Loading...
RES 2020-0495 - Amendment No. 1 to PSA with Snyder & Associates for OPW 53755 - Grace Street CSO Ditch Screen -1- EXHIBIT B GRACE STREET DITCH SCREEN DAMAGE ASSESSMENT OMAHA, NEBRASKA CLIENT: CITY OF OMAHA 1819 FARNAM STREET OMAHA, NEBRASKA 68183 C/O GEORGE PARIZEK ENGINEER: SNYDER & ASSOCIATES, INC. 12020 SHAMROCK PLAZA, SUITE 200 OMAHA, NEBRASKA 68154 PROJECT: GRACE STREET DITCH SCREEN DAMAGE ASSESSMENT DATE: FEBRUARY 28, 2020 PROJECT DESCRIPTION: The following scope is for additional services to supplement the agreement between Snyder & Associates, Inc. and the City of Omaha, dated December 2, 2019, for the Grace Street Ditch Screen Damage Assessment project. SCOPE OF SERVICES: I. PROJECT ADMINISTRATION A. Coordination with Levee Sponsor. B. Attend progress meetings. II. PRELIMINARY (60%) SUBMITTAL A. Prepare preliminary (60%) construction plans to include: 1. Cover sheet. 2. Tabulated quantities. 3. Reference Notes. 4. Construction Staging and Methods. 5. Basic Repair Plans. 6. Mitigation Repair Plans. 7. O&M Notes. B. Prepare preliminary (60%) opinion of probable cost. III. FINAL (95%) SUBMITTAL A. Prepare final (95%) construction plans to include: 1. Cover sheet. George Parizek City of Omaha February 28, 2020 Page 2 of 2 -2- 2. Tabulated quantities. 3. Reference notes. 4. Construction staging and methods. 5. Basic repair plans. 6. Basic repair details. 7. Mitigation repair plans. 8. Mitigation repair details. 9. O&M Notes. B. Project special provisions to supplement City of Omaha standard specifications. C. Prepare preliminary (95%) opinion of probable cost. IV. BID PHASE SERVICES A. Incorporate final design review comments by the City of Omaha. B. Submittal of special provisions, final opinion of probable cost, and signed plans and contract documents to City of Omaha. C. Assist in answering contractor questions. D. Attend pre-bid meeting. E. Prepare addenda, as necessary. F. Attend bid opening. G. Bid review and award recommendation. V. ASSOCIATED ELECTRICAL DESIGN A. Performed by Electrical Subconsultant, Enigneering Technologoies, Inc. (ETI) VI. SCHEDULE A. 60% Design Complete ……………………………………………………30 days from Notice to Proceed. B. 95% Design Complete …………………………………………………….45 days from Notice to Proceed. C. Bid Phase…………………………………………………………………...60 days from Notice to Proceed. PROJECT NAME: Mike G. Darin J. Barbara J. DIRECT Principal Principal Engineer III LABOR LS PE PE TOTAL I. Project Administration Coordination with Levee Sponsor 8 8 Progress Meetings 1124 TOTAL HOURS 1.0 1.0 10.0 12 x RATE $214.00 $203.00 $120.00 TOTAL $214.00 $203.00 $1,200.00 $1,617.00 II. Preliminary Design - 60% Submittal 22 Cover Sheet 2 Tabulated Quantities 4 Reference Notes 4 2 Construction Staging & Methods 2 4 Basic Repair Plans 4 10 Mitigation Repair Plans 4 10 O&M Notes 4 4 426 TOTAL HOURS 2 22 38 62 x RATE $214.00 $203.00 $120.00 TOTAL $428.00 $4,466.00 $4,560.00 $9,454.00 III. Final Design - 95% Submittal 22 Cover Sheet 1 Tabulated Quantities 2 Reference Notes 2 2 Construction Staging & Methods 2 2 Basic Repair Plans 4 4 Basic Repair Details 6 6 Mitigation Repair Plans 4 4 Mitigation Repair Details 6 6 O&M Notes 2 2 448 224 TOTAL HOURS 2 32 35 69 x RATE $214.00 $203.00 $120.00 TOTAL $428.00 $6,496.00 $4,200.00 $11,124.00 IV. Bid Phase Services Final Design Revisions 1 4 Contractor Questions 2 2 Attend pre-bid meeting 2 Prepare addenda, as necessary 1 4 Attend bid opening 2 Bid review and award recommendation 112 TOTAL HOURS 1 5 16 22 x RATE $214.00 $203.00 $120.00 TOTAL $214.00 $1,015.00 $1,920.00 $3,149.00 Electrical Subconsultant - ETI $4,000.00 TOTALS 55583$26,195.00 Final Project Plans STAFF HOUR ESTIMATE Exhibit C Projectl Specifications Cost Opinion Cost Opinion Preliminary Project Plans Grace Street Ditch Screen