Loading...
RES 2013-1026 - Contract with Swain Construction Inc for OPW 51760, Dodge St pedestrian improvements �MAFiq NE ,1 .,.. t ,04,4T F B8 i Public Works Department "14lb Omaha/Dou las Civic Center n ft 1 rg r. $�Z p July 30, 2013 3 J I_ ; a ; �� r- ` 1819 I�arnam Street,Suite 601 Omaha,Nebraska 68183-0601 0 (402)444-5220 apo FEBR-r CITY C! r , Fax(402)444-5248 City of Omaha F` A:1 "vE F:.* ( ,, Robert G. Stubbe, P.E. Jean Stothert,Mayor Public Works Director Honorable President and Members of the City Council, The attached resolution approves the contract with Swain Construction, Inc. for OPW 51760, being Dodge Street from 52nd to 40`1' Streets pedestrian improvements and mill and overlay. The following bids were received on June 26, 2013. A detailed bid tabulation is attached. Contractor Total Bid `SWAIN CONSTRUCTION, INC. $2,061,166.97 (SOLE BID) 'The contractor has on file a current Contract Compliance Report Form (CC-1). As is City policy, the Human Rights and Relations Department will review the contractor to ensure compliance with the Contract Compliance Ordinance. The Finance Department is authorized to pay the cost of OPW 51760 from the City Street Maintenance Fund 12129, Major Street Resurfacing Organization 116159 in the amount of $1,406.128.11, and from the 2006 Transportation Fund 13182, 2010 Issue Transportation Bonds Organization 117115 in the amount of $655,038.86, year 2013 expenditures. All resurfacing costs will be reimbursed by NDOR. The Public Works Department recommends the acceptance of the bid from Swain Construction, Inc. in the amount of$2,061,116.97, being the sole bid received, and requests your consideration and approval of this resolution. Respectfully submitted, Referred to City Council for Consideration: /lam "%$ .� —7/ ci I P.) Ro ert G. Stubbe, P.E. Date Mayor's Office Date Public Works Director Approved as to Funding: Approved: ave._ - t 0 ---ti,eoltd,,,,f.:„22.)u.,A„...„_. 11(111.3 .1-p Allen 1-Ierink Date Human Rights and Relations Date Acting Finance Director Department 223913scp Bid Tabulation Public Works Department Omaha, Nebraska Wednesday, June 26, 2013 Project Summary OPW 51760 English Yes Metric: No Description: Dodge Street-52nd to 40th Pedestrian Improvements&Mill and Overlay Start Date: Completion Date: Labor Release Date: Field Book Number: Test Core Lengths: Council Resolution: Adoption Date: Percent Reserve Due: 10.0% Percent Complete: 0.0% Percent Time Used: 0.0% Engineer's Total: $1,831,646.00 Contract Total $0.00 Total Penalties: $0.00 Total Payments: $0.00 Contractor: Phone#: Fax#: Email address: Page 1 of 9, 6/26/2013 2:07:17 PM, Bid Tabulation, Generated by:guygerhard for project OPW 51760 • Account/Funding Summary Fund Org. Description Engineer Contract Penalties Payments 12129 116159 Major Street Resurfacing $1,249,548.90 $0.00 $0.00 $0.00 13182 117115 2010 Issue Transportation Bonds $582,097.10 $0.00 $0.00 $0.00 $1,831,646.00 $0.00 $0.00 $0.00 Page 2 of 9, 6/26/2013 2:07:17 PM, Bid Tabulation, Generated by:guygerhard for project OPW 51760 Bid Summary(low to high bidder) Contractor Engineer's Estimate: $1,831,646.00 Diff From Low: ($229,520.97) Swain Construction, Inc. Bid: $2,061,166.97 6002 North 89th Circle Diff From Low: $0.00 Omaha NE 68134- Number of Bids: 1 Low Bid: $2,061,166.97 High Bid: $2,061,166.97 Average Bid:: $2,061,166.97 Page 3 of 9, 6/26/2013 2:07:17 PM, Bid Tabulation, Generated by:guygerhard for project OPW 51760 Type Line# Item# Description Quantity Price Total 1 001.000 MOBILIZATION Engineeer's Estimate 1 @ $100,000.00 per LS $100,000.00 Swain Construction, Inc. $100,000.00 per LS $100,000.00 2 100.000 CLEARING AND GRUBBING GENERAL Engineeer's Estimate 1 @ $25,000.00 per LS $25,000.00 Swain Construction, Inc. $90,874.00 per LS $90,874.00 3 104.000 EARTHWORK(EXCAVATION) Engineeer's Estimate 220 @ $8.00 per CY $1,760.00 Swain Construction, Inc. $42.40 per CY $9,328.00 4 106.000 REMOVE PAVEMENT Engineeer's Estimate 688 @ $12.00 per SY $8,256.00 Swain Construction, Inc. $16.05 per SY $11,042.40 5 108.000 REMOVE DRIVEWAY Engineeer's Estimate 747 @ $6.00 per SY $4,482.00 Swain Construction, Inc. $7.46 per SY $5,572.62 6 108.001 REMOVE SIDEWALK Engineeer's Estimate 16987 @ $1.00 per SF $16,987.00 Swain Construction, Inc. $1.50 per SF $25,480.50 7 109.001 REMOVE COMBINATION CURB AND GUTTER Engineeer's Estimate 2156 @ $4.00 per LF $8,624.00 Swain Construction, Inc. $5.87 per LF $12,655.72 8 900.008 REMOVE RETAINING WALL Engineeer's Estimate 546 @ $15.00 per LF $8,190.00 Swain Construction, Inc. $35.25 per LF $19,246.50 9 111.009 REMOVE STEPS Engineeer's Estimate 28 @ $200.00 EACH $5,600.00 Swain Construction, Inc. $302.00 EACH $8,456.00 10 111.042 REMOVE AND RELOCATE SPRINKLER SYSTEM HEAD Engineeer's Estimate 10 @ $75.00 EACH $750.00 Swain Construction, Inc. $125.00 EACH $1,250.00 11 111.043 REMOVE AND RELOCATE SPRINKLER SYSTEM TRUNK LINE Engineeer's Estimate 300 @ $3.00 per LF $900.00 Swain Construction, Inc. $11.15 per LF $3,345.00 12 131.000 REMOVE INLET Engineeer's Estimate 1 @ $400.00 EACH $400.00 Swain Construction, Inc. $469.00 EACH $469.00 13 200.210 10"CONCRETE PAVEMENT-TYPE L65 Engineeer's Estimate 331 @ $42.00 per SY $13,902.00 Swain Construction, Inc. $69.20 per SY $22,905.20 Page 4 of 9, 6/26/2013 2.07:17 PM, Bid Tabulation, Generated by:guygerhard for project OPW 51760 Type Line# Item # Description Quantity Price Total 14 202.005 CONSTRUCT COMBINATION CURB AND GUTTER Engineeer's Estimate 1710 @ $25.00 per LF $42,750.00 Swain Construction, Inc. $22.85 per LF $39,073.50 15 203.207 7"CONCRETE DRIVEWAY-TYPE L65 Engineeer's Estimate 278 @ $35.00 per SY $9,730.00 Swain Construction, Inc. $52.80 per SY $14,678.40 16 203.407 7"CONCRETE DRIVEWAY-TYPE L85 Engineeer's Estimate 633 @ $42.00 per SY $26,586.00 Swain Construction, Inc. $58.65 per SY $37,125.45 17 900.017 BRICK PAVER SIDEWALK Engineeer's Estimate 1083 @ $19.00 per SF $20,577.00 Swain Construction, Inc. $19.60 per SF $21,226.80 18 204.001 6"CONCRETE SIDEWALK Engineeer's Estimate 13658 @ $4.50 per SF $61,461.00 Swain Construction, Inc. $6.01 per SF $82,084.58 19 900.019 CONSTRUCT 6"SIDEWALK w/INTEGRAL CURB Engineeer's Estimate 732 @ $5.00 per SF $3,660.00 Swain Construction, Inc. $5.74 per SF $4,201.68 20 204.100 CONSTRUCT CONCRETE CURB RAMP Engineeer's Estimate 487 @ $8.00 per SF $3,896.00 Swain Construction, Inc. $9.86 per SF $4,801.82 21 900.021 CONSTRUCT 6"IMPRINTED CONCRETE SIDEWALK Engineeer's Estimate 721 @ $7.00 per SF $5,047.00 Swain Construction, Inc. $9.31 per SF $6,712.51 22 900.022 INSTALL DETECTABLE WARNING PANELS Engineeer's Estimate 80 @ $32.00 per SF $2,560.00 Swain Construction, Inc. $16.05 per SF $1,284.00 23 310.000 CRUSHED ROCK FOR SURFACING Engineeer's Estimate 500 @ $22.00 per TON $11,000.00 Swain Construction, Inc. $35.50 per TON $17,750.00 24 320.100 FLY ASH Engineeer's Estimate 15 @ $32.00 per TON $480.00 Swain Construction, Inc. $96.95 per TON ' $1,454.25 25 400.000 AGGREGATE BEDDING Engineeer's Estimate 5 @ $21.00 per TON $105.00 Swain Construction, Inc. $49.95 per TON $249.75 26 401.015 CONSTRUCT 15"R.C.P.,CLASS III Engineeer's Estimate 14 @ $55.00 per LF $770.00 Swain Construction, Inc. $87.90 per LF $1,230.60 Page 5 of 9, 6/26/2013 2:07:17 PM, Bid Tabulation, Generated by:guygerhard for project OPW 51760 Type Line# Item# Description Quantity Price Total 27 417.020 EXTERNAL FRAME SEAL Engineeer's Estimate 5 @ $400.00 EACH $2,000.00 Swain Construction, Inc. $414.00 EACH $2,070.00 28 421.002 CONSTRUCT TYPE"A-A"INLET Engineeer's Estimate 1 @ $2,500.00 EACH $2,500.00 Swain Construction, Inc. $3,891.00 EACH $3,891.00 29 900.029 CONSTRUCT 15"PCC COLLAR w/BEND Engineeer's Estimate 1 @ $350.00 EACH $350.00 Swain Construction, Inc. $329.00 EACH $329.00 30 550.020 INSTALL FABRIC SILT FENCE-LOW POROSITY Engineeer's Estimate 180 @ $2.50 per LF $450.00 Swain Construction, Inc. $2.69 per LF $484.20 31 550.310 CURB INLET PROTECTION Engineeer's Estimate 6 @ $200.00 EACH $1,200.00 Swain Construction, Inc. $229.00 EACH $1,374.00 32 605.000 SODDING Engineeer's Estimate 200 @ $1.25 per SY $250.00 Swain Construction, Inc. $11.85 per SY $2,370.00 33 900.033 CONSTRUCT FENCE-4'ORNAMENTAL Engineeer's Estimate 27 @ $140.00 per LF $3,780.00 Swain Construction, Inc. $115.00 per LF $3,105.00 34 900.034 CONSTRUCT REINFORCED CONCRETE CURB WALL Engineeer's Estimate 2183 @ $22.00 per SF $48,026.00 Swain Construction, Inc. $39.00 per SF $85,137.00 35 900.035 CONSTRUCT BRICK FACE OF RETAINING WALL Engineeer's Estimate 1337 @ $15.00 per SF $20,055.00 Swain Construction, Inc. $51.30 per SF $68,588.10 36 900.036 CONSTRUCT PRECAST CAP Engineeer's Estimate 815 @ $20.00 per LF $16,300.00 Swain Construction, Inc. $61.25 per LF $49,918.75 37 900.037 REINFORCED PCC STAIRS Engineeer's Estimate 45 @ $150.00 EACH $6,750.00 Swain Construction, Inc. $604.00 EACH $27,180.00 38 900.038 DRILL&GROUT#5 x 18"BAR ON 4'-0"CENTERS Engineeer's Estimate 90 @ $5.00 EACH $450.00 Swain Construction, Inc. $5.65 EACH $508.50 39 760.000 ADJUST MANHOLE TO GRADE . Engineeer's Estimate 4 @ $300.00 EACH $1,200.00 Swain Construction, Inc. $264.00 EACH $1,056.00 Page 6 of 9, 6/26/2013 2:07:17 PM, Bid Tabulation, Generated by:guygerhard for project OPW 51760 Type Line# Item # Description Quantity Price Total • 40 780.000 ADJUST GAS VALVE TO GRADE Engineeer's Estimate 2 @ $200.00 EACH $400.00 Swain Construction, Inc. $245.00 EACH $490.00 41 780.001 ADJUST WATER VALVE TO GRADE Engineeer's Estimate 5 @ $200.00 EACH $1,000.00 Swain Construction, Inc. $245.00 EACH $1,225.00 42 900.042 INSTALL SWPPP SIGN Engineeer's Estimate 2 @ $300.00 EACH $600.00 Swain Construction, Inc. $204.00 EACH $408.00 43 742.002 PROVIDE SECURITY FENCING Engineeer's Estimate 1 @ $5,000.00 per LS $5,000.00 Swain Construction, Inc. $3,591.00 per LS $3,591.00 44 900.044 REMOVE OVERHEAD SIGN Engineeer's Estimate 3 @ $100.00 EACH $300.00 Swain Construction, Inc. $112.00 EACH $336.00 45 900.045 FLAGPERSON Engineeer's Estimate 1 @ $6,000.00 per LS $6,000.00 Swain Construction, Inc. $19,960.00 per LS $19,960.00 46 838.000 FURNISHING&OPERATING FLASHING ARROW PANEL Engineeer's Estimate 400 @ $25.00 per DAY $10,000.00 Swain Construction, Inc. $27.95 per DAY $11,180.00 47 839.000 BARRICADES AND WARNING SIGNS Engineeer's Estimate 25000 @ $1.50 per DAY $37,500.00 Swain Construction, Inc. $0.48 per DAY $12,000.00 48 900.048 TEMPORARY PAVEMENT MARKING,WHITE Engineeer's Estimate 4000 @ $0.75 per LF $3,000.00 Swain Construction, Inc. $0.92 per LF $3,680.00 49 900.049 TEMPORARY PAVEMENT MARKING, DOUBLE YELLOW Engineeer's Estimate 1200 @ $1.25 per LF $1,500.00 Swain Construction, Inc. $0.92 per LF $1,104.00 50 900.050 RENTAL OF LOADER, FULLY OPERATED Engineeer's Estimate 50 @ $115.00 per HR $5,750.00 Swain Construction, Inc. $100.00 per HR $5,000.00 51 900.051 RENTAL OF DUMP TRUCK, FULLY OPERATED Engineeer's Estimate 50 @ $95.00 per HR $4,750.00 Swain Construction, Inc. $84.55 per HR $4,227.50 52 900.052 FIELD OFFICE Engineeer's Estimate 1 @ $7,000.00 per LS $7,000.00 Swain Construction, Inc. $2,175.00 per LS $2,175.00 Page 7 of 9, 6/26/2013 2:07:17 PM, Bid Tabulation, Generated by:guygerhard for project OPW 51760 Type Line# Item# Description Quantity Price Total 53 900.053 REMOVE PAVEMENT MARKING Engineeer's Estimate 1200 @ $0.50 per LF $600.00 Swain Construction, Inc. $1.17 per LF $1,404.00 54 900.054 BUILD TREE WELL PLANTER Engineeer's Estimate 4 @ $3,000.00 EACH $12,000.00 Swain Construction, Inc. $1,865.00 EACH $7,460.00 55 900.055 CONSTRUCT ASPHALT SURFACE COURSE, SPH PG70-34,25%RAP Engineeer's Estimate 9763 @ $95.00 per TON $927,485.00 Swain Construction, Inc. $87.70 per TON $856,215.10 56 303.000 COLD PLANING-ASPHALT Engineeer's Estimate 75530 @ $2.50 per SY $188,825.00 Swain Construction, Inc. $2.79 per SY $210,728.70 57 303.001 COLD PLANING-CONCRETE Engineeer's Estimate 1654 @ $3.00 per SY $4,962.00 Swain Construction, Inc. $3.46 per SY $5,722.84 58 900.058 ADJUST UTILITY TO GRADE Engineeer's Estimate 54 @ $500.00 EACH $27,000.00 Swain Construction, Inc. $692.00 EACH $37,368.00 59 201.407 7"CONCRETE BASE-TYPE L85 Engineeer's Estimate 130 @ $85.00 per SY $11,050.00 Swain Construction, Inc. $70.40 per SY $9,152.00 60 106.002 REMOVE ASPHALT SURFACE COURSE Engineeer's Estimate 100 @ $20.00 per SY $2,000.00 Swain Construction, Inc. $7.21 per SY $721.00 61 900.061 ASPHALTIC CONCRETE FOR PAVEMENT REPAIR Engineeer's Estimate 10 @ $100.00 per TON $1,000.00 Swain Construction, Inc. $146.00 per TON $1,460.00 62 760.005 ADJUST INLET TO GRADE Engineeer's Estimate 19 @ $1,000.00 EACH $19,000.00 Swain Construction, Inc. $854.00 EACH $16,226.00 63 900.063 BARRICADES, MAJOR STREET Engineeer's Estimate 1 @ $10,000.00 EACH $10,000.00 Swain Construction, Inc. $10,000.00 EACH $10,000.00 64 838.000 FURNISHING&OPERATING FLASHING ARROW PANEL Engineeer's Estimate 8 @ $100.00 per DAY $800.00 Swain Construction, Inc. $67.05 per DAY $536.40 65 850.000 PLASTIC PAVEMENT MARKING-WHITE Engineeer's Estimate 5320 @ $4.00 per LF $21,280.00 Swain Construction, Inc. $3.46 per LF $18,407.20 Page 8 of 9, 6/26/2013 2:07:17 PM, Bid Tabulation, Generated by:guygerhard for project OPW 51760 Type Line# Item# Description Quantity Price Total 66 850.001 PLASTIC PAVEMENT MARKING-YELLOW Engineeer's Estimate 8390 @ $4.00 per LF $33,560.00 Swain Construction, Inc. $3.46 per LF $29,029.40 67 900.067 TEMPORARY LANE MARKINGS Engineeer's Estimate 2500 @ $1.00 per LF $2,500.00 Swain Construction, Inc. $1.14 per LF $2,850.00 (LINES 1 Through 67 INCLUSIVE) Bid Tabulation, generated by 9uygerhard on 6/26/2013 2:07:17 PM for project OPW 51760 CERTIFIED BY: �1rd'..rzeWfrAr',/..-(1( DATE: , 7_2 7/ Page 9 of 9, 6/26/2013 2:07:17 PM, Bid Tabulation, Generated by: guygerhard for project OPW 51760 C-25A CITY OF OMAHA LEGISLATIVE CHAMBER Omaha,Nebraska RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: WHEREAS, bids were submitted on June 26, 2013 for OPW 51760, being Dodge Street from 52" to 40th Streets pedestrian improvements and mill and overlay; and, WHEREAS, Swain Construction, Inc. submitted a bid of $2,061,166.97, being the sole bid received for OPW 51760. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA: THAT, as recommended by the Mayor, the contract with Swain Construction, Inc. for OPW 51760, being Dodge Street from 52„d to 40th Streets pedestrian improvements in the amount of$2,061,166.97 is hereby approved; and, that the Finance Department is authorized to pay this cost from the City Street Maintenance Fund 12129, Major Street Resurfacing Organization 116159 in the amount of $1,406,128.11, and from the 2006 Transportation Fund 13182, 2010 Issue Transportation Bonds Organization 117115 in the amount of $655,038.86, year 2013 expenditures. 224013scp APPROVED AS TO FORM: � ITY ATTORNEY DATE By 44,p.te Councilmember Adopted JUL... ....3 2013.. . 7 0 C' Clerk ?/25/13 Approve .1... !` Mayor NO. ....l..V..LJ Resolution by Res. that, as recommended by the Mayor, the contract with Swain Construction. Inc. for OPW 51760. being Dodge Street from 52"d to 40`i' Streets pedestrian improvements and mill and overlay in the amount of$2,061,166.97 is hereby approved; and, that the Finance Department is authorized to pay this cost from the City Street Maintenance Fund 12129, Major Street Resurfacing Organization 116159 in the amount of $1,406,128.11, and from the 2006 Transportation Fund 13182, 2010 Issue Transportation Bonds Organization 117115 in the amount of $655,038.86, year 2013 expenditures. 224013Ascp Presented to City Council JUL 2 3 2013 Adopted 1 gaoler grocun City Clerk