d
Q Z y MO •
(0 A . .
Bid Tabulation
Public Works Department
Omaha, Nebraska
Wednesday, October 17, 2012
Project Summary
OPW 52305 English Yes
Metric: No
Description: Burt-Izard Pumping Station-Junction Box Repair
Start Date: Completion Date:
Labor Release Date:
Field Book Number: Test Core Lengths:
Council Resolution: Adoption Date:
Percent Reserve Due: 10.0%
Percent Complete: 0.0% Percent Time Used: 0.0%
Engineer's Total: $245,347.00
Contract Total $0.00
Total Penalties: $0.00
Total Payments: $0.00
Contractor:
Phone#:
Fax#:
Email address:
Page 1 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by:guygerhard for project OPW 52305
ect OPW 52295
ons.
P1n2914ece
o si �El l •eti TO
gg I!ilt
=:7
•
Account/Funding Summary
Fund Org. Description Engineer Contract Penalties Payments
12122 132038 FEMA Fund-Operating Grants&Other $245,347.00 $0.00 $0.00 $0.00
Public Services
$245,347.00 $0.00 $0.00 $0.00
Page 2 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by:guygerhard for project OPW 52305
Adoption Date:
Percent Reserve Due: 10.0%
Percent Complete: 0.0% Percent Time Used: 0.0%
Engineer's Total: $245,347.00
Contract Total $0.00
Total Penalties: $0.00
Total Payments: $0.00
Contractor:
Phone#:
Fax#:
Email address:
Page 1 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by:guygerhard for project OPW 52305
ect OPW 52295
ons.
P1n2914ece
o si �El l •eti TO
gg I!ilt
=:7
Bid Summary(low to high bidder)
Contractor
Engineer's Estimate: $245,347.00
Diff From Low: $58,092.94
Neuvirth's Construction,Inc. Bid: $187,254.06
4917 Grand Avenue Diff From Low: $0.00
Omaha NE 68104-
L.G.Roloff Construction Company,Inc. Bid: $247,224.88
10204 South 152nd Street Diff From Low: $59,970.82
Omaha NE 68138-3866
Judds Bros Construction Co Bid: $274,668.00
3835 N.68th St.,PO Box 5344 Diff From Low: $87,413.94
Lincoln NE 68505-
Number of Bids: 3
• Low Bid: $187,254.06
High Bid: $274,668.00
Average Bid:: $236,382.31
•
Page 3 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by:guygerhard for project OPW 52305
Type Line# Item# Description Quantity Price Total
1 900.001 MOBILIZATION/DEMOBILIZATION, BONDS,PERMITS AND INSURANCE
Engineeer's Estimate 1 @ $32,000.00 per LS $32,000.00
Neuvirth's Construction, Inc. $8,500.00 per LS $8,500.00
L. G. Roloff Construction Company, Inc. $20,000.00 per LS $20,000.00
Judds Bros Construction Co $27,500.00 per LS $27,500.00
2 900.002 ALL REMAINING JUNCTION BOX REPAIRS DESIGNATED IN THE BIDDING DOCUMENTS
Engineeer's Estimate 1 @ $71,000.00 per LS $71,000.00
Neuvirth's Construction, Inc. $100,500.00 per LS $100,500.00
L. G. Roloff Construction Company, Inc. $145,000.00 per LS $145,000.00
Judds Bros Construction Co $125,000.00 per LS $125,000.00
3 900.003 FINE GRADING
Engineeer's Estimate 6387 @ $3.00 per SY $19,161.00
Neuvirth's Construction, Inc. $1.50 per SY $9,580.50
L.G. Roloff Construction Company, Inc. $0.45 per SY $2,874.15
Judds Bros Construction Co $1.00 per SY $6,387.00
4 900.004 SOIL AMENDMENT
Engineeer's Estimate 2332 @ $15.00 per SY $34,980.00
Neuvirth's Construction, Inc. $6.00 per SY $13,992.00
L.G. Roloff Construction Company, Inc. $2.26 per SY $5,270.32
Judds Bros Construction Co $13.25 per SY $30,899.00
5 900.005 WOOD CHIP MULCH
Engineeer's Estimate 170 @ $50.00 per CY $8,500.00
Neuvirth's Construction, Inc. $27.00 per CY $4,590.00
L.G. Roloff Construction Company, Inc. $37.22 per CY $6,327.40
Judds Bros Construction Co $60.00 per CY $10,200.00
6 900.006 STONE PATHS
Engineeer's Estimate 155 @ $35.00 per SF $5,425.00
Neuvirth's Construction, Inc. $10.10 per SF $1,565.50
L.G. Roloff Construction Company, Inc. $20.30 per SF $3,146.50
Judds Bros Construction Co $18.00 per SF $2,790.00
7 900.007 IRRIGATION INSPECTION
Engineeer's Estimate 1 @ $12,000.00 per LS $12,000.00
Neuvirth's Construction, Inc. $2,000.00 per LS $2,000.00
L.G. Roloff Construction Company, Inc. $169.17 per LS $169.17
Judds Bros Construction Co $2,200.00 per LS $2,200.00
8 900.008 IRRIGATION SPRAY HEADS
Engineeer's Estimate 80 @ $20.00 EACH $1,600.00
Neuvirth's Construction, Inc. $55.00 EACH $4,400.00
L.G.Roloff Construction Company, Inc. $39.47 EACH $3,157.60
Judds Bros Construction Co $70.00 EACH $5,600.00
9 900.009 IRRIGATION QUICK COUPLER VALVE
Engineeer's Estimate 3 @ $175.00 EACH $525.00
Neuvirth's Construction, Inc. $212.00 EACH $636.00
L.G. Roloff Construction Company, Inc. $163.53 EACH $490.59
Judds Bros Construction Co $150.00 EACH $450.00
Page 4 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by:guygerhard for project OPW 52305
nerated by:guygerhard for project OPW 52295
CO
F a • ar U S. oo U ►, 8s,
con> w VI C 3 5: O " ' 'c COa a c 2 a p w 0p c o? do oo 06 ° .° 0 C c o n c -0 0I
O iA O C la. CIO
O C C LI < CZ
7 CO ...I) 5 o cc .. N =o CO o al .. COa O p. Q O
F �, d a; QU dQ SQd Z ZdU ;; i
w .Zct
cn
mended contribution rate. An asset valuation method is used to smooth the
1
LOTS 1 AND 2
.__ EXHIBIT "D" _.. ...............
90,tausf969t969MVWM69016961M69696969 MO16969699M �° � d d
,^ C NNNNNNNNNNNNNNNNNNNNNNNNNNIN < Hr
NNNNNNNNNNNNNNNNNNNNNNNNNNN
C C d E
W • • • I nhnrrnnrnrnt`rnNINNI `nrNnr nrti n 0 u v .
a C
jd d i ..... .r r r r r.--r.--r r r r r r r I V' J° W C, C
W 0 C
N'- a 101.N C .
•"1 69 69 V9 Vi 69 69 69 69(a(a 69 E9 f9 69 69 E9 6 69 69 69 f9 M M fa 69 69 M 69 E9 69 8(.32 c
0)O)0) O) 0) O) O)0)O) 0) O) O) O) O) O) O)0)0) 0) O)O)O)O) 0) 0) 0) I V'
v v a v v v v v v v v v v v v v v v v v v v v v v v t n
W • ' ' • N N N N N N N N N N N N N N N N N N N N N N N N N N CY
x C ( ' N N N N N N N N N N N N N N N(N N NN N N N N N N N 106 '
N0 W n n n n n n n N n n N n n n n n n n n N n n N n n N n�
0 01
m N
69 69 69 V96969 69E9400 6969 69 N 69 69 69 69 69 69 69 69 69 69 V,6969696969 69
n n n n n n n n n nn n n n nn n n n n n n n n n n n n n n •
Co O)O) 0)Ol O)O)O)O)O)Ol Ol O)O)o Ol 01 Ol 00 O)O)Ol O)O)O1 0)Ol O)O)o
vttY avvtCYav ,IMLLY,1-0 r<r ,1ThCYCYt
Co 0o ao 0o 0o Co Co 0o m m m Co m Co m oo m ao eo 0o Co m m Co m oo m oo m oo
00 I N N N N N N.N N N N N N N N N N N N N N N N N N N N N N N N
12 J I N N N N N N N N N N N N N N N N N N N N N N N N N N N tW N N m
... E
mP,
y
D NnlD Nn .
d0)N d3
t0 OmO i0t0mt0 o _cm
.w yyF- O
W C ' lNDlnONnnNNNnNnnNNnNNNnN
0OMtOMMt0000M000OMMW 024 ,40
LL mml NNNNNNNNNNNNNNNNNNNNNNNNNN CCdV
p x 7 I O o O O O O o O O o O o O O O O O O O O O o O o o O N 0, ( d
• F; 11 ul U1 U1 vi ui to to ul ul U1 u1 U,ul uj u1 N u7 u1 ui ul U1 u1 ui vi to t. 10 i0 y d•O
o C C C .-I o o Co o Co.t.-I c-1 C Co o o .-i -I o o C .-I-C.-1 o Ct
• N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N C O;C 0 '
000000000000000000000000000000 E~ > E
C IA—A O W d
d II y.� 0 >
d 0.0 � I (0 d,p y 0
oa I Of" Edda
J >• m I d y .y
O I d i y• C d
° Eo `°w12
to to to to to to to t0 to to to to to to to tc to to to to to to'to to to to 2 E c
N N N N N N N N N N N N N N N N N N N N N N N N N N Ox A Y a
"'
W C ' ' ' ' t0 t0 t0 M O M t0 t0 t0 t0 t0 m m O t0 t0 tO t0 O t0 t0 m tO t0 W M CID'. to 0
tD tD t0 t0 tO t0 UI U7 t0 t0 t0 t0 t0 lD t0 t0 O tD tD 60 tD tO tD t0 to t0 I .A C
y O x c0 00000000000000000000000000 0 O
N- m— Ui Ui tri Ui Ui vi 69 vi U,vi ui vi ui vi vi ui tri vi ui C.vi ui vi vi vi vi 000 Ia▪ A
H> N Co .-I...i e-1 Co C o Co.-I .-I Co o Co Co C Co o.i C Co.i .i C Co A O O > (9 r
LLN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N o w g10, d C C
0 to N vl N ul M Ul Ct U)to u)t0 U)N M CO U Ol to o ul H U)N ul M N V O ul C d y a E d o .-1 N M IA V tlJ n Di Oi~O .i,4 Co Co•1"'t N ''"I.a-•1'"t 'y Q,m d
W M
W .0 I • t d c j0 LL
0.
`t= d
Q Z y MO •
(0 A . .
Type Line# Item# Description Quantity Price Total
10 900.010 IRRIGATION VALVES
Engineeer's Estimate 10 @ $100.00 EACH $1,000.00
Neuvirth's Construction, Inc. $205.00 EACH $2,050.00
L.G.Roloff Construction Company, Inc. $101.50 EACH $1,015.00
Judds Bros Construction Co $205.00 EACH $2,050.00
11 900.011 IRRIGATION PIPE<=1"DIAMETER
Engineeer's Estimate 100 a@ $20.00 per LF $2,000.00
Neuvirth's Construction, Inc. $6.30 per LF $630.00
L.G. Roloff Construction Company, Inc. $0.96 per LF $96.00
Judds Bros Construction Co $6.00 per LF $600.00
12 900.012 IRRIGATION PIPE>1"DIAMETER
Engineeer's Estimate 100 @ $27.00 per LF $2,700.00
Neuvirth's Construction, Inc. $8.25 per LF $825.00
L.G. Roloff Construction Company, Inc. $2.71 per LF $271.00
Judds Bros Construction Co $8.00 per LF $800.00
13 605.000 SODDING
Engineeer's Estimate 978 @ $3.00 per SY $2,934.00
Neuvirth's Construction, Inc. $5.40 per SY $5,281.20
L.G. Roloff Construction Company, Inc. • $4.06 per SY $3,970.68
Judds Bros Construction Co $5.00 per SY $4,890.00
14 900.014 SEEDING
Engineeer's Estimate 3076 @ $1.25 per SY $3,845.00
Neuvirth's Construction, Inc. $1.11 per SY $3,414.36 '
L.G. Roloff Construction Company, Inc. $1.58 per SY $4,860.08
Judds Bros Construction Co $1.25 per SY $3,845.00
15 900.015 BUFFALOGRASS SPRIGGING
Engineeer's Estimate 568 @ $14.00 per SY $7,952.00
Neuvirth's Construction, Inc. $6.00 per SY $3,408.00 •
L.G. Roloff Construction Company, Inc. $17.88 per SY $10,155.84
Judds Bros Construction Co $18.00 per $10,224.00
16 900.016 TREES,2-2.5"CALIPER
Engineeer's Estimate 10 @ $350.00 EACH $3,500.00
Neuvirth's Construction, Inc. $246.00 EACH $2,460.00
L.G. Roloff Construction Company,Inc. $439.83 EACH $4,398.30
Judds Bros Construction Co $320.00 EACH $3,200.00
17 900.017 TREES, 1.5-2"CALIPER
Engineeer's Estimate 7 @ $200.00 EACH $1,400.00
Neuvirth's Construction, Inc. $246.00 EACH $1,722.00
L.G. Roloff Construction Company, Inc. $310.14 EACH $2,170.98
Judds Bros Construction Co $280.00 EACH $1,960.00
18 900.018 SHRUBS, 18-24"HEIGHT
Engineeer's Estimate 59 @ $50.00 EACH $2,950.00
Neuvirth's Construction, Inc. $27.00 EACH • $1,593.00
L.G. Roloff Construction Company, Inc. $45.11 EACH $2,661.49
Judds Bros Construction Co $40.00 EACH $2,360.00
19 900.019 SHRUBS, 12-15"HEIGHT
Engineeer's Estimate 144 @ $30.00 EACH $4,320.00
Neuvirth's Construction, Inc. $30.00 EACH $4,320.00
L.G.Roloff Construction Company, Inc. $49.62 EACH $7,145.28
Judds Bros Construction Co $42.00 EACH $6,048.00
Page 5 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by:guygerhard for project OPW 52305
06 ° .° 0 C c o n c -0 0I
O iA O C la. CIO
O C C LI < CZ
7 CO ...I) 5 o cc .. N =o CO o al .. COa O p. Q O
F �, d a; QU dQ SQd Z ZdU ;; i
w .Zct
cn
mended contribution rate. An asset valuation method is used to smooth the
1
LOTS 1 AND 2
.__ EXHIBIT "D" _.. ...............
90,tausf969t969MVWM69016961M69696969 MO16969699M �° � d d
,^ C NNNNNNNNNNNNNNNNNNNNNNNNNNIN < Hr
NNNNNNNNNNNNNNNNNNNNNNNNNNN
C C d E
W • • • I nhnrrnnrnrnt`rnNINNI `nrNnr nrti n 0 u v .
a C
jd d i ..... .r r r r r.--r.--r r r r r r r I V' J° W C, C
W 0 C
N'- a 101.N C .
•"1 69 69 V9 Vi 69 69 69 69(a(a 69 E9 f9 69 69 E9 6 69 69 69 f9 M M fa 69 69 M 69 E9 69 8(.32 c
0)O)0) O) 0) O) O)0)O) 0) O) O) O) O) O) O)0)0) 0) O)O)O)O) 0) 0) 0) I V'
v v a v v v v v v v v v v v v v v v v v v v v v v v t n
W • ' ' • N N N N N N N N N N N N N N N N N N N N N N N N N N CY
x C ( ' N N N N N N N N N N N N N N N(N N NN N N N N N N N 106 '
N0 W n n n n n n n N n n N n n n n n n n n N n n N n n N n�
0 01
m N
69 69 69 V96969 69E9400 6969 69 N 69 69 69 69 69 69 69 69 69 69 V,6969696969 69
n n n n n n n n n nn n n n nn n n n n n n n n n n n n n n •
Co O)O) 0)Ol O)O)O)O)O)Ol Ol O)O)o Ol 01 Ol 00 O)O)Ol O)O)O1 0)Ol O)O)o
vttY avvtCYav ,IMLLY,1-0 r<r ,1ThCYCYt
Co 0o ao 0o 0o Co Co 0o m m m Co m Co m oo m ao eo 0o Co m m Co m oo m oo m oo
00 I N N N N N N.N N N N N N N N N N N N N N N N N N N N N N N N
12 J I N N N N N N N N N N N N N N N N N N N N N N N N N N N tW N N m
... E
mP,
y
D NnlD Nn .
d0)N d3
t0 OmO i0t0mt0 o _cm
.w yyF- O
W C ' lNDlnONnnNNNnNnnNNnNNNnN
0OMtOMMt0000M000OMMW 024 ,40
LL mml NNNNNNNNNNNNNNNNNNNNNNNNNN CCdV
p x 7 I O o O O O O o O O o O o O O O O O O O O O o O o o O N 0, ( d
• F; 11 ul U1 U1 vi ui to to ul ul U1 u1 U,ul uj u1 N u7 u1 ui ul U1 u1 ui vi to t. 10 i0 y d•O
o C C C .-I o o Co o Co.t.-I c-1 C Co o o .-i -I o o C .-I-C.-1 o Ct
• N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N C O;C 0 '
000000000000000000000000000000 E~ > E
C IA—A O W d
d II y.� 0 >
d 0.0 � I (0 d,p y 0
oa I Of" Edda
J >• m I d y .y
O I d i y• C d
° Eo `°w12
to to to to to to to t0 to to to to to to to tc to to to to to to'to to to to 2 E c
N N N N N N N N N N N N N N N N N N N N N N N N N N Ox A Y a
"'
W C ' ' ' ' t0 t0 t0 M O M t0 t0 t0 t0 t0 m m O t0 t0 tO t0 O t0 t0 m tO t0 W M CID'. to 0
tD tD t0 t0 tO t0 UI U7 t0 t0 t0 t0 t0 lD t0 t0 O tD tD 60 tD tO tD t0 to t0 I .A C
y O x c0 00000000000000000000000000 0 O
N- m— Ui Ui tri Ui Ui vi 69 vi U,vi ui vi ui vi vi ui tri vi ui C.vi ui vi vi vi vi 000 Ia▪ A
H> N Co .-I...i e-1 Co C o Co.-I .-I Co o Co Co C Co o.i C Co.i .i C Co A O O > (9 r
LLN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N o w g10, d C C
0 to N vl N ul M Ul Ct U)to u)t0 U)N M CO U Ol to o ul H U)N ul M N V O ul C d y a E d o .-1 N M IA V tlJ n Di Oi~O .i,4 Co Co•1"'t N ''"I.a-•1'"t 'y Q,m d
W M
W .0 I • t d c j0 LL
0.
`t= d
Q Z y MO •
(0 A . .
Type Line# Item# Description Quantity Price Total
20 900.020 PERENNIALS,2 GAL.
Engineeer's Estimate 70 @ $25.00 EACH $1,750.00
Neuvirth's Construction, Inc. $13.00 EACH $910.00
L.G. Roloff Construction Company, Inc. $24.81 EACH $1,736.70
Judds Bros Construction Co $30.00 EACH $2,100.00
21 900.021 PERENNIALS, 1 GAL.
Engineeer's Estimate 457 @ $15.00 EACH $6,855.00
Neuvirth's Construction, Inc. $7.00 EACH $3,199.00
L.G. Roloff Construction Company,Inc. $10.15 EACH $4,638.55
Judds Bros Construction Co $20.00 EACH $9,140.00
22 900.022 PERENNIALS, 1 QT.
Engineeer's Estimate 95 @ $10.00 EACH $950.00
Neuvirth's Construction, Inc. $4.50 EACH $427.50
L.G. Roloff Construction Company,Inc. $10.15 EACH $964.25
Judds Bros Construction Co $15.00 EACH $1,425.00
23 900.023 CURB REPAIR
Engineeer's Estimate 250 @ $72.00 per LF $18,000.00
Neuvirth's Construction, Inc. $45.00 per LF $11,250.00
L.G. Roloff Construction Company, Inc. $66.82 per LF $16,705.00
Judds Bros Construction Co $60.00 per LF $15,000.00
(LINES 1 Through 23 INCLUSIVE)
Bid Tabulation, generated • gu gerhar on 10/17/2012 12:00:26 PM for project OPW 52305
CERTIFIED BY: �� ��G L% DATE: In 7�/z
•
•
Page 6 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by: guygerhard for project OPW 52305
$1.25 per SY $3,845.00
15 900.015 BUFFALOGRASS SPRIGGING
Engineeer's Estimate 568 @ $14.00 per SY $7,952.00
Neuvirth's Construction, Inc. $6.00 per SY $3,408.00 •
L.G. Roloff Construction Company, Inc. $17.88 per SY $10,155.84
Judds Bros Construction Co $18.00 per $10,224.00
16 900.016 TREES,2-2.5"CALIPER
Engineeer's Estimate 10 @ $350.00 EACH $3,500.00
Neuvirth's Construction, Inc. $246.00 EACH $2,460.00
L.G. Roloff Construction Company,Inc. $439.83 EACH $4,398.30
Judds Bros Construction Co $320.00 EACH $3,200.00
17 900.017 TREES, 1.5-2"CALIPER
Engineeer's Estimate 7 @ $200.00 EACH $1,400.00
Neuvirth's Construction, Inc. $246.00 EACH $1,722.00
L.G. Roloff Construction Company, Inc. $310.14 EACH $2,170.98
Judds Bros Construction Co $280.00 EACH $1,960.00
18 900.018 SHRUBS, 18-24"HEIGHT
Engineeer's Estimate 59 @ $50.00 EACH $2,950.00
Neuvirth's Construction, Inc. $27.00 EACH • $1,593.00
L.G. Roloff Construction Company, Inc. $45.11 EACH $2,661.49
Judds Bros Construction Co $40.00 EACH $2,360.00
19 900.019 SHRUBS, 12-15"HEIGHT
Engineeer's Estimate 144 @ $30.00 EACH $4,320.00
Neuvirth's Construction, Inc. $30.00 EACH $4,320.00
L.G.Roloff Construction Company, Inc. $49.62 EACH $7,145.28
Judds Bros Construction Co $42.00 EACH $6,048.00
Page 5 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by:guygerhard for project OPW 52305
06 ° .° 0 C c o n c -0 0I
O iA O C la. CIO
O C C LI < CZ
7 CO ...I) 5 o cc .. N =o CO o al .. COa O p. Q O
F �, d a; QU dQ SQd Z ZdU ;; i
w .Zct
cn
mended contribution rate. An asset valuation method is used to smooth the
1
LOTS 1 AND 2
.__ EXHIBIT "D" _.. ...............
90,tausf969t969MVWM69016961M69696969 MO16969699M �° � d d
,^ C NNNNNNNNNNNNNNNNNNNNNNNNNNIN < Hr
NNNNNNNNNNNNNNNNNNNNNNNNNNN
C C d E
W • • • I nhnrrnnrnrnt`rnNINNI `nrNnr nrti n 0 u v .
a C
jd d i ..... .r r r r r.--r.--r r r r r r r I V' J° W C, C
W 0 C
N'- a 101.N C .
•"1 69 69 V9 Vi 69 69 69 69(a(a 69 E9 f9 69 69 E9 6 69 69 69 f9 M M fa 69 69 M 69 E9 69 8(.32 c
0)O)0) O) 0) O) O)0)O) 0) O) O) O) O) O) O)0)0) 0) O)O)O)O) 0) 0) 0) I V'
v v a v v v v v v v v v v v v v v v v v v v v v v v t n
W • ' ' • N N N N N N N N N N N N N N N N N N N N N N N N N N CY
x C ( ' N N N N N N N N N N N N N N N(N N NN N N N N N N N 106 '
N0 W n n n n n n n N n n N n n n n n n n n N n n N n n N n�
0 01
m N
69 69 69 V96969 69E9400 6969 69 N 69 69 69 69 69 69 69 69 69 69 V,6969696969 69
n n n n n n n n n nn n n n nn n n n n n n n n n n n n n n •
Co O)O) 0)Ol O)O)O)O)O)Ol Ol O)O)o Ol 01 Ol 00 O)O)Ol O)O)O1 0)Ol O)O)o
vttY avvtCYav ,IMLLY,1-0 r<r ,1ThCYCYt
Co 0o ao 0o 0o Co Co 0o m m m Co m Co m oo m ao eo 0o Co m m Co m oo m oo m oo
00 I N N N N N N.N N N N N N N N N N N N N N N N N N N N N N N N
12 J I N N N N N N N N N N N N N N N N N N N N N N N N N N N tW N N m
... E
mP,
y
D NnlD Nn .
d0)N d3
t0 OmO i0t0mt0 o _cm
.w yyF- O
W C ' lNDlnONnnNNNnNnnNNnNNNnN
0OMtOMMt0000M000OMMW 024 ,40
LL mml NNNNNNNNNNNNNNNNNNNNNNNNNN CCdV
p x 7 I O o O O O O o O O o O o O O O O O O O O O o O o o O N 0, ( d
• F; 11 ul U1 U1 vi ui to to ul ul U1 u1 U,ul uj u1 N u7 u1 ui ul U1 u1 ui vi to t. 10 i0 y d•O
o C C C .-I o o Co o Co.t.-I c-1 C Co o o .-i -I o o C .-I-C.-1 o Ct
• N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N C O;C 0 '
000000000000000000000000000000 E~ > E
C IA—A O W d
d II y.� 0 >
d 0.0 � I (0 d,p y 0
oa I Of" Edda
J >• m I d y .y
O I d i y• C d
° Eo `°w12
to to to to to to to t0 to to to to to to to tc to to to to to to'to to to to 2 E c
N N N N N N N N N N N N N N N N N N N N N N N N N N Ox A Y a
"'
W C ' ' ' ' t0 t0 t0 M O M t0 t0 t0 t0 t0 m m O t0 t0 tO t0 O t0 t0 m tO t0 W M CID'. to 0
tD tD t0 t0 tO t0 UI U7 t0 t0 t0 t0 t0 lD t0 t0 O tD tD 60 tD tO tD t0 to t0 I .A C
y O x c0 00000000000000000000000000 0 O
N- m— Ui Ui tri Ui Ui vi 69 vi U,vi ui vi ui vi vi ui tri vi ui C.vi ui vi vi vi vi 000 Ia▪ A
H> N Co .-I...i e-1 Co C o Co.-I .-I Co o Co Co C Co o.i C Co.i .i C Co A O O > (9 r
LLN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N o w g10, d C C
0 to N vl N ul M Ul Ct U)to u)t0 U)N M CO U Ol to o ul H U)N ul M N V O ul C d y a E d o .-1 N M IA V tlJ n Di Oi~O .i,4 Co Co•1"'t N ''"I.a-•1'"t 'y Q,m d
W M
W .0 I • t d c j0 LL
0.
`t= d
Q Z y MO •
(0 A . .
C-25A CITY OF OMAHA
LEGISLATIVE CHAMBER
Omaha,Nebraska
RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA:
0
WHEREAS, bids were submitted on October 17, 2012 for OPW 52305, being Burtzard
Pumping Station Junction Box Repair; and,
_ G
WHEREAS, Neuvirth Construction, Inc. submitted a bid of $187,254.06, being the
lowest and best bid received for OPW 52305.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF OMAHA:
THAT, as recommended by the Mayor, the contract with Neuvirth Construction, Inc. for
OPW 52305, being Burt-Izard Pumping Station Junction Box Repair, in the amount of
$187,254.06 is herby approved; and, that the Finance Department is authorized to pay this cost
from the FEMA Fund 12122, Operation Grants — Other Public Services Organization 132038,
year 2012 expenditures.
200212scp APPROVED AS TO FORM:
.4/7( - --
/P•Qc Z.
A£5 7 CITY ATTORNEY DATE
By..%-2074 .
u� ilmember
Adopted OV — • 2012 6-0
.
City Clerk // /'/
c
Approved.... .
Mayor
struction Company, Inc. $66.82 per LF $16,705.00
Judds Bros Construction Co $60.00 per LF $15,000.00
(LINES 1 Through 23 INCLUSIVE)
Bid Tabulation, generated • gu gerhar on 10/17/2012 12:00:26 PM for project OPW 52305
CERTIFIED BY: �� ��G L% DATE: In 7�/z
•
•
Page 6 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by: guygerhard for project OPW 52305
$1.25 per SY $3,845.00
15 900.015 BUFFALOGRASS SPRIGGING
Engineeer's Estimate 568 @ $14.00 per SY $7,952.00
Neuvirth's Construction, Inc. $6.00 per SY $3,408.00 •
L.G. Roloff Construction Company, Inc. $17.88 per SY $10,155.84
Judds Bros Construction Co $18.00 per $10,224.00
16 900.016 TREES,2-2.5"CALIPER
Engineeer's Estimate 10 @ $350.00 EACH $3,500.00
Neuvirth's Construction, Inc. $246.00 EACH $2,460.00
L.G. Roloff Construction Company,Inc. $439.83 EACH $4,398.30
Judds Bros Construction Co $320.00 EACH $3,200.00
17 900.017 TREES, 1.5-2"CALIPER
Engineeer's Estimate 7 @ $200.00 EACH $1,400.00
Neuvirth's Construction, Inc. $246.00 EACH $1,722.00
L.G. Roloff Construction Company, Inc. $310.14 EACH $2,170.98
Judds Bros Construction Co $280.00 EACH $1,960.00
18 900.018 SHRUBS, 18-24"HEIGHT
Engineeer's Estimate 59 @ $50.00 EACH $2,950.00
Neuvirth's Construction, Inc. $27.00 EACH • $1,593.00
L.G. Roloff Construction Company, Inc. $45.11 EACH $2,661.49
Judds Bros Construction Co $40.00 EACH $2,360.00
19 900.019 SHRUBS, 12-15"HEIGHT
Engineeer's Estimate 144 @ $30.00 EACH $4,320.00
Neuvirth's Construction, Inc. $30.00 EACH $4,320.00
L.G.Roloff Construction Company, Inc. $49.62 EACH $7,145.28
Judds Bros Construction Co $42.00 EACH $6,048.00
Page 5 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by:guygerhard for project OPW 52305
06 ° .° 0 C c o n c -0 0I
O iA O C la. CIO
O C C LI < CZ
7 CO ...I) 5 o cc .. N =o CO o al .. COa O p. Q O
F �, d a; QU dQ SQd Z ZdU ;; i
w .Zct
cn
mended contribution rate. An asset valuation method is used to smooth the
1
LOTS 1 AND 2
.__ EXHIBIT "D" _.. ...............
90,tausf969t969MVWM69016961M69696969 MO16969699M �° � d d
,^ C NNNNNNNNNNNNNNNNNNNNNNNNNNIN < Hr
NNNNNNNNNNNNNNNNNNNNNNNNNNN
C C d E
W • • • I nhnrrnnrnrnt`rnNINNI `nrNnr nrti n 0 u v .
a C
jd d i ..... .r r r r r.--r.--r r r r r r r I V' J° W C, C
W 0 C
N'- a 101.N C .
•"1 69 69 V9 Vi 69 69 69 69(a(a 69 E9 f9 69 69 E9 6 69 69 69 f9 M M fa 69 69 M 69 E9 69 8(.32 c
0)O)0) O) 0) O) O)0)O) 0) O) O) O) O) O) O)0)0) 0) O)O)O)O) 0) 0) 0) I V'
v v a v v v v v v v v v v v v v v v v v v v v v v v t n
W • ' ' • N N N N N N N N N N N N N N N N N N N N N N N N N N CY
x C ( ' N N N N N N N N N N N N N N N(N N NN N N N N N N N 106 '
N0 W n n n n n n n N n n N n n n n n n n n N n n N n n N n�
0 01
m N
69 69 69 V96969 69E9400 6969 69 N 69 69 69 69 69 69 69 69 69 69 V,6969696969 69
n n n n n n n n n nn n n n nn n n n n n n n n n n n n n n •
Co O)O) 0)Ol O)O)O)O)O)Ol Ol O)O)o Ol 01 Ol 00 O)O)Ol O)O)O1 0)Ol O)O)o
vttY avvtCYav ,IMLLY,1-0 r<r ,1ThCYCYt
Co 0o ao 0o 0o Co Co 0o m m m Co m Co m oo m ao eo 0o Co m m Co m oo m oo m oo
00 I N N N N N N.N N N N N N N N N N N N N N N N N N N N N N N N
12 J I N N N N N N N N N N N N N N N N N N N N N N N N N N N tW N N m
... E
mP,
y
D NnlD Nn .
d0)N d3
t0 OmO i0t0mt0 o _cm
.w yyF- O
W C ' lNDlnONnnNNNnNnnNNnNNNnN
0OMtOMMt0000M000OMMW 024 ,40
LL mml NNNNNNNNNNNNNNNNNNNNNNNNNN CCdV
p x 7 I O o O O O O o O O o O o O O O O O O O O O o O o o O N 0, ( d
• F; 11 ul U1 U1 vi ui to to ul ul U1 u1 U,ul uj u1 N u7 u1 ui ul U1 u1 ui vi to t. 10 i0 y d•O
o C C C .-I o o Co o Co.t.-I c-1 C Co o o .-i -I o o C .-I-C.-1 o Ct
• N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N C O;C 0 '
000000000000000000000000000000 E~ > E
C IA—A O W d
d II y.� 0 >
d 0.0 � I (0 d,p y 0
oa I Of" Edda
J >• m I d y .y
O I d i y• C d
° Eo `°w12
to to to to to to to t0 to to to to to to to tc to to to to to to'to to to to 2 E c
N N N N N N N N N N N N N N N N N N N N N N N N N N Ox A Y a
"'
W C ' ' ' ' t0 t0 t0 M O M t0 t0 t0 t0 t0 m m O t0 t0 tO t0 O t0 t0 m tO t0 W M CID'. to 0
tD tD t0 t0 tO t0 UI U7 t0 t0 t0 t0 t0 lD t0 t0 O tD tD 60 tD tO tD t0 to t0 I .A C
y O x c0 00000000000000000000000000 0 O
N- m— Ui Ui tri Ui Ui vi 69 vi U,vi ui vi ui vi vi ui tri vi ui C.vi ui vi vi vi vi 000 Ia▪ A
H> N Co .-I...i e-1 Co C o Co.-I .-I Co o Co Co C Co o.i C Co.i .i C Co A O O > (9 r
LLN N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N o w g10, d C C
0 to N vl N ul M Ul Ct U)to u)t0 U)N M CO U Ol to o ul H U)N ul M N V O ul C d y a E d o .-1 N M IA V tlJ n Di Oi~O .i,4 Co Co•1"'t N ''"I.a-•1'"t 'y Q,m d
W M
W .0 I • t d c j0 LL
0.
`t= d
Q Z y MO •
(0 A . .
• No Woo s9 po co t
I
00 Ihfl
P . Co
CD 0
Z w •• N ` Jrri •� Cd CD O
UfiUp
<ON 7nO l C : n cn CD-. O CIO 1Ot co
•
•
k
Y�
10204 South 152nd Street Diff From Low: $59,970.82
Omaha NE 68138-3866
Judds Bros Construction Co Bid: $274,668.00
3835 N.68th St.,PO Box 5344 Diff From Low: $87,413.94
Lincoln NE 68505-
Number of Bids: 3
• Low Bid: $187,254.06
High Bid: $274,668.00
Average Bid:: $236,382.31
•
Page 3 of 6, 10/17/2012 12:00:26 PM, Bid Tabulation, Generated by:guygerhard for project OPW 52305