RES 2014-1267 - Change order for Swain Construction for OPW 52542, concrete curb ramp construction otai'll NF
e RECEIVED Public Works Department
x�r`f4�f�'�'�,«��N C Omaha/Douglas Civic Center
�®, �1 '► = October 7 2014 2014 SEP 2 6 AM 11: 56 1819 Farnam Street,Suite 601
� b Omaha,Nebraska 68183-0601
(402)444-5220
AORgTED pEBR�r4� Fax(402)444-5248
CITY CLERK
City of Omaha O M A H A, N E 8 R A S K Robert G. Stubbe,P.E.
Jean Stothert,Mayor Public Works Director
Honorable President
and Members of the City Council,
Transmitted herewith is a Resolution approving a change order for OPW 52542, which is for the
Concrete Curb Ramp Construction at Various Locations project. Resolution No. 248 on
February 25, 2014 approved Swain Construction as low bidder for this project. This change
order authorizes additional expenses to construct curb ramps along the West Center Road
corridors recently added to the 2014 resurfacing package.
Swain Construction has agreed to perform all additional work for an increase in fee of
$96,037.55. All other provisions of the original contract shall remain in full force and effect.
The costs incurred will be paid from the 2010 Transportation Bond Fund 13183, Organization
117117.
The Public Works Department requests your consideration and approval of the attached
Resolution and Change Order.
Respectfully submitted, Referred to City Council for Consideration:
(--7
Robert G. Stubbe, P.E. Date Mayor's Office Date
Public Works Director
Approved as to Funding: Approved:
{ l
to he . Curtiss ate Human Rights and Relations Da
te
g
Finance Director Department
1 884htp
CITY OF OMAHA CONTRACT CHANGE ORDER Sheet 1 of 1
PUBLIC WORKS DEPARTMENT
PROJECT NO.: OPW 52542 CHANGE ORDER NO.: 2
PROJECT LOCATION: MAPA ADA Ramps
CONTRACTOR: Swain Construction DATE: September 11,2014
COUNCIL RESOLUTION NO.: 248 DATE OF RESOLUTION: February 25,2014
CONTRACT PRICE
ITEM ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE DECREASE INCREASE
CO#2 001 REPAIR 4"CONCRETE SIDEWALK SF 2,053 $ 7.73 $ 15,869.69
CO#2 002 REPAIR 6"CONCRETE SIDEWALK SF 128 $ 7.94 $ 1,016.32
CO#2 003 REPAIR CONCRETE CURB LF 842 $ 31.55 $ 26,565.10
CO#2 004 CONCRETE PAVEMENT REPAIR-L85 SY 33.71 $ 83.50 $ 2,814.79
CO#2 005 ADJUST UTILITY TO GRADE EACH 1 $ 25.00 $ 25.00
CO#2 006 CONSTRUCT CONCRETE CURB RAMPS SF 461 $ 16.00 $ 7,376.00
CO#2 007 FURNISH 2'X4'TRUNCATED DOME PANEL EACH 14 $ 199.00 $ 2,786.00
CO#2 008 CLEARING AND GRUBBING PER CORNER EACH 10 $ 127.00 $ 1,270.00
CO#2 009 BARRICADES PER CORNER EACH 10 $ 79.00 $ 790.00
CO#2 010 FURNISHING/OPERATING ARROW PANEL DAY 19 $ 46.10 $ 875.90
CO#2 011 IMPRINTED CONCRETE SIDEWALK SF 175 $ 13.65 $ 2,388.75
CO#2 012 REMOVE AND REPLACE INLET TOP EACH 12 $ 2,855.00 $ 34,260.00
TOTAL DECREASE IN CONTRACT PRICE $ -
TOTAL INCREASE IN CONTRACT PRICE $ 96,037.55
NET DIFFERENCE $ 96,037.55
BASE BID PLUS PREVIOUS CHANGE ORDERS $ 852,293.20
(REVISED)CONTRACT PRICE $ 948,330.75
CONTRACT FUNDS AVAILABLE
Comments: West Center Road, 156th to 171st,Addition.
," DATE: 7_. 7/, .._ ((i.ACCEPTED:
/
1 ,
-- (C NTRACTOTO:
R)
RECOMMENDED: DATE: 4 1/1-1
C /PROJECT MANAGER)
APPROVED: DATE:
(� CS() 9 17 7
APPROVED: r-} (DIVISION ENGINEER)
DATE: ^I ^)
--- (CITY EN
DATE Z —
/ _L/[I
APPROVED:
(PUBLIC WORKS DIRECTOR)
C-25A CITY OF OMAHA
LEGISLATIVE CHAMBER
Omaha,Nebraska
RESOLVED BY THE CITY COUNCIL OF THE CITY OF OMAHA:
WHEREAS, Swain Construction was awarded a contract by City Council Resolution No.
248 on February 25, 2014, to construct OPW 52542, being the Concrete Curb Ramp
Construction at various locations project; and,
WHEREAS, additional resurfacing areas identified for 2014 construction necessitated
increased quantities for the repair and construction of the concrete curb ramps along these areas;
and,
WHEREAS, Swain Construction has agreed to perform this increase in scope for a net
additional cost of $96,037.55, as noted on the attached Change Order No. 2, which by this
reference is made a part hereof, which will be paid from the 2010 Transportation Bond fund
13183, Organization 117117.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF OMAHA:
THAT, as recommended by the Mayor, Change Order No. 2 for Swain Construction to
construct the necessary modifications to OPW 52542, being the Concrete Curb Ramp
Construction at Various Locations project, is hereby approved.
BE IT FURTHER RESOLVED:
THAT, the Finance Department is authorized to pay an additional $96,037.55 for these
changes from the 2010 Transportation Bond fund 13183, Organization 117117.
1883htp
APPROVED AS TO FORM:
(.;g'
, CITY ATTORNEY DATE
By 144.11
Councilmember
Adopted OCT 0 7 24f4 . 7-0
... .. ././..:7-//
� u ij ity Clerk
Approve`d �`
Mayor
NO. ...../` o 7
Resolution by
Res. that, as recommended by the Mayor,
Change Order No. 2 for Swain Construction
to construct the necessary modifications to
OPW 52542, being the Concrete Curb Ramp
Construction at Various Locations project, is
hereby approved; and that the Finance
Department is authorized to pay an additional
$96,037.55 for these changes from the 2010
Transportation Bond fund 13183,
Organization 117117.