RES 2020-0540 - PSA with Jacobs Engineering for implementation of the Asset Management Recommendations ProjectIV.C​OMPENSATION AND PAYMENT A.The cost of services as specified in the Scope of Service, shall be performed on an hourly basis, but in no event shall it exceed $74,272.04. Detailed breakdown of costs shall be shown in Exhibit “C”. B.Reimbursable expenses shall be billed to the City by the Provider. C.INCREASE OF FEES The parties hereto acknowledge that, as of the date of the execution of the Agreement, Section 10-142 of the Omaha Municipal Code provides as follows: Any amendment to contracts or purchases which taken alone increase the original fee as awarded (a) by ten percent, if the original fee is one hundred fifty thousand dollars ($150,000) or more, or (b) by seventy-five thousand dollars ($75,000) or more, shall be approved by the City Council in advance of the acceptance of any purchase in excess of such limits. However, neither contract nor purchase amendments will be split to avoid advance approval of the City Council. The originally approved scope and primary features of a contract or purchase will not be significantly revised as a result of amendments not approved in advance by the City Council. The provisions of this section will be quoted in all future City contracts. Nothing in this section is intended to alter the authority of the Mayor under section 5.16 of the Charter to approve immediate purchases. V.OWNERSHIP OF INSTRUMENTS OF SERVICE The City acknowledges the Provider’s documents, including electronic files, as instruments of professional service. Nevertheless, upon completion of the services and payment in full of all monies due to the Provider, the final documents prepared under this Agreement shall become the property of the City. The City shall not reuse on another Project or make any modifications to the documents without prior written authorization of the Provider. The City agrees, to the fullest extent permitted by law, to indemnify and hold harmless the Provider, its officers, directors, employees and subconsultants (collectively, Provider) against any damages, liabilities or costs, including reasonable attorneys’ fees and defense costs, arising from or in any way connected with the unauthorized reuse or modification of the documents by the City, regardless of whether such reuse or modification is for use on this Project or another Project. VI.ADDITIONAL SERVICES In the event additional services for the aforementioned Project not covered under this Agreement are required, the Provider agrees to provide such services at a mutually agreed upon cost. VII.INSURANCE REQUIREMENTS The Provider shall carry professional liability insurance in the minimum amount of one half million dollars and shall carry workers’ compensation insurance in accordance with the statutory requirements of the State of Nebraska. VIII.INDEMNIFICATION The Provider agrees, to the fullest extent permitted by law, to indemnify, defend and hold harmless the City, its officers, directors and employees (collectively, City) against all damages, liabilities or costs, including reasonable attorney’s fees and defense costs, to the extent caused by the Provider’s negligent performance of professional services under this Agreement and that of its subconsultants or anyone for whom the Provider is legally liable; provided, that with respect solely to the said duty to defend, such duty of the Provider to defend shall arise only if, and to the extent, such duty is covered by Provider’s liability insurance. The City agrees, to the fullest extent permitted by law, to indemnify and hold harmless the Provider, its officers, directors, employees and subconsultants (collectively, Provider) against all damages, liabilities or costs, including reasonable attorney’s fees and defense costs in connection with the Project, to the extent caused by the City’s negligent acts or the negligent acts of anyone for whom the City is legally liable. Neither the City nor the Provider shall be obligated to indemnify the other party in any matter whatsoever for the other party’s own negligence. IX.TERMINATION OF AGREEMENT This Agreement may be terminated by the City upon written notice to the Provider of such termination and specifying the effective date at least seven (7) days prior to the effective date of such termination. In the event of termination, the Provider shall be entitled to just and equitable payment for services rendered to the date of termination, and all finished or unfinished documents, data surveys, studies, drawings, maps, models, reports or photographs shall become, at the City’s option, its property. X.GENERAL CONDITIONS A.Non-discrimination​. Provider shall not, in the performance of this Agreement, discriminate or permit discrimination in violation of federal or state laws or local ordinances because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, age, or disability as recognized under 42 USCS 12101 et seq. and Omaha Municipal Code section 13-89, race, color, creed, religion, sex, marital status, sexual orientation, gender identity, national origin, age, or disability. B.Captions​. Captions used in this Agreement are for convenience and are not used in the construction of this Agreement. C.Applicable Laws​. Parties to this Agreement shall conform with all existing and applicable City ordinances, resolutions, state laws, federal laws, and existing and applicable rules and regulations. Nebraska law will govern the terms and the performance under this Agreement. D.Interest of the City​. Pursuant to Section 8.05 of the Home Rule Charter, no elected official or any officer or employee of the City shall have a financial interest, direct or indirect, in any City Agreement. Any violation of this section with the knowledge of the person or corporation contracting with the City shall render the Agreement voidable by the Mayor or Council. E.Interest of the Provider​. The Provider covenants that he presently has no interest and shall not acquire any interest, direct or indirect, which would conflict with the performance of services required to be performed under this Agreement; he further covenants that in the performance of this Agreement, no person having any such interest shall be employed. F.Merger​. This Agreement shall not be merged into any other oral or written agreement, lease, or deed of any type. This is the complete and full Agreement of the parties. G.Modification​. This Agreement contains the entire Agreement of the parties. No representations were made or relied upon by either party other than those that are expressly set forth herein. No agent, employee, or other representative of either party is empowered to alter any of the terms hereof unless done in writing and signed by an authorized officer of the respective parties. H.Assignment​. The Provider may not assign its rights under this Agreement without the express prior written consent of the City. I.Strict Compliance​. All provisions of this Agreement and each and every document that shall be attached shall be strictly complied with as written, and no substitution or change shall be made except upon written direction from authorized representative. J.LB 403 Contract Provisions​.​-​NEW EMPLOYEE WORK ELIGIBILITY STATUS -The Contractor is required and hereby agrees to use a federal immigration verification system to determine the work eligibility status of new employees physically performing service within the State of Nebraska. A federal immigration verification system means the electronic verification of the work authorization program authorized by the Illegal Immigration Reform and Immigrant Responsibility Act of 1996, 8 U.S.C. 1324a, known as the E-Verify Program, or an equivalent federal program designated by the United States Department of Homeland Security or other federal agency authorized to verify the work eligibility status of a newly hired employee. If the Contractor is an individual or sole proprietorship, the following applies: 1. The Contractor must complete the United States Citizenship Attestation Form, available on the Department of Administrative Services website at ​www.das.state.ne.us 2. If the Contractor indicates on such attestation form that he or she is a qualified alien, the Contractor agrees to provide the US Citizenship and Immigration Services documentation required to verify the Contractor’s lawful presence in the United States using the Systematic Alien Verification for Entitlements (SAVE) Program. 3. The Contractor understands and agrees that lawful presence in the United States is required and the Contractor may be disqualified or the contract terminated if such lawful presence cannot be verified as required by Neb. Rev. Stat. §4-108. K.Certificate of Authorization​. If this Agreement contemplates the performance of professional architecture or engineering work by the Provider, the Provider shall provide to the City, and maintain in good standing, a current Certificate of Authorization from the State of Nebraska as required by Neb. Rev. Stat. section 81-3436. L.Debarment or suspension by any federal agency. (This section applies if any part of this Agreement is funded by a federal agency.) Office of Management and Budget (OMB) guidelines require that any individual or entity that has been placed on the Excluded Parties List System (“EPLS” - available for review through ​www.sam.gov​) may not be a participant in a federal agency transaction that is a covered transaction or act as a principal of a person participating in one of those covered transactions. These guidelines apply to covered transactions under a grant from any federal agency for which a recipient expects to receive reimbursement for expenditures incurred or an advance on future expenditures. The Contractor providing goods and/or services to the City of Omaha certifies, by acceptance and execution of this Agreement, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency. The Contractor further agrees, by accepting and executing this Agreement, that it will include this clause without modification in all lower tier transactions, solicitations, proposals, contracts, and subcontracts. Where the Contractor or any lower tier participant is unable to certify this statement, it shall attach an explanation to this Agreement. M.Contract Compliance Ordinance No. 35344, Section 10-192 Equal Employment Opportunity Clause During the performance of this contract, the Contractor agrees as follows: 1)The Contractor shall not discriminate against any employee or applicant for employment because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, national origin, age, or disability. The Contractor shall ensure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, marital status, sexual orientation, gender identity, national origin, age, or disability. As used herein, the word “treated” shall mean and include, without limitation, the following: recruited, whether by advertising or by other means; compensated; selected for training, including apprenticeship; promoted; upgraded; demoted; downgraded; transferred; laid off; and terminated. The Contractor agrees to and shall post in conspicuous places, available to employees and applicants for employment, notices to be provided by the contracting officers setting forth the provisions of this nondiscrimination clause. 2)The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, creed, religion, sex, marital status, sexual orientation, gender identity, national origin, age, or disability. 3)The Contractor shall send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding a notice advising the labor union or worker’s representative of the Contractor’s commitments under the Equal Employment Opportunity Clause of the City and shall post copies of the notice in conspicuous places available to employees and applications for employment. 4)The Contractor shall furnish to the Human Rights and Relations Director all Federal forms containing the information and reports required by the Federal government for Federal contracts under Federal rules and regulations, and including the information required by Sections 10-192 to 10-194, inclusive, and shall permit reasonable access to his records. Records accessible to the Human Rights and Relations Director shall be those which are related to Paragraphs (1) through (7) of this subsection and only after reasonable notice is given the Contractor. The purpose for this provision is to provide for investigation to ascertain compliance with the program provided for herein. 5)The Contractor shall take such actions with respect to any subcontractor as the City may direct as a means of enforcing provisions of Paragraphs (1) through (7) herein, including penalties and sanctions for noncompliance; however, in the event the Contractor becomes involved in or is threatened with litigation as the result of such directions by the City, the City will enter into such litigation as necessary to protect the interests of the City and to effectuate the provisions of this division; and in the case of contracts receiving Federal assistance, the Contractor or the City may request the United States to enter into such litigation to protect the interests of the United States. 6)The Contractor shall file and shall cause his subcontractors, if any, to file compliance reports with the Contractor in the same form and to the same extent as required by the Federal government for Federal contracts under Federal rules and regulations. Such compliance reports shall be filed with the Human Rights and Relations Director. Compliance reports filed at such times as directed shall contain information as to the employment practices, policies, programs and statistics of the Contractor and his subcontractors. 7)The Contractor shall include the provisions of Paragraphs (1) through (7) of this Section, “Equal Employment Opportunity Clause”, and Section 10-193 in every subcontract or purchase order so that such provisions will be binding upon each subcontractor or vendor. N.Conflict. In the event of any conflict between this Agreement and any of the exhibits attached hereto, the terms of this Agreement shall take precedence. EXHIBIT “A” RESERVED EXHIBIT “B” SCOPE OF SERVICES OMA/EXHIBITB_SCOPE_OMAHA_PCWRRFMAXIMOMIGRATION_JEG_REV5.DOCX 1 Exhibit B SCOPE OF SERVICES Papillion Creek Water Resource Recovery Facility IBM Maximo Migration This Scope of Services is Exbibit B to the Standard Agreement for Professional Services between Jacobs Engineering Group Inc. (Provider), and the City of Omaha Public Works Department (City) for a project generally described as the Papillion Creek Water Resource Recovery Facility (PCWRRF) IBM Maximo Migration project (PROJECT). Project Understanding With this PROJECT, the City intends to implement Asset Management recommendations to migrate the PCWRRF’s existing asset data in the City’s IBM Maximo Computerized Maintenance Management System (CMMS) software to the current version. This PROJECT also includes training of City staff regarding the use of Maximo software. This PROJECT will help the City continue closing Capacity, Management, Operation and Maintenance (CMOM) gaps by coordinating PCWRRF data with similar data at other sites in the City’s wastewater system and support coordinated management and planning. ARTICLE 1 - Scope of Services The Provider will provide professional services to assist the City with upgrading and migrating PCWRRF existing asset and related data from the existing Maximo version (v) 7.1.0.8 system to the current Maximo v7.6.1.1 for the purpose of tracking assets, planning and tracking operation and maintenance activities, and providing reporting capabilities. This work will also support the long-term operation, maintenance, and management of the City’s wastewater system assets. Provider coordinated with DOTComm to establish a new City server to host the Maximo v7.6.1.1 software as part of a previous project under a separate contract (Lift Station CMMS Implementation, Amendment 1 - Levee Asset Maximo Implementation). It is understood that Mr. Justin Ward will serve as the City’s representative throughout PROJECT execution. Emily Holtzclaw will serve as the Provider’s Project Manager. Matt Crowley will serve as the Provider’s Quality Control (QC) Reviewer. Provider will perform contracting, invoicing, and management of Project team, budget, and schedule. Provider will provide periodic progress reports and invoices in a format acceptable to the City. Independent internal QC of modeling efforts will be performed. Task 1: PCWRRF Data Migration Task 1.1: Create Site and Locations Provider created the “Site” and “Location” records in the City’s new Maximo v7.6.1.1 system for the PCWRRF as part of a previous project. The “Site” and “Location” records were setup using the Asset Definition and Location hierarchy defined during the Lift Station Asset CITY OF OMAHA – PCWRRF IBM MAXIMO MIGRATION OMA/EXHIBITB_SCOPE_OMAHA_PCWRRFMAXIMOMIGRATION_JEG_REV5.DOCX 2 Definition and Hierarchy workshops on January 29 and 30, 2020 as part of a separate contract (Lift Station CMMS Implementation). The three Sites set up in the City’s Maximo v7.6.1.1 are for the 1) PCWRRF (the short name is “PAPIO” in Maximo), 2) Missouri River Water Resource Recovery Facility (MRWRRF) (the short name is “MORIVER” in Maximo), and 3) the Flood Protection System and collection system lift stations and related facilities (Levee and Lift Stations) (the short name is “LEVEE” in Maximo). It is assumed that up to five (5) additional Locations may be needed for PCWRRF in Maximo v7.6.1.1 to support assets that are currently not in the existing PCWRRF Maximo v7.1.0.8 system. Task 1.2: Export/Import Classifications The Provider will work with City staff to confirm Classifications that are still used in the existing PCWRRF Maximo v7.1.0.8 system. Those Classifications will be imported into the Maximo v7.6.1.1 system using the Maximo Integration Framework (MIF). Task 1.3: Export/Import Assets The Provider will work with City staff to review existing PCWRRF assets in the Maximo v7.1.0.8 that need to be migrated to the Maximo v7.6.1.1 system. The Provider will use a combination of creating assets manually through the Maximo interface and mass loading of assets using the Maximo MIF Import/Export functionality. During the asset review process the Provider and City staff will review “Priority” values on existing asset records and will change as needed. A Priority will be given to new asset records to be added. When work orders are created against the asset, the work order will adopt the asset’s Priority. Task 1.4: Export/Import Preventive Maintenance (PM) Records and Job Plans The Provider will coordinate with City staff to review existing PCWRRF PM and Job Plan records and determine what records can be migrated to the Maximo v7.6.1.1 system. The Provider will work with City staff to create PM records related to the PCWRRF and related assets that will be scheduled to generate work orders automatically using the Maximo Cron Task. Sequenced Job Plans will be developed and associated to the PM records. This allows for work orders to be generated from the same PM but have different Job Tasks. An example of this would be assets that have different maintenance tasks to be performed at different times such as for quarterly, semi-annual, and annual work orders. Each PM record will have an initial Priority of 1 to 5 based on Maximo’s default settings and input from City staff, with 5 being the highest and 1 being the lowest. These Priorities can be adjusted as needed with input from the City. When work orders are generated from the PM system, the work order will adopt the PM record’s Priority. If no PM priority is designated the work order will adopt the asset’s Priority. Provider will populate other properties on the PM records including PM Description, Work Type, Work Order Status, Next Due Date, and Owner. The Job Plans will need to have the duration property populated. The duration property is the estimated time it should take to complete the Job Plan. Once the PM records are populated in Maximo v7.6.1.1, the Provider will run a forecasting report and a Business Intelligence and Reporting Tools (BIRT) bar chart report showing the forecasted work over the next year. Task 1.5: Export/Import Storerooms, Items, and Inventory CITY OF OMAHA – PCWRRF IBM MAXIMO MIGRATION OMA/EXHIBITB_SCOPE_OMAHA_PCWRRFMAXIMOMIGRATION_JEG_REV5.DOCX 3 The Provider will work with City staff to import storeroom, item, and inventory records from the existing Maximo v7.1.0.8 and additional inventory items identified by City staff and provided to Provider in an MS Excel format including information required by Maximo (item identifier, description, order unit, issue unit, re-order point, and economic order quantity). Working with City staff, appropriate reorder points, economic order quantities, and default venders will be assigned to each inventory item. A current inventory count would need to be to be supplied to be able to use the inventory effectively. Task 1.6: Create Security Groups The Provider will work with City staff to create Security Groups, to which City Maximo users will be associated. “Start Centers” (sometimes referred to as a dashboard) in Maximo are directly associated to a Security Group. The Start Center allows the users to quickly and easily view important data and metrics, such as Key Performance Indicators (KPIs). A Security Group will be created for each group of users requiring different rights within Maximo (example: Superintendent, Supervisor/Foreman, Technician). Task 1.7: Create Users / Persons / Labor The Provider will work with City staff to create and set up the “User”, “People”, and “Labor” records in Maximo. Task 1.8: Export/Import Work Orders The Provider will migrate five years of historical work orders from the PCWRRF’s existing Maximo v7.1.0.8 to the new Maximo v7.6.1.1 system. This will encompass about 40,000 work orders and approximately 256,000 records, which includes the work order task records. The import process is a multi-step process that will import work orders, work order details, work order hierarchy, labor transactions, and material transactions. Task 1.9: Set Up Start Centers The Provider will work with City staff to set up Start Centers for the Superintendent and Supervisor security groups. This will include sections for Favorite Applications, KPIs, and Result Set record listings/charts. Task 1.10: Review / Create BIRT Reports The Provider will work with City staff to review Maximo’s out of the box BIRT reports and existing custom reports to determine if they are sufficient to meet the City’s needs or require minor modification. It may be determined that additional reports are needed, and the Provider will work with the City to scope, develop, and test up to five (5) additional reports (assuming up to 10 hours each) as part of this scope. If additional custom reports are needed by the City beyond the aforementioned assumption additional scope, fee and potentially schedule will be required as part of future work and is not included in this scope of work. Task 2 – Maximo Training Provider will develop and facilitate Maximo v7.6.1.1 training sessions for attendees selected by the City, who are assumed to have varying levels of experience with and differing roles for the use of IBM Maximo. The intent of the training sessions is to provide a detailed orientation, CITY OF OMAHA – PCWRRF IBM MAXIMO MIGRATION OMA/EXHIBITB_SCOPE_OMAHA_PCWRRFMAXIMOMIGRATION_JEG_REV5.DOCX 4 familiarizing the trainees with a practical and hands-on understanding of the Maximo software use and business process. Because the agenda and materials will be the same, Maximo training sessions described below will be developed to address the needs of City staff at all three Sites; PCWRRF, MRWRRF, and the Levee and Lift Stations. Provider assumes that the City staff from each of the three Sites will attend the same training sessions and separate sessions will not be provided for each Site. Provider determined the total cost of developing and facilitating the Maximo training for all three Sites and divided it according to the estimated relative number of staff attending per Site. Therefore, the cost for PCWRRF staff to attend training included in Article 3 – Compensation is a part of the actual total cost and it is assumed that the City will compensate Provider for the remaining parts of the total cost of training through executing two separate additional contracts that address the migration of existing Maximo data and training for staff at the other two Sites; MRWRRF and the Levee and Lift Stations. In the event that all three contracts are not executed additional compensation would be required to complete this task which would necessitate the execution of a mutually agreeable contract amendment. Task 2.1 Staff Roles Confirmation and Maximo Training Sessions Provider will perform a 1-hour meeting with City staff to confirm what roles various City staff need to be able to perform in Maximo for all three Sites. Based on previous discussions with City staff, it is expected that the City staff interacting with the Maximo system are System Administrator, Superintendent, Supervisor/Foreman, Storeroom Supervisor, and select Technicians. Provider will develop and facilitate up to 16 hours of training course that will be an overview of the types of activities end users will utilize in Maximo. Training will occur over several days based on City staff schedules and facility availability and capacity. Some City staff will attend some of the sessions and some will attend all sessions. The training materials will provide high level information to promote user understanding. The training curriculum content and appropriate attendees is provided in Table B.1 below. Table B.1 – IBM Maximo training curriculum content PCWRRF IBM Maximo Migration Curricula Item Outline Recommended Attendees Administration Training – one half day (4 hours) Administration Training •Application support •Report Administration •Start Center – Create/Update •System module - Utilities & Tools •Chart of Accounts •Administration – Org, Sites, Resources, Person Groups, Classifications •Security – Security Groups, Users System Administrator Other relevant staff determined by City during staff role confirmation meeting, possibly Supervisors End User Training (two 4- hour sessions – totaling 8 hours) CITY OF OMAHA – PCWRRF IBM MAXIMO MIGRATION OMA/EXHIBITB_SCOPE_OMAHA_PCWRRFMAXIMOMIGRATION_JEG_REV5.DOCX 5 Curricula Item Outline Recommended Attendees Getting Started •Logging on / navigating through Maximo •Using system HELP •Start Centers: results set and KPIs •Record Filtering / Advanced Search All Assets •Add / Retire / Modify assets •Add / Modify classifications •Add / Modify failure classes •Open Drilldown All Locations •Add / Retire / Modify locations •Location hierarchy •Open Drilldown All Work Management •Creation and scheduling of Work Orders •Adding resources and assets to Work Orders •Management of Work Orders •Job Plans, PM Schedules All Planning •Job Plans •Safety Plans •Routes All Preventive Maintenance •Add / Retire / Modify PM records •Frequency •Job Plan sequencing All Start Centers •Favorite Applications •Result Sets / Charts •KPIs All Reporting •Running Custom Reports •Creating Quick (Ad-Hoc) Reports All Inventory •Adding materials to work orders All Q/A for All Attendees •Q/A session for any outstanding issues All Material Management Training – one half day (4 hours) CITY OF OMAHA – PCWRRF IBM MAXIMO MIGRATION OMA/EXHIBITB_SCOPE_OMAHA_PCWRRFMAXIMOMIGRATION_JEG_REV5.DOCX 6 Curricula Item Outline Recommended Attendees Inventory •Storerooms •Item Master •Inventory – Reorder Point, Economic Order Quantity •Transactions – Issues, Returns, Transfers, Adjustments Storeroom Supervisor Supervisor/Foreman Purchasing •Company Master •Companies •Purchase Request •Purchase Orders •Receiving Storeroom Supervisor Supervisor/Foreman Q/A for Supervisors •Q/A session for any outstanding issues Storeroom Supervisor Supervisor/Foreman The training will require the following hardware, software, and facilities to be provided by the City: •An overhead projector or large video screen that is compatible with a workstation/laptop using MS PowerPoint. •Either a Wi-Fi connection to the internet for Provider’s instructor or a workstation with network connection (for internet access) and login credentials with access to Maximo software for the instructor. •A training room with sufficient capacity to seat all attendees with a computer workstation with City network and internet connections for each attendee. •Computer workstations require Internet Explorer 11, Google Chrome v66 or above, Google Edge, or Mozilla Firefox ESR v60 or above. •Whiteboard for writing upon during discussions. If facility does not have a white board Provider will provide blank large paper flip charts and markers. •DOTComm will provide a dedicated Maximo training server (MS Windows server) of the same system capabilities/specifications as the Maximo v7.6.1.1 production server provided by DOTComm previously. DOTComm will provide this training server with an associated SQL server instance for the Maximo training database. Provider will install Maximo v7.6.1.1 software on the training server. This training server will be used for Maximo training and as an administrative development server in the long-term. DOTComm will install a backup copy of the production version of the Maximo v7.6.1.1 SQL database onto the training server at least one week prior to the first training date to allow Provider to check the data before the training event. Task 2.2 - On-call Maximo Administration Support CITY OF OMAHA – PCWRRF IBM MAXIMO MIGRATION OMA/EXHIBITB_SCOPE_OMAHA_PCWRRFMAXIMOMIGRATION_JEG_REV5.DOCX 7 The successful implementation of a CMMS requires a system administrator with sufficient time and training to maintain the needs of the Maximo software administration upkeep and to support City staff needs when questions arise. It is Provider’s understanding that the City intends to assign staff to serve this role in the long-term. In the interim period until a Maximo administration City staff person is identified and in position, Provider will serve in this Maximo system administrator role. Provider will provide up to 96 hours of on-call labor support for all three Sites until the hours are expended, assuming and average of 2-hours per week for one year. These hours will be expended as needed, and not necessarily a set amount each week. It is anticipated that the on-call funds will be front end loaded, expending more at the beginning of implementation and less over time. If the City integrates an internal Maximo system administrator before these funds are expended, the remaining funds can be used to support Provider’s time to train the City’s system administrator and provide technical support until the funds are expended. Provider assumes that the City staff from all three Sites will use Provider’s services for this on- calls support and the overall cost was divided among the three contracts (one contract per Site). Therefore, the cost for PCWRRF on-call Maximo administrative support included in Article 3 – Compensation is a part of the total assumed 96 hours of support (10 hours for PCWRRF). If this on-call support is not needed, these funds will not be expended. Assumptions: The following are assumptions made for this Project Scope of Work. •City has an existing functional Maximo v7.1.0.8 system for the PCWRRF and maintain Provider’s current access to the City’s Maximo v7.6.1.1 system with active credentials for a Virtual Private Network (VPN) connection. •City will separately procure the current IBM Maximo software licensing, required supporting server hardware and SQL server instance, and additional customer service contracts. •The Task 2 level of effort contained within this scope’s Article 3 – Compensation is pro- rated based on the approximate number of training attendees from the PCWRRF. It assumes that work at all three Sites will be contracted by City with Provider as the cost of training material preparation and on-call Maximo administrative support is being shared between the three Sites. If the Maximo migration and training work at one or more of the other Sites is not contracted, additional compensation will be required to complete the Task 2 scope items in this scope. •The scope and fee assume that up to six trips of a one-week (Monday through Friday) duration each will be needed for one person from Provider’s staff. Actual trip timing, duration, and support purposes will vary based on City staff availability and as needed based on the progress of the work. If travel restrictions are in place, Provider will work with City staff virtually as much as practical. The expense budget for these trips assumes that all three contracts (one for each of the three Sites) will be executed and delivered simultaneously. The total expense budget is assumed to be spread equally across the three contracts and if the Maximo migration and training work at one or more of the CITY OF OMAHA – PCWRRF IBM MAXIMO MIGRATION OMA/EXHIBITB_SCOPE_OMAHA_PCWRRFMAXIMOMIGRATION_JEG_REV5.DOCX 8 other Sites is not contracted, additional compensation will be required to cover the expenses for this scope. o The initial trip is to migrate the PCWRRF data from Maximo v7.1.0.8 to Maximo v7.6.1.1 (Tasks 1.1 through 1.3). o The second trip is to build out the PM Records and Job Plans (Task 1.4) and to work with City staff to address Storeroom data (Task 1.5). o The third trip is to address Security Groups, Users (Tasks 1.6 and 1.7). o The fourth trip is to address Work Orders and Start Centers (Tasks 1.8 and 1.9). o The fifth trip is to address BIRT reports (Task 1.10). o The sixth trip is to prepare for and implement the training sessions (Task 2.1). o It is assumed no travel will be needed for the Task 2.2 On-Call Maximo Administration Support. •City IT will provide required hardware and software, and City staff will provide facilities and assist in coordinating availability of training attendees. City has indicated that Tuesdays and Thursdays tend to be better days for staff availability. •It is assumed that up to 15 City staff (total from the combined three Sites) will attend the training sessions. •Appropriate City staff will be available as specified in the Tasks above to support the Provider according to the Schedule in Article 2. Deliverables: The following deliverables will be provided as part of this Scope of Work. •Periodic progress reports accompanying invoices; one (1) digital (PDF format) and one (1) hard copy •The following items will be created in or imported into Maximo v7.6.1.1 o PCWRRF locations and related assets with an asset hierarchy o PCWRRF PM records, and Job Plans associated and sequenced o PCWRRF Storerooms, Items, and Inventory records o PCWRRF users and associated to appropriate security group(s) o PCWRRF Person and Labor records o PCWRRF Work Order records (5 years) imported o PCWRRF Start Centers for Superintendent and Supervisor security groups o PCWRRF BIRT Reports – Up to five (5) custom Maximo BIRT reports CITY OF OMAHA – PCWRRF IBM MAXIMO MIGRATION OMA/EXHIBITB_SCOPE_OMAHA_PCWRRFMAXIMOMIGRATION_JEG_REV5.DOCX 9 •Maximo training materials o Agenda for IBM Maximo training sessions, one electronic (PDF) and one hard copy per attendee. o One electronic (PDF) and one hard copy of training materials per attendee. ARTICLE 2 - Schedule The estimated Project schedule (Table B.2) is based upon a Notice to Proceed from the City of May 6, 2020. Work will be completed according to the schedule below, Week 1 will start after the separately contracted Levee Asset Maximo Implementation work is complete (approximately July 1, 2020). Table B.2 Project Schedule PCWRRF IBM Maximo Migration 2020 Week --> Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 1 PCWRRF Data Migration 1.1 Create Site and Locations 1.2 Export/Import Classifications 1.3 Export/Import Assets 1.4 Export/Import PM Records and Job Plans 1.5 Export/Import Storerooms, Items, and Inventory 1.6 Create Security Groups 1.7 Create Users / Persons / Labor 1.8 Export/Import Work Orders 1.9 Set Up Start Centers 1.10 Review / Create BIRT Reports 2 Maximo Training 2.1 Staff Roles Confirmation and Maximo Training Sessions Staff Roles Train- ing CITY OF OMAHA – PCWRRF IBM MAXIMO MIGRATION OMA/EXHIBITB_SCOPE_OMAHA_PCWRRFMAXIMOMIGRATION_JEG_REV5.DOCX 10 2020 Week --> Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 2.2 On-call Maximo Administration Support Extend until funds spent ARTICLE 3 - Compensation Compensation by City to Provider for the proposed services described above will be as described in attached Exhibit C. EXHIBIT “C” BREAKDOWN OF COSTS ExhibitC_Compensation_Omaha_PCWRRFMaximoMigration_Rev3.docx Exhibit C COMPENSATION Papillion Creek Water Resource Recovery Facility IBM Maximo Migration Compensation by City of Omaha (City) to Jacobs Engineering Group Inc. (Provider), for the proposed services described in Exhibit B, Scope of Services will be as follows: A. COST REIMBURSABLE-MULTIPLIER (TIME AND EXPENSE) For services enumerated in the Scope of Services above, Provider’s Salary Costs multiplied by a factor of 2.13 Salary Cost Multiplier, plus Direct Expenses, plus a service charge of 10 percent on Direct Expenses and 10 percent of subcontracts and outside services, plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. At Provider’s discretion, billing rates for certain subject matter experts may be capped to a value less than the bill rate computed based on the multiplier noted above. B. BUDGET The maximum cost for this Project, as defined by services described in the Scope of Services outlined in Exhibit B is Seventy-four Thousand, Two Hundred Seventy-two Dollars and Four Cents ($74,272.04), which will be billed on a “time and materials” basis. Provider may utilize the compensation between individual tasks requested by the City but shall not exceed the maximum amount of $74,272.04 unless approved in writing by the City through a contract amendment to this agreement. Provider is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is City obligated to pay Provider beyond these limits. When budget has been increased, Provider’s excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. C. DIRECT EXPENSES Direct Expenses are those necessary costs and charges incurred for the Project including, but not limited to: (1) the direct costs of transportation and equipment and supplies; (2) Provider’s current standard rate charges for direct use of Provider’s vehicles, laboratory test and analysis, and certain field equipment; (3) Provider’s standard project charges for computing systems, and special health and safety requirements of OSHA; and (4) mileage will be charged at current IRS audit rates at time of services. A summary of Provider’s task budgets is included in Table C below. ExhibitC_Compensation_Omaha_PCWRRFMaximoMigration_Rev3.docx TABLE C Schedule of Hourly Rates, 2020* PCWRRF IBM Maximo Migration Staff Name Hours Cost Task 1 - PCWRRF Data Migration Matt Crowley/O&M Specialist 8 $1,931.42 Don Cathorall/Maximo Specialist 272 $55,957.49 Emily Holtzclaw/Project Manager 12 $3,111.02 Task 1 total Labor 292 $60,999.93 Task 2 – Maximo Training Don Cathorall/Maximo Specialist 44 $9,051.95 Technical Editor 8 $920.16 Task 2 total Labor 52 $9,972.11 Expenses (including travel for 1 person, 2 trips) $3,300.00 Total Cost $74,272.04 Hourly rates include allowances for salary, payroll taxes, fringe benefits, overhead, and profit, but do not include allowances for Direct Expenses. EXHIBIT "D" SUPPLEMENTAL PROVISIONS 1 EXHIBIT “D” SUPPLEMENTAL PROVISIONS Papillion Creek Water Resource Recovery Facility (PCWRRF) IBM Maximo Migration ARTICLE 1. SCOPE OF SERVICES Provider will perform the Scope of Services set forth in Exhibit “B”. ARTICLE 2. COMPENSATION City will compensate Provider as set forth in Exhibit C. Work performed under this AGREEMENT may be performed using labor from affiliated companies of Provider. Such labor will be billed to City under the same billing terms applicable to Provider’s employees. ARTICLE 3. TERMS OF PAYMENT City will pay Provider as follows: 3.1 Invoices and Time of Payment Provider will issue monthly invoices pursuant to Exhibit “C”. Invoices are due and payable within 30 days of receipt. 3.2 Interest 3.2.1 City will be charged interest at the rate of 1- 1/2% per month, or that permitted by law if lesser, on all past-due amounts starting 30 days after receipt of invoice. Payments will first be credited to interest and then to principal. 3.2.2 In the event of a disputed billing, only the disputed portion will be withheld from payment, and City shall pay the undisputed portion. City will exercise reasonableness in disputing any bill or portion thereof. No interest will accrue on any disputed portion of the billing until mutually resolved. 3.2.3 If City fails to make payment in full within 30 days of the date due for any undisputed billing, Provider may, after giving 7 days' written notice to City, suspend services under this AGREEMENT until paid in full, including interest. In the event of suspension of services, Provider will have no liability to City for delays or damages caused by City because of such suspension. ARTICLE 4. OBLIGATIONS OF Provider 4.1 Standard of Care The standard of care applicable to Provider's Services will be the degree of skill and diligence normally employed by professional engineers or consultants performing the same or similar Services at the time said services are performed. Provider will reperform any services not meeting this standard without additional compensation. 4.2 Subsurface Investigations In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of Provider. 4.3 Provider's Personnel at Construction Site 4.3.1 The presence or duties of Provider's personnel at a construction site, whether as onsite representatives or otherwise, do not make Provider or Provider's personnel in any way responsible for those duties that belong to City and/or the construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the construction Contract Documents and any health or safety precautions required by such construction work. 4.3.2 Provider and Provider's personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions and have no duty for inspecting, noting, observing, correcting, or reporting on health or safety deficiencies of the construction contractor(s) or other entity or any other persons at the site except Provider's own personnel. 4.3.3 The presence of Provider's personnel at a construction site is for the purpose of providing to City a greater degree of confidence that the completed construction work will conform generally to the construction documents and that the integrity of the design concept as reflected in the construction documents has been implemented and preserved by the construction contractor(s). Provider neither guarantees the performance of the construction contractor(s) nor assumes responsibility for construction contractor's failure to perform work in accordance with the construction documents. For this AGREEMENT only, construction sites include places of manufacture for materials incorporated into the construction work, and construction contractors include manufacturers of materials incorporated into the construction work. 4.4 Opinions of Cost, Financial Considerations, and Schedules In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, Provider has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that may 2 materially affect the ultimate PROJECT cost or schedule. Therefore, Provider makes no warranty that City's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from Provider's opinions, analyses, projections, or estimates. If City wishes greater assurance as to any element of PROJECT cost, feasibility, or schedule, City will employ an independent cost estimator, contractor, or other appropriate advisor. 4.5 Construction Progress Payments Recommendations by Provider to City for periodic construction progress payments to the construction contractor(s) will be based on Provider's knowledge, information, and belief from selective sampling that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by Provider to ascertain that the construction contractor(s) have completed the work in exact accordance with the construction documents; that the final work will be acceptable in all respects; that Provider has made an examination to ascertain how or for what purpose the construction contractor(s) have used the moneys paid; that title to any of the work, materials, or equipment has passed to City free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between City and the construction contractors that affect the amount that should be paid. 4.6 Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. Provider is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. 4.7 Access to Provider's Accounting RecordsReserved Provider will maintain accounting records, in accordance with generally accepted accounting principles. These records will be available to City during Provider's normal business hours for a period of 1 year after Provider's final invoice for examination to the extent required to verify the direct costs (excluding established or standard allowances and rates) incurred hereunder. City may only audit accounting records applicable to a cost-reimbursable type compensation. 4.8 Provider's Insurance Provider will maintain throughout this AGREEMENT the following insurance: (a) Worker's compensation and employer's liability insurance as required by the state where the work is performed. (b) Comprehensive automobile and vehicle liability insurance covering claims for injuries to members of the public and/or damages to property of others arising from use of motor vehicles, including onsite and offsite operations, and owned, nonowned, or hired vehicles, with $1,000,000 combined single limits. (c) Commercial general liability insurance covering claims for injuries to members of the public or damage to property of others arising out of any covered negligent act or omission of Provider or of any of its employees, agents, or subcontractors, with $1,000,000 per occurrence and in the aggregate. (d) Professional liability insurance of $1,000,000 per occurrence and in the aggregate. (e) City will be named as an additional insured with respect to Provider's liabilities hereunder in insurance coverages identified in items (b) and (c) and Provider waives subrogation against City as to said policies. ARTICLE 5. OBLIGATIONS OF City 5.1 City-Furnished Data City will provide to Provider all data in City's possession relating to Provider's services on the PROJECT. Provider will reasonably rely upon the accuracy, timeliness, and completeness of the information provided by City. 5.2 Access to Facilities and Property City will make its facilities accessible to Provider as required for Provider's performance of its services and will provide labor and safety equipment as required by Provider for such access. City will perform, at no cost to Provider, such tests of equipment, machinery, pipelines, and other components of City's facilities as may be required in connection with Provider's services. 5.3 Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, City will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights-of-way, and access necessary for Provider's services or PROJECT construction. 5.4 Timely Review City will examine Provider's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as City deems appropriate; and render in writing decisions required by City in a timely manner. 5.5 Prompt Notice City will give prompt written notice to Provider whenever City observes or becomes aware of any development that affects the scope or timing of Provider's Services, or of any defect in the work of Provider or construction contractors. 5.6 Asbestos or Hazardous Substances 5.6.1 If asbestos or hazardous substances in any form are encountered or suspected, Provider will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. 5.6.2 If asbestos is suspected, Provider will, if 3 requested, manage the asbestos remediation activities using a qualified subcontractor at an additional fee and contract terms to be negotiated. 5.6.3 If hazardous substances other than asbestos are suspected, Provider will, if requested, conduct tests to determine the extent of the problem and will perform the necessary studies and recommend the necessary remedial measures at an additional fee and contract terms to be negotiated. 5.6.4 Client recognizes that Provider assumes no risk and/or liability for a waste or hazardous waste site originated by other than Provider. 5.7 Contractor Indemnification and ClaimsReserved 5.7.1 City agrees to include in all construction contracts the provisions of Article 4.3, Provider's Personnel at Construction Site, and provisions providing contractor indemnification of City and Provider for contractor's negligence. 5.7.2 City shall require construction contractor(s) to name City and Provider as additional insureds on the contractor’s general liability insurance policy. 5.7.3 City agrees to include the following clause in all contracts with construction contractors, and equipment or materials suppliers: “Contractors, subcontractors, and equipment and material suppliers on the PROJECT, or their sureties, shall maintain no direct action against Provider, Provider's officers, employees, affiliated corporations, and subcontractors for any claim arising out of, in connection with, or resulting from the engineering services performed. City will be the only beneficiary of any undertaking by Provider." 5.8 City's InsuranceReserved 5.8.1 City will maintain property insurance on all pre-existing physical facilities associated in any way with the PROJECT. 5.8.2 City will provide for a waiver of subrogation as to all City-carried property damage insurance, during construction and thereafter, in favor of Provider, Provider's officers, employees, affiliates, and subcontractors. 5.8.3 City will provide (or have the construction contractor(s) provide) a Builders Risk All Risk insurance policy for the full replacement value of all PROJECT work including the value of all onsite City-furnished equipment and/or materials associated with Provider's services. Such policy will include coverage for loss due to defects in materials and workmanship and errors in design, and will provide a waiver of subrogation as to Provider and the construction contractor(s) (or City), and their respective officers, employees, agents, affiliates, and subcontractors. City will provide Provider a copy of such policy. 5.9 Litigation Assistance The Scope of Services does not include costs of Provider for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by City. All such Services required or requested of Provider by City, except for suits or claims between the parties to this AGREEMENT, will be reimbursed as mutually agreed. 5.10 Changes City may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect Provider's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT. ARTICLE 6. GENERAL LEGAL PROVISIONS 6.1 Authorization to Proceed Execution of this AGREEMENT by City will be authorization for Provider to proceed with the work, unless otherwise provided for in this AGREEMENT. 6.2 Reuse of PROJECT Documents All reports, drawings, specifications, documents, and other deliverables of Provider, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. City agrees to indemnify Provider and Provider's officers, employees, subcontractors, and affiliated corporations from all claims, damages, losses, and costs, including, but not limited to, litigation expenses and attorney's fees arising out of or related to the unauthorized reuse, change or alteration of these PROJECT documents. 6.3 Force Majeure Provider is not responsible for damages or delay in performance caused by acts of God, strikes, lockouts, accidents, or other events beyond the control of Provider. In any such event, Provider’s contract price and schedule shall be equitably adjusted. 6.4 Limitation of Liability 6.4.1 To the maximum extent permitted by law, Provider's liability for City's damages will not, in the aggregate, exceed $100,000. 6.4.2 This article takes precedence over any conflicting article of this AGREEMENT or any document incorporated into it or referenced by it. 6.4.36.4.2 This limitation of liability will apply whether Provider’s liability arises under breach of contract or warranty; tort; including negligence; strict liability; statutory liability; or any other cause of action, and shall include Provider’s officers, affiliated corporations, employees, and subcontractors. 6.5 Termination 6.5.1 This AGREEMENT may be terminated for convenience on 30 days' written notice, or for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance within 5 days of written notice and diligently complete the correction thereafter. 6.5.2 On termination, Provider will be paid for all authorized services performed up to the termination date plus termination expenses, such as, but not limited to, reassignment of personnel, subcontract termination costs, and related closeout costs. 6.6 Suspension, Delay, or Interruption of Work City may suspend, delay, or interrupt the Services of 4 Provider for the convenience of City. In such event, Provider's contract price and schedule shall be equitably adjusted. 6.7 No Third-Party Beneficiaries This AGREEMENT gives no rights or benefits to anyone other than City and Provider and has no third- party beneficiaries. 6.8 IndemnificationReserved 6.8.1 Provider agrees to indemnify City for any claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation costs, arising out of claims by third parties for property damage or bodily injury, including death, to the proportionate extent caused by the negligence or willful misconduct of Provider, Provider's employees, affiliated corporations, and subcontractors in connection with the PROJECT. 6.8.2 City agrees to indemnify Provider from any claims, damages, losses, and costs, including, but not limited to, attorney's fees and litigation costs, arising out of claims by third parties for property damage or bodily injury, including death, to the proportionate extent caused by the negligence or willful misconduct of City, or its employees or contractors in connection with the PROJECT. 6.9 Assignment This is a bilateral personal Services AGREEMENT. Neither party shall have the power to or will assign any of the duties or rights or any claim arising out of or related to this AGREEMENT, whether arising in tort, contract or otherwise, without the written consent of the other party. Any unauthorized assignment is void and unenforceable. The parties further agree that Provider may novate this AGREEMENT to an affiliate in the case of normal corporate restructuring, provided any such novation does not adversely affect its ability to perform this AGREEMENT. These conditions and the entire AGREEMENT are binding on the heirs, successors, and assigns of the parties hereto. 6.10 Consequential DamagesReserved To the maximum extent permitted by law, Provider and Provider's affiliated corporations, officers, employees, and any of their subcontractors, shall not be liable to forthe other City’s for any special, indirect, or consequential damages, whether such damages arise out of breach of contract or warranty, tort including negligence, strict or statutory liability, or any other cause of action. In order to protect Provider against indirect liability or third-party proceedings, City will indemnify Provider for any such damages. 6.11 WaiverReserved City waives all claims against Provider, including those for latent defects, that are not brought within 2 years of substantial completion of the facility designed or final payment to Provider, whichever is earlier. 6.12 Jurisdiction The substantive law of the state of the PROJECT site shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. 6.13 Severability and Survival 6.13.1 If any of the Provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable, the enforceability of the remaining provisions shall not be impaired thereby. 6.13.2 Limitations of liability, indemnities, and other express representations shall survive termination of this AGREEMENT for any cause. 6.14 Materials and Samples Any items, substances, materials, or samples removed from the PROJECT site for testing, analysis, or other evaluation will be returned to the PROJECT site within 60 days of PROJECT close-out unless agreed to otherwise. City recognizes and agrees that Provider is acting as a bailee and at no time assumes title to said items, substances, materials, or samples. 6.15 Engineer’s Deliverables Engineer’s deliverables, including record drawings, are limited to the sealed and signed hard copies. Computer- generated drawing files furnished by Provider are for City or others' convenience. Any conclusions or information derived or obtained from these files will be at user's sole risk. 6.16 Dispute Resolution The parties will use their best efforts to resolve amicably any dispute, including use of alternative dispute resolution options. 6.17 Ownership of Work Product and InventionsReserved All of the work product of the Provider in executing this PROJECT shall remain the property of Provider. City shall receive a perpetual, royalty-free, non- transferable, non-exclusive license to use the deliverables for the purpose for which they were intended. Any inventions, patents, copyrights, computer software, or other intellectual property developed during the course of, or as a result of, the PROJECT shall remain the property of the Provider. 6.18 Intellectual Property City acknowledges and agrees that in the performance of the development service, Provider may utilize its proprietary data, concepts, methods, techniques, processes, protocols, ideas, inventions, know-how, trade secrets, algorithm, software, works of authorship, software and hardware architecture, databases, tools, other background technologies and standards of judgment that Provider developed or licensed from third parties prior to the Effective Date (the “Pre-Existing Technology”). Subject to the terms and conditions of this AGREEMENT, Provider hereby grants to City a non- exclusive, non-transferable, royalty-free license under Provider’s Intellectual Property Rights to utilize the Pre- Existing Technology for the purpose of the City Project. City shall not, and shall not allow any third party to: (i) modify or otherwise create derivative works of the Pre- 5 Existing Technology; (ii) use the Pre-Existing Technology for any other purpose, other than the City Project; (iii) make, have made, use, reproduce, license, display, perform, distribute, sell, offer for sale, service, support, or import any product that incorporates, embodies and/or is based upon the Pre-Existing Technology; (iv) sublicense, distribute or otherwise transfer to a third party any of the Pre-Existing Technology by itself or as incorporated into software or hardware; or (v) reverse engineer, disassemble, decompile or attempt to derive the source code or underlying ideas or algorithms of the Pre-Existing Technology. Any additional use of the Pre-Existing Technology shall require a separate written license agreement.