Loading...
RES 2020-0657 - PSA with Snyder & Associates for OPW 53855 - Concrete Panel Repair, 2020-C ProjectProject Cost Breakdown Exhibit "_" Sheet 1 of 2 Project Name: 2020 Concrete Pavement Panel Repair Project Number: Consultant: Snyder & Associates, Inc.Control Number: Consultant PM: Mike Geier NDOR PC: Date: Principal Project Manager Engineer Designer/CADD Tech Survey Crew Chief Survey Crew Member Inspector 1 Inspector 2 Administrative User Defined Subtotal Subconsultants: Printing And Reproduction: Mileage/Travel: Lodging/Meals: Material Testing: Subtotal Labor Costs Direct Expenses TOTAL COST 1. Project Management & Coordination 2. Meetings 3. Traffic Control Plan 4. SWPPP Inspections/Manual Updates 5. Construction Survey/Staking 6. Construction Consultation/Site Manager & Daily W 7. Girder Shim Surveying (Bridge Projs Only) 8. Perform Bearing Calculations 9. Construction Inspection 10. Perform Material Sampling and Testing 11. As-Built Drawings 12. Final Inspections 13. Project Closeout $11,008.44 $11,008.44 $7,972.04 $7,972.04 Project Cost & Breakdown Construction Engineering OPW 53855 LABOR COSTS $265.81 May 13, 2020 $189,399.72 DIRECT EXPENSES TOTAL PROJECT COSTS $26,449.00 Amount $162,950.72 $1,449.00 $25,000.00 $26,449.00 1,336 $97.22 $162,950.72 Amount 12 $75.23 $902.76 $129,885.92 $111.75 $22,328.04 Classification AmountSpecific RateHours 84 88 $9,834.00 $18,661.48 $3,798.24 $9,126.32 Amount $112,384.20 LABOR COST BY MAJOR TASKS Direct Labor $18,661.48 $3,798.24 $9,126.32 $112,384.20 Project Cost Breakdown Exhibit "_" Sheet 2 of 2 14. Other $162,950.72$162,950.72